Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.1 LAdmitted-Finance 247 DHAMPURA LAKSAR ROAD DISTT HARIDWAR 249408 UTTARAKHAND | HARIDWAR | HARIDWAR | UTTARAKHAND | 249408 | ₹48.1 L | L1 | Admitted-Finance |
| 2 | L2₹48.1 LAdmitted-Finance | ₹48.1 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical The bidder did not qualifies TQR |
| Sl No | Description | Qty | Unit | MAHAVEER TECHNO ENGINEERS L1 | MAYANK ELECTRICAL WORK L2 |
|---|---|---|---|---|---|
| 1.00 | The following tests are to be carried out for "Work of residual Life assessment Test of transformers":-
(a) Capacitance & TanDelta of Bushings & Windings.
(b) Turns ratio test.
(c) Vector grup test.
(d) Short circuit impedance test.
(e) Magnetizing current test.
(f) Magnetic balance test.
(g) Winding resistance test.
(h) Insulation Resistance measurement.
(i) Sweep Frequency Response Analysis (SFRA).
(j) Frequency Response on Stray Load (FRSL).
(k) Leakage reactance & Impedance Measurement.
(l) Online partial discharge measurement test.
(m) Thermographic Measurement.
(n) Noise measurement test.
(o) Vibration measurement test.
3X5MVA, 132/33KV T/F Bank-I (GEC make) & 3X5MVA, 132/33KV T/F Bank-II (Bharat Bijlee Make ) at 132/33KV S/s, Ranikhet - 06 Nos.
20MVA, 132/33KV T/F-II (Alstom make) & 20MVA, 132/33KV T/F-III (Crompton Greaves make) at 132/33KV S/s, Almora - 02 Nos.
3x5MVA, 132/33KV T/F Bank- I (GEC make) & 3X5MVA, 132/33KV T/F Bank-II (Kanhor make) 20MVA, 132/33KV T/F (NGEF make) at 132/33KV S/s, Pithoragarh - 07 Nos. | 15 | Nos. | 31,05,000 ₹36.6 L | 31,27,500 ₹36.9 L |
| 2.00 | Work of opening and re-jumpering of both HV & LV side jumpers including opening & reconnection of earthing of both HV & LV sides.
132/33KV S/s, Ranikhet - 24 Nos.
132/33KV S/s, Almora - 12 Nos.
132/33KV S/s, Pithoragarh - 30 Nos. | 66 | Nos. | 3,63,000 ₹4.3 L | 3,30,000 ₹3.9 L |
| 3.00 | The following Oil Testing of Transformers.
DGA of Transformer Oil
(a) Methane (CH4).
(b) Ethylene (C2H4).
(c) Ethane (C2H6).
(d) Acetylene (C2H2).
(e) Hydrogen (H2).
(f) Carbon Monoxide (CO).
(g) Carbon Dioxide (CO2).
The work Should be carried out as per procedure of relevant IS/IEC standard.
The collection of transformer oil sample at site including all T&P for sample collection shall be in the scope of contractor.
The testing shall be carried with NABL or CPRI approved lab/ equipment.
Note:- 02 Nos. Sample shall be collected for each Transformers and 01 No. Sample from bottom & second from Top.
132/33KV S/s, Ranikhet - 12 Nos.
132/33KV S/s, Almora - 04 Nos.
132/33KV S/s, Pithoragarh - 14 Nos. | 30 | Nos. | 3,15,000 ₹3.7 L | 3,15,000 ₹3.7 L |
| 4.00 | FURAN Analysis of Transformer Oil.
132/33KV S/s, Ranikhet - 06 Nos.
132/33KV S/s, Almora - 02 Nos.
132/33KV S/s, Pithoragarh - 07 Nos. | 15 | Nos. | 1,47,000 ₹1.7 L | 1,53,000 ₹1.8 L |
| 5.00 | Corrosive Sulphurs Test of Transformer Oil.
132/33KV S/s, Ranikhet - 06 Nos.
132/33KV S/s, Almora - 02 Nos.
132/33KV S/s, Pithoragarh - 07 Nos. | 15 | Nos. | 1,42,500 ₹1.7 L | 1,53,000 ₹1.8 L |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
15 May 2026, 5:00 pmClosed
Chief Engineer
Office of Chief Engineer (OandM), PTCUL, Haldwani
Residual life assessment test of different transformers under OandM Division, PTCUL, Almora
2026_PTC21_94219_1
CE/OandM/PTCUL/HLD/04/2026-27
Open Tender
Electrical Works
180 days
Almora, Ranikhet and Pithoragarh
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,360
EE, OandM Division, PTCUL, Almora
₹1.4 L
Office of Chief Engineer (OandM), PTCUL, Haldwani
18 May 2026
14 Apr 2026
16 May 2026
14 Apr 2026
15 May 2026
14 Apr 2026
30 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | The following tests are to be carried out for "Work of residual Life assessment Test of transformers":-
(a) Capacitance & TanDelta of Bushings & Windings.
(b) Turns ratio test.
(c) Vector grup test.
(d) Short circuit impedance test.
(e) Magnetizing current test.
(f) Magnetic balance test.
(g) Winding resistance test.
(h) Insulation Resistance measurement.
(i) Sweep Frequency Response Analysis (SFRA).
(j) Frequency Response on Stray Load (FRSL).
(k) Leakage reactance & Impedance Measurement.
(l) Online partial discharge measurement test.
(m) Thermographic Measurement.
(n) Noise measurement test.
(o) Vibration measurement test.
3X5MVA, 132/33KV T/F Bank-I (GEC make) & 3X5MVA, 132/33KV T/F Bank-II (Bharat Bijlee Make ) at 132/33KV S/s, Ranikhet - 06 Nos.
20MVA, 132/33KV T/F-II (Alstom make) & 20MVA, 132/33KV T/F-III (Crompton Greaves make) at 132/33KV S/s, Almora - 02 Nos.
3x5MVA, 132/33KV T/F Bank- I (GEC make) & 3X5MVA, 132/33KV T/F Bank-II (Kanhor make) 20MVA, 132/33KV T/F (NGEF make) at 132/33KV S/s, Pithoragarh - 07 Nos. | - | Nos. | - | - | item1 |
| 2 | Work of opening and re-jumpering of both HV & LV side jumpers including opening & reconnection of earthing of both HV & LV sides.
132/33KV S/s, Ranikhet - 24 Nos.
132/33KV S/s, Almora - 12 Nos.
132/33KV S/s, Pithoragarh - 30 Nos. | - | Nos. | - | - | item2 |
| 3 | The following Oil Testing of Transformers.
DGA of Transformer Oil
(a) Methane (CH4).
(b) Ethylene (C2H4).
(c) Ethane (C2H6).
(d) Acetylene (C2H2).
(e) Hydrogen (H2).
(f) Carbon Monoxide (CO).
(g) Carbon Dioxide (CO2).
The work Should be carried out as per procedure of relevant IS/IEC standard.
The collection of transformer oil sample at site including all T&P for sample collection shall be in the scope of contractor.
The testing shall be carried with NABL or CPRI approved lab/ equipment.
Note:- 02 Nos. Sample shall be collected for each Transformers and 01 No. Sample from bottom & second from Top.
132/33KV S/s, Ranikhet - 12 Nos.
132/33KV S/s, Almora - 04 Nos.
132/33KV S/s, Pithoragarh - 14 Nos. | - | Nos. | - | - | item3 |
| 4 | FURAN Analysis of Transformer Oil.
132/33KV S/s, Ranikhet - 06 Nos.
132/33KV S/s, Almora - 02 Nos.
132/33KV S/s, Pithoragarh - 07 Nos. | - | Nos. | - | - | itme4 |
| 5 | Corrosive Sulphurs Test of Transformer Oil.
132/33KV S/s, Ranikhet - 06 Nos.
132/33KV S/s, Almora - 02 Nos.
132/33KV S/s, Pithoragarh - 07 Nos. | - | Nos. | - | - | item5 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
TenderDocument04.pdf
Tender Documents • 1.19 MB
PQRSheet04.xls
Other Document • 0.14 MB
BOQ_111514.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid