Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹65.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹66.8 L+₹1.1 L (1.62%)Admitted-Fee/PreQual/Technical/Finance | ₹66.8 L+₹1.1 L (1.62%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | M/S NISHA TRADERS L2 | SHIVAM CIVIL ENGINEERING CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed. | 1,280 | Sq. Mtr. | 12 ₹15,360 | 7 ₹8,960 Lowest |
| 2.00 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. | 47 | Cu.Mtr. | 460 ₹21,620 | 150 ₹7,050 Lowest |
| 3.00 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. | 38 | Cu.Mtr. | 1,050 ₹39,900 | 160 ₹6,080 Lowest |
| 4.00 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1,500 mm. | 315 | Cu. Mtr. | 125 ₹39,375 Lowest | 180 ₹56,700 |
| 5.00 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work). With earth obtained from excavation of foundation. | 255 | Cu. Mtr. | 80 ₹20,400 | 50 ₹12,750 Lowest |
| 6.00 | Earth work in filling in Ground with prepaired soil (50% of Good earth + 50% of Silver sand + furtilized materials if any), in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work) | 2,600 | Cu. Mtr. | 665 ₹17,29,000 Lowest | 1,658 ₹43,10,800 |
| 7.00 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 54 | Cu. Mtr. | 940 ₹50,760 Lowest | 1,800 ₹97,200 |
| 8.00 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 820 | Sq. Mtr. | 360 ₹2,95,200 Lowest | 400 ₹3,28,000 |
| 9.00 | P.C.C. (1:2:4) | 75 | Cu. Mtr. | 5,400 ₹4,05,000 Lowest | 6,800 ₹5,10,000 |
| 10.00 | Hire and labour charges for shuttering with centering and necessary staging upto 4 mtr. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. | 125 | Sq. Mtr. | 350 ₹43,750 Lowest | 400 ₹50,000 |
Tender Value
₹65.8 L
Closing Date
4 Sept 2026, 2:00 pmClosed
Executive Engineer(Acting), ED
Engineering Division, IIM Calcutta, Kolkata 700104
Development of football ground with jogging track in IIMC campus.
2026_IIMCT_924054_1
ED/IIMC/NIT/1/26-27/107 2nd Call
Limited
Civil Works
Item Rate
90 days
IIM Calcutta, D.H Road, Joka, Kolkata 700104
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
7 Sept 2026
28 Aug 2026
5 Sept 2026
28 Aug 2026
4 Sept 2026
28 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed. | - | Sq. Mtr. | - | - |
| 2 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. | - | Cu.Mtr. | - | - |
| 3 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. | - | Cu.Mtr. | - | - |
| 4 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. Depth of excavation not exceeding 1,500 mm. | - | Cu. Mtr. | - | - |
| 5 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work). With earth obtained from excavation of foundation. | - | Cu. Mtr. | - | - |
| 6 | Earth work in filling in Ground with prepaired soil (50% of Good earth + 50% of Silver sand + furtilized materials if any), in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work) | - | Cu. Mtr. | - | - |
| 7 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | - | Cu. Mtr. | - | - |
| 8 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | - | Sq. Mtr. | - | - |
| 9 | P.C.C. (1:2:4) | - | Cu. Mtr. | - | - |
| 10 | Hire and labour charges for shuttering with centering and necessary staging upto 4 mtr. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. | - | Sq. Mtr. | - | - |
stage.html
html • 0.02 MB
finance_971027.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_971027.xls
BOQ • 0.24 MB
GCC.pdf
Tender Documents • 0.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .