Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.3 LAccepted-AOC III 6 7 2ND FLOOR ABOVE BANK OF BARODA GOPINATH BAZAR DELHI CANTT 110 010 | DELHI CANTT | NEW DELHI | DELHI | 110010 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹28.2 L+₹18,925 (0.68%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹29.3 L+₹1.3 L (4.73%)Rejected-AOC NO 23 SECOND MAIN ROAD RAJAMMAL NAGAR MADAMBAKKAM CHENNAI 600 126 | CHENNAI | CHENGALPATTU | TAMIL NADU | 600126 | L3 | Rejected-AOC Rejected |
Tender Value
Refer Docs
EMD Value
₹65,000
Closing Date
31 Aug 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SH DC SHRAM IDSE
CWE (NW) KOCHI
COMPREHENSIVE MAINT OF CERTAIN LIFT INSTALLATIONS AT TEJAS BLDG, NIETT BLDG, DSC MD ACCN, P-280 AND P-281, DIVING SCHOOL, NSRY, NODPAC (BLDG NO P-06), PARIKSHIT BLDG,BHISMA BLDG, HEAVY ELECTRICAL BLOCK AND VEER BLOCK AT NB(K)
2023_MES_611910_1
CWE(NW)KOCHI/81379
Open Tender
Civil Works
Item Rate
330 days
KOCHI
AS PER NIT
7 documents required · 7 mandatory
₹500
GE (NS) KOCHI
₹65,000
Yes
9 Nov 2023
3 Aug 2023
2 Sept 2023
3 Aug 2023
31 Aug 2023
17 Aug 2023
Amount
Comprehensive maintenence/ repair and servicing of 02 Nos electrically operated passenger lifts of capacity 10 passengers (680 KGs) with a speed of 1.0 Mtr / Sec to served with 7 landings (G + 6 upper floors) installed at 80 CPOs / 50 POs building complete comprising with of all consumable spares / accessories which ever be required to provide smooth trouble free service to the users of 24 hours including sunday/holiday such as function of ARD , VVVF device ,all controlling cards such as(VSRL, DPS, SFRL etc), car lights/fans all controlling MCBs/contacts, panel board wiring including door roller, floor timing, call cancel timing, auto attendant mode, inter lock buzzer, fire men switch and passenger over load function, function etc must be serviceable also contractor is fully responsible to cleaning the machine during the time of serving all are specified and directed by Engr-in-charge Make :-THYSSEN KRUPP LIFT MES No 1. Lift 671/7003/10/LF/15 (Makers Sl No 13WPE02651) 2. Lift 671/7003/11/LF/15 (Makers Sl No 13WPE02654)
All as per item No 1 but for 01 electrically operated for 13 Passengers lift (1500 Kgs) with a speed of 1.0 Mtr / Sec to served with 3 landings( G + 2 Upper floors) installed at Diving school building. Make :-THYSSEN KRUPP LIFT MES No 1. Lift 972/7002 - LF/104/17 (Makers Sl No 14 GS 01932)
All as per item No 1 but for 01 Nos electrically operated passenger lifts of capacity 13 passengers (884 KGs) with a speed of 1.5 Mtr / Sec to served with 5 landings ( G + 4 upper floors) installed at NSRY Bldg no P-23 (Weccors). Make :-THYSSEN KRUPP LIFT MES No : 712/7002/LF/95/17 (Makers Sr No-15GS00873)
All as per item No 1 but for 01 electrically operated goods lifts of capacity 2000 Kgs with a speed of 0.5 Mtr / Sec to served with 5 landings ( G + 4 Upper floors) installed at NSRY Bldg no P-23 (Weccors). Make :-THYSSEN KRUPP LIFT MES No : 712/7002/LF/96/17 (Makers Sr No - 14 PV 01190)
All as per item No 1 but for 01 electrically operated goods lifts of capacity 1000Kgs with a speed of 0.5 Mtr / Sec to served with 4 landings ( G + 3 Upper floors) installed at NODPAC (Bldg P-06 ) building. Make :- THYSSEN KRUPP LIFT MES No 1. Lift 712/7002-LF/092/16 (Makers Sr No-15 WPA01811)
All as per item No 1 but for 02 electrically operated passenger lifts of capacity 13 passengers (884 KGs) with a speed of 1.5 Mtrs / Sec to served with 5 landings ( G + 4 Upper floors) installed at NIETT building. Make :- JOHNSON . LIFT MES No 1. Lift 671/7003/09/LF/15 (Makers Sl No 13020280) 2. Lift 671/7003/08/LF/15 (Makers Sl No 13020277)
All as per item No 1 but for 02 electrically operated passenger lifts of capacity 08 passengers (544 KGs) with a speed of 1.0 Mtr / Sec to served with 5 landings( G + 4 Upper floors) installed at DSC Md Accn building No 280 & 281. Make :-KONE . LIFT MES No 1. Lift 712/7011/LF/07 (Makers Sl No MDI3MB2-K-075507281) 2. Lift 712/7011/LF/07 (Makers Sl No MDI3MB2-K-075507290)
All as per item No 1 but for 01 electrically operated for 09 Passengers lift (612 Kgs) with a speed of 1.0 Mtr / Sec to served with 6 landings( G + 5 Upper floors) installed at Veer Block. Make :-THYSSEN KRUPP LIFT MES No 1. Lift 972/7002 - LF/106/17 ( Makers Sl No MI 2024 )
All as per item No 1 but for 01 electrically operated for 20 Passengers lift (1360 Kgs) with a speed of 1.0 Mtr / Sec to served with 6 landings ( G + 5 Upper floors) installed at INHS Sanjivani Ramp. Make :- THYSSEN KRUPP LIFT MES No 1. Lift 972/7002 - LF/107/17 ( Makers Sl No 17WGS 00016 )
All as per item No 1 but for 01 electrically operated for 08 Passengers lift (554 Kgs) with a speed of 1.0 Mtr / Sec to served with 2 landings ( G + 1 Upper floors) installed at Heavy Electric Shop (NSRY). Make :- OTIS LIFT MES No 1. Lift 972/7002/LF/103/17 ( Makers Sl No MK 0111775 )
All as per item No 1 but for 02 electrically operated for 08 Passengers lift (544 Kgs)) with a speed of 1.0 Mtr / Sec to served with 9 landings ( G + 8 Upper floors) installed at Parikshit Bldg. Make :- THYSSEN KRUPP LIFT MES No 1. Lift 972/7002-LF/98/17 (Makers Sl No 17WPE 00369) 2. Lift 972//7002-LF/99/17 (Makers SL No 17WPE 00368)
All as per item No 1 but for 02 electrically operated for 08 Passengers lift (544 Kgs)) with a speed of 1.0 Mtr / Sec to served with 8 landings ( G + 7 Upper floors) installed at Bhisma Bldg. Make :- THYSSEN KRUPP LIFT MES No 1. Lift 972/7002-LF/108/17 (Makers Sl No 17BP10702) 2. Lift 972//7002-LF/109/17 (Makers SL No 17BP07317)
Notes for S.No 1 to 12 :- (a) The comprehensive maintenance shall be done through OEM or authorised agency of OEM (Thysson krupp/kone/Jhonson) (b) The Contractor shall enter into a MOU (Memorandum of understanding) with the OEM for the maintenance of the Lift. (c) The above comprehensive AMC certificate shall be provided by the contractor in favour of GE (NS) before commencement of work, after acceptance of CA. (d) The parts shall be genuine and from original Equipment manufacturer (OEM) and approved by GE (e) The contractor is responsible to carried out minimum one routine check up through OEM (Once in a month) or as per the direction of Engr- in - charge to ensure the serviceability and proper functioning of the lifts in all respect ( each month will be consider as 01 Job) (f) All stainless steel parts such as lift car enclousure, opening doors, jamps, cills etc shall be thoroughly cleaned to remove corrosion, stains etc. with suitable solution.the contractyor shall also clean and properly maintain machine rooms, machineries and lift well as directed by EIC. The rates quoted for respective items shall be deemed to include the same. (g) Any breakdown/complaints shall be attend and rectify within 6 hrs. If the complaint is not attended and repaired within 24 hrs, penalty of Rs 2000/- per day will be charged. (h) The rates quoted for above item shall be included for replacement of any spares, consumables accessories like LED bulbs (inside Lift car cabin), swithces (lop, cop) becoming unserviceable during the period and no extra claim shall be allowed.
Notes for S.No 1 to 12 ( continued..) :- (j) Repairing of fireman switch wall mounted type with connection to existing wiring if found unserviceable. (k) Repair/servicing of Intercom unit from Lift Car to Ground floor and machine room for stream line communication if found unserviceable. (l) Normal ARD servicing, any major servicing of ARD will be measured separately. ARDs will be checked during each maint visit. (m) Provisioning and fixing of maintenance board for every lift with details entered as per Engg in Charge (n) The contractor should submit the payment clearance certificate from the concerned OEM of lift alongwith completion certificate. (o) The contractor is responsible to clear/empty the water from the pit within 24 hours with necessary equipments and make the lift functional (if water found filled in the pit during the rainy season). The rate for the same is deemed to include in the quoted rate.
Supply and fixing in replacement of VVVF Main drive as specified and as directed.
Supply and fixing in replacement of Automatic Rescue Device incl batteries of capacity 12V 18AH complete all as specified and as recommended by OEM and Engr-in-Charge.
Supply and fixing MBO UPS (700) complete as per OEM recommendation and Engr-in-Charge
Supply and fixing in replacement of Mother board MCU PCB all as specified and as directed.
Supply and fixing Cabin Mirror of existing size complete all as per OEM recommendation and as per directions of Engr-in-Charge
Supply and fixing over speed governor (OSG) unit complete with accessories complete and as per OEM recommendation and Engr-in-Charge
Supply and fixing over speed governor (OSG) Rope complete all as per OEM recommendation and Engr-in-Charge
Supply and fixing Main Sheave as per existing at site and as per OEM recommendation and Engr-in-Charge
M&L for Load Testing of lift to check the capacity and performance of lift as per existing specifications complete all as per OEM recommendation. Note : The certified weight blocks shall be provided by the contractor.Certificate shall be submitted after completion of testing.
Supply and fixing in replacement of ARD batteries of SMF type, 12 V, 18 AH, having capacity to minimum backup for 2 miniute and suitable for existing inverter supply to 3 Phase, 400Volt, sinusoidal power to the existing system control, all as specified and as directed . Note for item No. 13 to 22:- The items will be inspected by rep of AO/ IEM before execution of the same.
M&L for cleaning of lift cabin room,doors,sills and machine room (17 Nos of lift) complete all as directed by Engineer in charge. Note:- (1) Cleaning materials such as cotton waste, good quality stainless steel cleaners and polish ,cloths wipes,brush shall be provided by the contractor. The rate for the same shall be deemed to be included in the quoted rate. If the contractor fail to execute the same on time,a penalty of Rs. 2000/- per lift shall be deducted . (2) Cleaning of 17 Nos of lifts and machine rooms shall be considered as one job per month
AISWARYA ENTERPRISES
PREMIER ENGINEERING SYSTEMS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .