Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | ₹2.5 L | L1 | Accepted-AOC Ag executed |
| 2 | Rejected-Technical KARUKAMALAYIL PERUMBAIKADU P O KOTTAYAM | KOTTAYAM | KOTTAYAM | KERALA | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | SajeeshLukose L2 | John Thomas L1 |
|---|---|---|---|---|---|
| 1.00Re-tarring | |||||
| 1.00 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 46.45 | sqm | 400 ₹18,580 | 323.59 ₹15,030.76 |
| 1.00 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 68.85 | sqm | 450 ₹30,982.50 | 418.33 ₹28,802.02 |
| 1.00 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 660 | sqm | 18 ₹11,880 | 15.79 ₹10,421.40 |
| 1.00 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65) | 660 | sqm | 303 ₹2.0 L | 302.65 ₹2.0 L |
Updated dates
Tender Value
₹2.5 L
EMD Value
₹6,350
Closing Date
4 Nov 2025, 10:00 amClosed
Assistant Engineer
Office of The Assistant Engineer, LSGD Section, Ettumanoor Municipality
Annual Plan-Project no -710/25 Peringattu kalappurackal road maintanance ward 21- Ettumanoor municipality-General Civil Work
2025_LSGD_803590_2
E1-10/AE/ETMR/25-26 (9)
Open Tender
Civil Works - Roads
180 days
Ettumanoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹560
₹6,350
17 Apr 2026
24 Oct 2025
4 Nov 2025
24 Oct 2025
4 Nov 2025
24 Oct 2025
Amount
Re-tarring
75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
75.5.2.1pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65)
SajeeshLukose (BID ID -2426688)
Bidder Name
SajeeshLukose
John Thomas
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
PAG.pdf
Tender Documents • 0.68 MB
viewsbd.pdf
Tender Documents • 1.83 MB
BOQ_1362560.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid