Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAccepted-Finance | ₹6.3 L | L1 | Accepted-Finance L1 BIDDER |
| 2 | L2₹6.7 L+₹43,294.12 (6.87%)Accepted-Finance | ₹6.7 L+₹43,294.12 (6.87%) | L2 | Accepted-Finance L2 BIDDER |
| 3 | L3₹7.0 L+₹74,183.88 (11.8%)Accepted-Finance PANAKALAHATTU VEEDU ECHAPPUKUZHI KUDAPPANAKKUNNU P O | KERALA | ₹7.0 L+₹74,183.88 (11.8%) | L3 | Accepted-Finance L3 BIDDER |
| 4 | L4₹7.1 L+₹78,930.05 (12.5%)Accepted-Finance | ₹7.1 L+₹78,930.05 (12.5%) | L4 | Accepted-Finance L4 BIDDER |
| 5 | L5₹7.1 L+₹81,312.88 (12.9%)Accepted-Finance THEKKEDESAM POST 678553 | PALAKKAD | KERALA | 678553 | ₹7.1 L+₹81,312.88 (12.9%) | L5 | Accepted-Finance L5 BIDDER |
| Sl No | Description | Qty | Unit | manoj.k L1 | RADHAKRISHNAN. K L5 | Rahulan C L6 | BIJU. K L4 | GREENHAVEN CONSTRUCTIONS and PROJECTPVT LTD L3 | SURESH M L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00CANAL | |||||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 200 | sqm | 14 ₹2,800 Lowest | 16.26 ₹3,252 | 16.44 ₹3,288 | 16.21 ₹3,242 | 16.04 ₹3,208 | 15.41 ₹3,082 |
| 1.00 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 4.88 | cum | 950.64 ₹4,634.37 | 950.72 ₹4,634.76 | 961.35 ₹4,686.58 | 947.53 ₹4,619.21 Lowest | 1,060.01 ₹5,167.55 | 1,569.49 ₹7,651.26 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 26.54 | cum | 204 ₹5,414.16 Lowest | 230.32 ₹6,112.69 | 232.9 ₹6,181.17 | 229.55 ₹6,092.26 | 228 ₹6,051.12 | 218.21 ₹5,791.29 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 19.68 | cum | 6,284 ₹1,23,700.54 Lowest | 7,092 ₹1,39,606.02 | 7,171.33 ₹1,41,167.63 | 7,068.2 ₹1,39,137.52 | 7,023.04 ₹1,38,248.54 | 6,719.16 ₹1,32,266.66 |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 14.32 | cum | 6,609.71 ₹94,684.1 Lowest | 7,459.08 ₹1,06,851.32 | 7,542.51 ₹1,08,046.46 | 7,434.05 ₹1,06,492.77 | 7,386.54 ₹1,05,812.19 | 7,066.94 ₹1,01,233.92 |
| 1.01 | 60.7.9:RR with Departmental. Stone - Random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand). | 3.9 | cum | 4,357 ₹16,992.3 Lowest | 5,519.72 ₹21,526.91 | 5,581.46 ₹21,767.69 | 5,501.19 ₹21,454.64 | 5,466.18 ₹21,318.1 | 5,229.57 ₹20,395.32 |
| 1.01 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 93.6 | sqm | 665 ₹62,244 Lowest | 750.6 ₹70,256.16 | 759 ₹71,042.4 | 748.08 ₹70,020.29 | 740.78 ₹69,337.01 | 710 ₹66,456 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 34.61 | cum | 7,316 ₹2,53,192.13 Lowest | 8,256.96 ₹2,85,756.87 | 8,349.32 ₹2,88,953.27 | 8,229.25 ₹2,84,797.88 | 8,175.93 ₹2,82,952.59 | 7,822 ₹2,70,703.78 |
| 1.01 | 5.22.4:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHot rolled deformed bars | 593 | kilogram | 89 ₹52,777.36 Lowest | 100.51 ₹59,602.83 | 101.64 ₹60,272.93 | 100.18 ₹59,407.14 | 99.52 ₹59,015.76 | 95.23 ₹56,471.77 |
Tender Value
₹8.0 L
EMD Value
₹19,898
Closing Date
15 Jul 2026, 5:00 pmClosed
Assistant Executive Engineer
O/o Assistant Executive Engineer Irrigation Sub Division NO.I Chittur , Pin-678104
GENERAL-GPS II-Modernization of Canals- 2025-26-Nemmara LAC-Kizhakkethara Branch Canal-Rectification b/w Ch 1/480km and 1/580 km -General Civil Work
2026_Irrig_859346_1
IRR/PI/TR/4753/2025_5_3_2/1
Open Tender
Civil Works - Canal
Item Rate
360 days
Chittur
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,755
₹19,898
28 Jul 2026
6 Jul 2026
17 Jul 2026
6 Jul 2026
15 Jul 2026
6 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CANAL | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.002 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | - | cum | - | - |
| 1.003 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1 | cum | - | - |
| 1.004 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.005 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 1 | cum | - | - |
| 1.006 | 60.7.9:RR with Departmental. Stone - Random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand). | - | cum | - | - |
| 1.007 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 1 | sqm | - | - |
| 1.008 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.009 | 5.22.4:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHot rolled deformed bars | 0.6 | kilogram | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_1452979.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
affidavit.pdf
Other Document • 0.35 MB
Prli-Agt.pdf
Tender Documents • 0.25 MB
epayment.pdf
Tender Documents • 0.01 MB
formoftender.pdf
Other Document • 0.18 MB
integritypact1.pdf
Other Document • 0.05 MB
viewsbd.pdf
Other Document • 2.30 MB
BOQ_1452979.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .