Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
2 Feb 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer ED-Rajouri
Executive Engineer ED-Rajouri
EDR/87 of 2025-26 dated 22-01-2026
2026_PDD_301207_1
EDR/87 OF 2025-26 DATED 22-01-2026
Open Tender
Electrical Works
Turn-key
60 days
Rajouri
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
Executive Engineer ED-Rajouri
₹1.7 L
14 Mar 2026
22 Jan 2026
3 Feb 2026
22 Jan 2026
2 Feb 2026
22 Jan 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: EXECUTIVE ENGINEER, ELECTRIC DIVISION, JPDCL, RAJOURI
Name of Work: 1.Creation of 63KVA S/stn along with HT/LT network at Pai Mohalla W No 6 Bagnoti. 2. Creation of 63KVA S/stn along with HT/LT network at W No 4 Narrian. 3.Creation of 63KVA S/stn along with HT/LT network at W No 7 Camp Mohalla Bagnoti. 4.Creation of 63KVA S/stn HT network at Katera W no 1 Dabbar Potha B. 5.Creation of 25KVA S/stn along with HT/LT network at Baba Kalla Devsthan W No 1 hanjana Thakra. 6. Creation of 63KVA S/stn along with HT/LT network at Amb Khori. 7. Creation of 63KVA S/stn along with HT/LT network at Meenka Dhariala. 8. Creation of 63KVA S/stn along with HT/LT network at Lower Kangri. 9. Creation of 63KVA S/stn along with HT/LT network at Parran Bagla. 10. Creation of 63KVA S/stn along with HT/LT network at Lower Doogani. (All the items should be as per latest specifications and drawing adopted/Approved by Department)
e-NIT No: EDR/ 87 of 2025-26 Dated 22-01-2026
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description * Bidders are requested to quote the rates for all items which must be inclusive of Supply, Erection, Testing and commissioning of all items including Taxes, Labour charges, Overhead Charges etc. ** Before quoting the rates bidders are requested to visit the site *** Material should be in accordance to latest IS and IEC Standards Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes in Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
2 1.Creation of 63KVA S/stn along with HT/LT network at Pai Mohalla W No 6 Bagnoti. 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
3 SITC OF HT Line 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
4 S.T Pole 8 mtrs long (410-SP15) No Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
5 Galvanisied Channel cross-arm including clamps and braces. item5 KG Excess(+) Full Conversion INR INR Sixty Thousand &Fourteen and Paise Fifty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
6 30 mm2 ACSR Weasel Conductor item6 Kms Excess(+) Full Conversion INR INR One Lakh Five Thousand Five Hundred & Eighty Eight and Paise Seventy Eight Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
7 11 kv Pin insulators with pins (10KN) item7 No Excess(+) Full Conversion INR INR Eleven Thousand Six Hundred & Twenty Eight and Paise Twelve Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
8 11 kv Disc insulators with fittings (45 KN) item8 No Excess(+) Full Conversion INR INR Three Thousand Nine Hundred & Eighty Three and Paise Four Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
9 GI Stay sets complete with 50*8mm stay clamp ,guy insulator(2 nos.),anchor plate(200*200*6mm),nut-bolts,turn -buckles(2 nos.),1.8m long,16mm diameter solid GS stay rod and 7/3.15 mm dia GI stranded wire complete. item9 No Excess(+) Full Conversion INR INR Eighteen Thousand Seven Hundred & Two and Paise Eighty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
10 Al. Painting item10 ltrs. Excess(+) Full Conversion INR INR Seven Thousand Two Hundred & Ten Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
11 Red Oxide item11 ltrs. Excess(+) Full Conversion INR INR Four Thousand Three Hundred & Fifty Four Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
12 Galvansied Nuts and Bolts of sorts item12 Kg Excess(+) Full Conversion INR INR Two Thousand Five Hundred & Thirty Two and Paise Seventy Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
13 SITC OF SUB STATION 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
14 63KVA Transformer Level II , 11/0.433KV,3-Phase Distribution Transformer with Bimetallic Terminal Connectors ,Aluminium Wound and with LV Cable Box having detachable Aluminium Gland plate. No Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
15 S.T Pole 8 mtrs long (410-SP15) item15 No Excess(+) Full Conversion INR INR Twenty Eight Thousand Four Hundred & Eighty Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
16 Surge Arrester Station Type 9KV, 10 kA (Polymer Type) item16 Set Excess(+) Full Conversion INR INR Seven Thousand Five Hundred & Seventy Two and Paise Fifty Nine Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
17 11 KV Horn Gap Set, 3 Phase, 200 Amp item17 Set Excess(+) Full Conversion INR INR Seven Thousand One Hundred & Eighty Eight and Paise Fourteen Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
18 11 KV Link Set item18 Set Excess(+) Full Conversion INR INR Ten Thousand Six Hundred & One and Paise Sixty Three Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
19 PVC insulated stranded conductor FRLS type 1.1kv Grade Cable 120mm sq with Thimbles item19 Mtr Excess(+) Full Conversion INR INR Twenty Five Thousand Six Hundred & Eighty Eight and Paise Forty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
20 Channel/Flate/Angle in shape of fabricated X-arms, Top bracket, Angle braces, clamps etc. item20 Kg Excess(+) Full Conversion INR INR Thirty Nine Thousand Six Hundred & Eighty Two and Paise Fifty Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
21 GI Stay sets complete with 50*8mm stay clamp ,guy insulator(2 nos.),anchor plate(200*200*6mm),nut-bolts,turn -buckles(2 nos.),1.8m long,16mm diameter solid GS stay rod and 7/3.15 mm dia GI stranded wire complete. item21 No Excess(+) Full Conversion INR INR Six Thousand Two Hundred & Thirty Four and Paise Twenty Eight Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
22 11 kv Pin insulators with pins (10KN) item22 No Excess(+) Full Conversion INR INR Seven Hundred & Sixty Eight and Paise Ninety Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
23 11 kv Disc insulators with fittings (45 KN) item23 No Excess(+) Full Conversion INR INR One Thousand Eight Hundred & Forty Three and Paise Sixty Two Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
24 Nuts and Bolts of sorts item24 Kg Excess(+) Full Conversion INR INR Two Thousand &Nine and Paise Sixty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
25 Earthing of Sub-station ,excavation of earth pit of dia 650mm and depth 3000mm,installation of earthing pipe of 40mm nominal bore and 4mm wall thickness and length 2.5 mtr.long as per IS 1239.GI strip for neutrl earthing of size 25 mm*3 mm for connection of transformer body ,G.O set and lightening arrestor as per IS 2629/85,GI nuts and bolts ,refilled with earth enhancement materials and earth chamber made of brick masonary with RCC slab cover. (Specification as per cost data) item25 No Excess(+) Full Conversion INR INR Nine Thousand Nine Hundred & Ninety One and Paise Forty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
26 Al. Painting item26 ltrs. Excess(+) Full Conversion INR INR One Thousand &Thirty Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
27 Red Oxide item27 ltrs. Excess(+) Full Conversion INR INR Six Hundred & Twenty Two Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
28 Sundry Items/POL item28 LS Excess(+) Full Conversion INR INR Nine Hundred & Thirty Three and Paise Forty Seven Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
29 SITC OF LT Line 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
30 S.T Pole 8 mtrs long (410-SP15) No Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
31 30 mm2 ACSR Weasel Conductor item31 Kms Excess(+) Full Conversion INR INR Twenty Three Thousand Nine Hundred & Ninety Seven and Paise Forty Five Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
32 Shakle Insulator (16KN) item32 Nos Excess(+) Full Conversion INR INR Nine Hundred & Eighty Seven and Paise Seventy Two Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
33 Mukky Clamps item33 Nos. Excess(+) Full Conversion INR INR Two Thousand One Hundred & Fifty Three and Paise Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
34 Red Oxide item34 ltrs. Excess(+) Full Conversion INR INR Nine Hundred & Thirty Three Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
35 Al. Painting item35 ltrs. Excess(+) Full Conversion INR INR One Thousand Five Hundred & Forty Five Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
36 Nuts and Bolts of sorts item36 Kgs Excess(+) Full Conversion INR INR Five Hundred & Sixty Seven and Paise Ninety Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
37 2.Creation of 63KVA S/stn along with HT/LT network at W No 4 Narrian. 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
38 SITC OF HT Line 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
39 S.T Pole 8 mtrs long (410-SP15) No Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
40 Galvanisied Channel cross-arm including clamps and braces. item40 KG Excess(+) Full Conversion INR INR Sixty Eight Thousand Five Hundred & Eighty Eight Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
41 30 mm2 ACSR Weasel Conductor item41 Kms Excess(+) Full Conversion INR INR One Lakh Nineteen Thousand Nine Hundred & Eighty Seven and Paise Twenty Five Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
42 11 kv Pin insulators with pins (10KN) item42 No Excess(+) Full Conversion INR INR Thirteen Thousand Two Hundred & Eighty Nine and Paise Twenty Eight Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
43 11 kv Disc insulators with fittings (45 KN) item43 No Excess(+) Full Conversion INR INR Five Thousand Nine Hundred & Seventy Four and Paise Fifty Six Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
44 GI Stay sets complete with 50*8mm stay clamp ,guy insulator(2 nos.),anchor plate(200*200*6mm),nut-bolts,turn -buckles(2 nos.),1.8m long,16mm diameter solid GS stay rod and 7/3.15 mm dia GI stranded wire complete. item44 No Excess(+) Full Conversion INR INR Twelve Thousand Four Hundred & Sixty Eight and Paise Fifty Six Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
45 Al. Painting item45 ltrs. Excess(+) Full Conversion INR INR Eight Thousand Two Hundred & Forty Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
46 Red Oxide item46 ltrs. Excess(+) Full Conversion INR INR Four Thousand Nine Hundred & Seventy Six Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
47 Galvansied Nuts and Bolts of sorts item47 Kg Excess(+) Full Conversion INR INR Two Thousand Eight Hundred & Ninety Four and Paise Fifty Six Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
48 SITC OF SUB STATION 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
49 63KVA Transformer Level II , 11/0.433KV,3-Phase Distribution Transformer with Bimetallic Terminal Connectors ,Aluminium Wound and with LV Cable Box having detachable Aluminium Gland plate. item49 No Excess(+) Full Conversion INR INR One Lakh Ninety Five Thousand &Twenty Three and Paise Thirty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
50 S.T Pole 8 mtrs long (410-SP15) No Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
51 Surge Arrester Station Type 9KV, 10 kA (Polymer Type) item51 Set Excess(+) Full Conversion INR INR Seven Thousand Five Hundred & Seventy Two and Paise Fifty Nine Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
52 11 KV Horn Gap Set, 3 Phase, 200 Amp item52 Set Excess(+) Full Conversion INR INR Seven Thousand One Hundred & Eighty Eight and Paise Fourteen Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
53 11 KV Link Set item53 Set Excess(+) Full Conversion INR INR Ten Thousand Six Hundred & One and Paise Sixty Three Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
54 Channel/Flate/Angle in shape of fabricated X-arms, Top bracket, Angle braces, clamps etc. item54 Kg Excess(+) Full Conversion INR INR Thirty Nine Thousand Six Hundred & Eighty Two and Paise Fifty Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
55 GI Stay sets complete with 50*8mm stay clamp ,guy insulator(2 nos.),anchor plate(200*200*6mm),nut-bolts,turn -buckles(2 nos.),1.8m long,16mm diameter solid GS stay rod and 7/3.15 mm dia GI stranded wire complete. item55 No Excess(+) Full Conversion INR INR Six Thousand Two Hundred & Thirty Four and Paise Twenty Eight Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
56 PVC insulated stranded conductor FRLS type 1.1kv Grade Cable 120mm sq with Thimbles item56 Mtr Excess(+) Full Conversion INR INR Twenty Five Thousand Six Hundred & Eighty Eight and Paise Forty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
57 11 kv Pin insulators with pins (10KN) item57 No Excess(+) Full Conversion INR INR Seven Hundred & Sixty Eight and Paise Ninety Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
58 11 kv Disc insulators with fittings (45 KN) item58 No Excess(+) Full Conversion INR INR One Thousand Eight Hundred & Forty Three and Paise Sixty Two Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
59 Nuts and Bolts of sorts item59 Kg Excess(+) Full Conversion INR INR Two Thousand &Nine and Paise Sixty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
60 Earthing of Sub-station ,excavation of earth pit of dia 650mm and depth 3000mm,installation of earthing pipe of 40mm nominal bore and 4mm wall thickness and length 2.5 mtr.long as per IS 1239.GI strip for neutrl earthing of size 25 mm*3 mm for connection of transformer body ,G.O set and lightening arrestor as per IS 2629/85,GI nuts and bolts ,refilled with earth enhancement materials and earth chamber made of brick masonary with RCC slab cover. (Specification as per cost data) item60 No Excess(+) Full Conversion INR INR Nine Thousand Nine Hundred & Ninety One and Paise Forty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
61 Al. Painting item61 ltrs. Excess(+) Full Conversion INR INR One Thousand &Thirty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
62 Red Oxide item62 ltrs. Excess(+) Full Conversion INR INR Six Hundred & Twenty Two Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
63 Sundry Items/POL item63 LS Excess(+) Full Conversion INR INR Nine Hundred & Thirty Three and Paise Forty Seven Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
64 SITC OF LT Line 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
65 S.T Pole 8 mtrs long (410-SP15) No Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
66 30 mm2 ACSR Weasel Conductor item66 Kms Excess(+) Full Conversion INR INR Twenty Eight Thousand Seven Hundred & Ninety Six and Paise Ninety Four Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
67 Shakle Insulator (16KN) item67 Nos Excess(+) Full Conversion INR INR One Thousand Three Hundred & Sixteen and Paise Ninety Six Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
68 Mukky Clamps item68 Nos. Excess(+) Full Conversion INR INR Two Thousand Eight Hundred & Seventy and Paise Seventy Two Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
69 Al. Painting item69 ltrs. Excess(+) Full Conversion INR INR Two Thousand &Sixty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
70 Red Oxide item70 ltrs. Excess(+) Full Conversion INR INR One Thousand Two Hundred & Forty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
71 Nuts and Bolts of sorts item71 Kgs Excess(+) Full Conversion INR INR Seven Hundred & Fifty Seven and Paise Twenty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
72 3. Creation of 63KVA S/stn along with HT/LT network at W No 7 Camp Mohalla Bagnoti. 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
73 SITC OF HT Line 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
74 S.T Pole 8 mtrs long (410-SP15) No Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
75 Galvanisied Channel cross-arm including clamps and braces. item75 KG Excess(+) Full Conversion INR INR Eight Thousand Five Hundred & Seventy Three and Paise Fifty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
76 30 mm2 ACSR Weasel Conductor item76 Kms Excess(+) Full Conversion INR INR Nineteen Thousand One Hundred & Ninety Seven and Paise Ninety Six Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
77 11 kv Pin insulators with pins (10KN) item77 No Excess(+) Full Conversion INR INR One Thousand Six Hundred & Sixty One and Paise Sixteen Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
78 11 kv Disc insulators with fittings (45 KN) item78 No Excess(+) Full Conversion INR INR One Thousand Nine Hundred & Ninety One and Paise Fifty Two Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
79 GI Stay sets complete with 50*8mm stay clamp ,guy insulator(2 nos.),anchor plate(200*200*6mm),nut-bolts,turn -buckles(2 nos.),1.8m long,16mm diameter solid GS stay rod and 7/3.15 mm dia GI stranded wire complete. item79 No Excess(+) Full Conversion INR INR Six Thousand Two Hundred & Thirty Four and Paise Twenty Eight Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
80 Al. Painting item80 ltrs. Excess(+) Full Conversion INR INR One Thousand &Thirty Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
81 Red Oxide item81 ltrs. Excess(+) Full Conversion INR INR Six Hundred & Twenty Two Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
82 Galvansied Nuts and Bolts of sorts item82 Kg Excess(+) Full Conversion INR INR Three Hundred & Sixty One and Paise Eighty Two Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
83 SITC OF SUB STATION 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
84 63KVA Transformer Level II , 11/0.433KV,3-Phase Distribution Transformer with Bimetallic Terminal Connectors ,Aluminium Wound and with LV Cable Box having detachable Aluminium Gland plate. No Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
85 S.T Pole 8 mtrs long (410-SP15) item85 No Excess(+) Full Conversion INR INR Twenty Eight Thousand Four Hundred & Eighty Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
86 Surge Arrester Station Type 9KV, 10 kA (Polymer Type) item86 Set Excess(+) Full Conversion INR INR Seven Thousand Five Hundred & Seventy Two and Paise Fifty Nine Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
87 11 KV Horn Gap Set, 3 Phase, 200 Amp item87 Set Excess(+) Full Conversion INR INR Seven Thousand One Hundred & Eighty Eight and Paise Fourteen Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
88 11 KV Link Set item88 Set Excess(+) Full Conversion INR INR Ten Thousand Six Hundred & One and Paise Sixty Three Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
89 Channel/Flate/Angle in shape of fabricated X-arms, Top bracket, Angle braces, clamps etc. item89 Kg Excess(+) Full Conversion INR INR Thirty Nine Thousand Six Hundred & Eighty Two and Paise Fifty Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
90 GI Stay sets complete with 50*8mm stay clamp ,guy insulator(2 nos.),anchor plate(200*200*6mm),nut-bolts,turn -buckles(2 nos.),1.8m long,16mm diameter solid GS stay rod and 7/3.15 mm dia GI stranded wire complete. item90 No Excess(+) Full Conversion INR INR Six Thousand Two Hundred & Thirty Four and Paise Twenty Eight Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
91 PVC insulated stranded conductor FRLS type 1.1kv Grade Cable 120mm sq with Thimbles item91 Mtr Excess(+) Full Conversion INR INR Twenty Five Thousand Six Hundred & Eighty Eight and Paise Forty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
92 11 kv Pin insulators with pins (10KN) item92 No Excess(+) Full Conversion INR INR Seven Hundred & Sixty Eight and Paise Ninety Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
93 11 kv Disc insulators with fittings (45 KN) item93 No Excess(+) Full Conversion INR INR One Thousand Eight Hundred & Forty Three and Paise Sixty Two Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
94 Nuts and Bolts of sorts item94 Kg Excess(+) Full Conversion INR INR Two Thousand &Nine and Paise Sixty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
95 Earthing of Sub-station ,excavation of earth pit of dia 650mm and depth 3000mm,installation of earthing pipe of 40mm nominal bore and 4mm wall thickness and length 2.5 mtr.long as per IS 1239.GI strip for neutrl earthing of size 25 mm*3 mm for connection of transformer body ,G.O set and lightening arrestor as per IS 2629/85,GI nuts and bolts ,refilled with earth enhancement materials and earth chamber made of brick masonary with RCC slab cover. (Specification as per cost data) item95 No Excess(+) Full Conversion INR INR Nine Thousand Nine Hundred & Ninety One and Paise Forty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
96 Al. Painting item96 ltrs. Excess(+) Full Conversion INR INR One Thousand &Thirty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
97 Red Oxide item97 ltrs. Excess(+) Full Conversion INR INR Six Hundred & Twenty Two Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
98 Sundry Items/POL item98 LS Excess(+) Full Conversion INR INR Nine Hundred & Thirty Three and Paise Forty Seven Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
99 SITC OF LT Line 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
100 S.T Pole 8 mtrs long (410-SP15) No Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
101 30 mm2 ACSR Weasel Conductor item101 Kms Excess(+) Full Conversion INR INR Twenty Eight Thousand Seven Hundred & Ninety Six and Paise Ninety Four Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
102 Shakle Insulator (16KN) item102 Nos Excess(+) Full Conversion INR INR One Thousand Three Hundred & Sixteen and Paise Ninety Six Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
103 Mukky Clamps item103 Nos. Excess(+) Full Conversion INR INR Two Thousand Eight Hundred & Seventy and Paise Seventy Two Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
104 Al. Painting item104 ltrs. Excess(+) Full Conversion INR INR Two Thousand &Sixty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
105 Red Oxide item105 ltrs. Excess(+) Full Conversion INR INR One Thousand Two Hundred & Forty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
106 Nuts and Bolts of sorts item106 Kgs Excess(+) Full Conversion INR INR Seven Hundred & Fifty Seven and Paise Twenty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
107 4. Creation of 63KVA S/stn HT network at Katera W no 1 Dabbar Potha B. 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
108 SITC OF HT Line 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
109 S.T Pole 8 mtrs long (410-SP15) No Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
110 Galvanisied Channel cross-arm including clamps and braces. item110 KG Excess(+) Full Conversion INR INR Fifty One Thousand Four Hundred & Forty One Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
111 30 mm2 ACSR Weasel Conductor item111 Kms Excess(+) Full Conversion INR INR Ninety One Thousand One Hundred & Ninety and Paise Thirty One Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
112 11 kv Pin insulators with pins (10KN) item112 No Excess(+) Full Conversion INR INR Nine Thousand Nine Hundred & Sixty Six and Paise Ninety Six Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
113 11 kv Disc insulators with fittings (45 KN) item113 No Excess(+) Full Conversion INR INR Three Thousand Nine Hundred & Eighty Three and Paise Four Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
114 GI Stay sets complete with 50*8mm stay clamp ,guy insulator(2 nos.),anchor plate(200*200*6mm),nut-bolts,turn -buckles(2 nos.),1.8m long,16mm diameter solid GS stay rod and 7/3.15 mm dia GI stranded wire complete. item114 No Excess(+) Full Conversion INR INR Twelve Thousand Four Hundred & Sixty Eight and Paise Fifty Six Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
115 Al. Painting item115 ltrs. Excess(+) Full Conversion INR INR Six Thousand One Hundred & Eighty Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
116 Red Oxide item116 ltrs. Excess(+) Full Conversion INR INR Three Thousand Seven Hundred & Thirty Two Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
117 Galvansied Nuts and Bolts of sorts item117 Kg Excess(+) Full Conversion INR INR Two Thousand One Hundred & Seventy and Paise Ninety Two Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
118 SITC OF SUB STATION 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
119 63KVA Transformer Level II , 11/0.433KV,3-Phase Distribution Transformer with Bimetallic Terminal Connectors ,Aluminium Wound and with LV Cable Box having detachable Aluminium Gland plate. No Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
120 S.T Pole 8 mtrs long (410-SP15) item120 No Excess(+) Full Conversion INR INR Twenty Eight Thousand Four Hundred & Eighty Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
121 Surge Arrester Station Type 9KV, 10 kA (Polymer Type) item121 Set Excess(+) Full Conversion INR INR Seven Thousand Five Hundred & Seventy Two and Paise Fifty Nine Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
122 11 KV Horn Gap Set, 3 Phase, 200 Amp item122 Set Excess(+) Full Conversion INR INR Seven Thousand One Hundred & Eighty Eight and Paise Fourteen Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
123 11 KV Link Set item123 Set Excess(+) Full Conversion INR INR Ten Thousand Six Hundred & One and Paise Sixty Three Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
124 Channel/Flate/Angle in shape of fabricated X-arms, Top bracket, Angle braces, clamps etc. item124 Kg Excess(+) Full Conversion INR INR Thirty Nine Thousand Six Hundred & Eighty Two and Paise Fifty Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
125 GI Stay sets complete with 50*8mm stay clamp ,guy insulator(2 nos.),anchor plate(200*200*6mm),nut-bolts,turn -buckles(2 nos.),1.8m long,16mm diameter solid GS stay rod and 7/3.15 mm dia GI stranded wire complete. item125 No Excess(+) Full Conversion INR INR Six Thousand Two Hundred & Thirty Four and Paise Twenty Eight Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
126 PVC insulated stranded conductor FRLS type 1.1kv Grade Cable 120mm sq with Thimbles item126 Mtr Excess(+) Full Conversion INR INR Twenty Five Thousand Six Hundred & Eighty Eight and Paise Forty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
127 11 kv Pin insulators with pins (10KN) item127 No Excess(+) Full Conversion INR INR Seven Hundred & Sixty Eight and Paise Ninety Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
128 11 kv Disc insulators with fittings (45 KN) item128 No Excess(+) Full Conversion INR INR One Thousand Eight Hundred & Forty Three and Paise Sixty Two Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
129 Nuts and Bolts of sorts item129 Kg Excess(+) Full Conversion INR INR Two Thousand &Nine and Paise Sixty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
130 Earthing of Sub-station ,excavation of earth pit of dia 650mm and depth 3000mm,installation of earthing pipe of 40mm nominal bore and 4mm wall thickness and length 2.5 mtr.long as per IS 1239.GI strip for neutrl earthing of size 25 mm*3 mm for connection of transformer body ,G.O set and lightening arrestor as per IS 2629/85,GI nuts and bolts ,refilled with earth enhancement materials and earth chamber made of brick masonary with RCC slab cover. (Specification as per cost data) item130 No Excess(+) Full Conversion INR INR Nine Thousand Nine Hundred & Ninety One and Paise Forty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
131 Al. Painting item131 ltrs. Excess(+) Full Conversion INR INR One Thousand &Thirty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
132 Red Oxide item132 ltrs. Excess(+) Full Conversion INR INR Six Hundred & Twenty Two Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
133 Sundry Items/POL item133 LS Excess(+) Full Conversion INR INR Nine Hundred & Thirty Three and Paise Forty Seven Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
134 SITC OF LT Line 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
135 S.T Pole 8 mtrs long (410-SP15) No Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
136 30 mm2 ACSR Weasel Conductor item136 Kms Excess(+) Full Conversion INR INR Twenty Eight Thousand Seven Hundred & Ninety Six and Paise Ninety Four Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
137 Shakle Insulator (16KN) item137 Nos Excess(+) Full Conversion INR INR One Thousand Three Hundred & Sixteen and Paise Ninety Six Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
138 Mukky Clamps item138 Nos. Excess(+) Full Conversion INR INR Two Thousand Eight Hundred & Seventy and Paise Seventy Two Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
139 Al. Painting item139 ltrs. Excess(+) Full Conversion INR INR Two Thousand &Sixty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
140 Red Oxide item140 ltrs. Excess(+) Full Conversion INR INR One Thousand Two Hundred & Forty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
141 Nuts and Bolts of sorts item141 Kgs Excess(+) Full Conversion INR INR Seven Hundred & Fifty Seven and Paise Twenty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
142 5. Creation of 25KVA S/stn along with HT/LT network at Baba Kalla Devsthan W No 1 hanjana Thakra. 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
143 SITC OF HT Line 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
144 S.T Pole 8 mtrs long (410-SP15) No Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
145 Galvanisied Channel cross-arm including clamps and braces. item145 KG Excess(+) Full Conversion INR INR Thirty Four Thousand Two Hundred & Ninety Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
146 30 mm2 ACSR Weasel Conductor item146 Kms Excess(+) Full Conversion INR INR Fifty Seven Thousand Five Hundred & Ninety Three and Paise Eighty Eight Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
147 11 kv Pin insulators with pins (10KN) item147 No Excess(+) Full Conversion INR INR Six Thousand Six Hundred & Forty Four and Paise Sixty Four Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
148 11 kv Disc insulators with fittings (45 KN) item148 No Excess(+) Full Conversion INR INR Three Thousand Nine Hundred & Eighty Three and Paise Four Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
149 GI Stay sets complete with 50*8mm stay clamp ,guy insulator(2 nos.),anchor plate(200*200*6mm),nut-bolts,turn -buckles(2 nos.),1.8m long,16mm diameter solid GS stay rod and 7/3.15 mm dia GI stranded wire complete. item149 No Excess(+) Full Conversion INR INR Twelve Thousand Four Hundred & Sixty Eight and Paise Fifty Six Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
150 Al. Painting item150 ltrs. Excess(+) Full Conversion INR INR Four Thousand One Hundred & Twenty Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
151 Red Oxide item151 ltrs. Excess(+) Full Conversion INR INR Two Thousand Four Hundred & Eighty Eight Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
152 Galvansied Nuts and Bolts of sorts item152 Kg Excess(+) Full Conversion INR INR One Thousand Four Hundred & Forty Seven and Paise Twenty Eight Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
153 SITC OF SUB STATION 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
154 25KVA Transformer Level II , 11/0.433KV,3-Phase Distribution Transformer with Bimetallic Terminal Connectors ,Aluminium Wound and with LV Cable Box having detachable Aluminium Gland plate. No Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
155 S.T Pole 8 mtrs long (410-SP15) item155 No Excess(+) Full Conversion INR INR Twenty Eight Thousand Four Hundred & Eighty Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
156 Surge Arrester Station Type 9KV, 10 kA (Polymer Type) item156 Set Excess(+) Full Conversion INR INR Seven Thousand Five Hundred & Seventy Two and Paise Fifty Nine Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
157 11 KV Horn Gap Set, 3 Phase, 200 Amp item157 Set Excess(+) Full Conversion INR INR Seven Thousand One Hundred & Eighty Eight and Paise Fourteen Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
158 11 KV Link Set item158 Set Excess(+) Full Conversion INR INR Ten Thousand Six Hundred & One and Paise Sixty Three Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
159 Channel/Flate/Angle in shape of fabricated X-arms, Top bracket, Angle braces, clamps etc. item159 Kg Excess(+) Full Conversion INR INR Thirty Nine Thousand Six Hundred & Eighty Two and Paise Fifty Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
160 GI Stay sets complete with 50*8mm stay clamp ,guy insulator(2 nos.),anchor plate(200*200*6mm),nut-bolts,turn -buckles(2 nos.),1.8m long,16mm diameter solid GS stay rod and 7/3.15 mm dia GI stranded wire complete. item160 No Excess(+) Full Conversion INR INR Six Thousand Two Hundred & Thirty Four and Paise Twenty Eight Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
161 PVC insulated stranded conductor FRLS type 1.1kv Grade Cable 120mm sq with Thimbles item161 Mtr Excess(+) Full Conversion INR INR Twenty Five Thousand Six Hundred & Eighty Eight and Paise Forty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
162 11 kv Pin insulators with pins (10KN) item162 No Excess(+) Full Conversion INR INR Seven Hundred & Sixty Eight and Paise Ninety Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
163 11 kv Disc insulators with fittings (45 KN) item163 No Excess(+) Full Conversion INR INR One Thousand Eight Hundred & Forty Three and Paise Sixty Two Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
164 Nuts and Bolts of sorts item164 Kg Excess(+) Full Conversion INR INR Two Thousand &Nine and Paise Sixty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
165 Earthing of Sub-station ,excavation of earth pit of dia 650mm and depth 3000mm,installation of earthing pipe of 40mm nominal bore and 4mm wall thickness and length 2.5 mtr.long as per IS 1239.GI strip for neutrl earthing of size 25 mm*3 mm for connection of transformer body ,G.O set and lightening arrestor as per IS 2629/85,GI nuts and bolts ,refilled with earth enhancement materials and earth chamber made of brick masonary with RCC slab cover. (Specification as per cost data) item165 No Excess(+) Full Conversion INR INR Nine Thousand Nine Hundred & Ninety One and Paise Forty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
166 Al. Painting item166 ltrs. Excess(+) Full Conversion INR INR One Thousand &Thirty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
167 Red Oxide item167 ltrs. Excess(+) Full Conversion INR INR Six Hundred & Twenty Two Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
168 Sundry Items/POL item168 LS Excess(+) Full Conversion INR INR Nine Hundred & Thirty Three and Paise Forty Seven Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
169 SITC OF LT Line 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
170 S.T Pole 8 mtrs long (410-SP15) No Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
171 30 mm2 ACSR Weasel Conductor item171 Kms Excess(+) Full Conversion INR INR Twenty Three Thousand Nine Hundred & Ninety Seven and Paise Forty Five Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
172 Shakle Insulator (16KN) item172 Nos Excess(+) Full Conversion INR INR Nine Hundred & Eighty Seven and Paise Seventy Two Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
173 Mukky Clamps item173 Nos. Excess(+) Full Conversion INR INR Two Thousand One Hundred & Fifty Three and Paise Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
174 Al. Painting item174 ltrs. Excess(+) Full Conversion INR INR One Thousand Five Hundred & Forty Five Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
175 Red Oxide item175 ltrs. Excess(+) Full Conversion INR INR Nine Hundred & Thirty Three Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
176 Nuts and Bolts of sorts item176 Kgs Excess(+) Full Conversion INR INR Five Hundred & Sixty Seven and Paise Ninety Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
177 6. Creation of 63KVA S/stn alongwith HT/LT network at Amb Khori. 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
178 SITC OF HT Line 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
179 S.T Pole 8 mtrs long (410-SP15) No Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
180 Galvanisied Channel cross-arm including clamps and braces. item180 KG Excess(+) Full Conversion INR INR Eighty Five Thousand Seven Hundred & Thirty Five Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
181 30 mm2 ACSR Weasel Conductor item181 Kms Excess(+) Full Conversion INR INR One Lakh Forty Eight Thousand Seven Hundred & Eighty Four and Paise Nineteen Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
182 11 kv Pin insulators with pins (10KN) item182 No Excess(+) Full Conversion INR INR Sixteen Thousand Six Hundred & Eleven and Paise Sixty Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
183 11 kv Disc insulators with fittings (45 KN) item183 No Excess(+) Full Conversion INR INR Seven Thousand Nine Hundred & Sixty Six and Paise Eight Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
184 GI Stay sets complete with 50*8mm stay clamp ,guy insulator(2 nos.),anchor plate(200*200*6mm),nut-bolts,turn -buckles(2 nos.),1.8m long,16mm diameter solid GS stay rod and 7/3.15 mm dia GI stranded wire complete. item184 No Excess(+) Full Conversion INR INR Twenty Four Thousand Nine Hundred & Thirty Seven and Paise Twelve Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
185 Al. Painting item185 ltrs. Excess(+) Full Conversion INR INR Ten Thousand Three Hundred Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
186 Red Oxide item186 ltrs. Excess(+) Full Conversion INR INR Six Thousand Two Hundred & Twenty Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
187 Galvansied Nuts and Bolts of sorts item187 Kg Excess(+) Full Conversion INR INR Three Thousand Six Hundred & Eighteen and Paise Twenty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
188 SITC OF SUB STATION 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
189 63KVA Transformer Level II , 11/0.433KV,3-Phase Distribution Transformer with Bimetallic Terminal Connectors ,Aluminium Wound and with LV Cable Box having detachable Aluminium Gland plate. No Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
190 S.T Pole 8 mtrs long (410-SP15) item190 No Excess(+) Full Conversion INR INR Twenty Eight Thousand Four Hundred & Eighty Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
191 Surge Arrester Station Type 9KV, 10 kA (Polymer Type) item191 Set Excess(+) Full Conversion INR INR Seven Thousand Five Hundred & Seventy Two and Paise Fifty Nine Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
192 11 KV Horn Gap Set, 3 Phase, 200 Amp item192 Set Excess(+) Full Conversion INR INR Seven Thousand One Hundred & Eighty Eight and Paise Fourteen Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
193 11 KV Link Set item193 Set Excess(+) Full Conversion INR INR Ten Thousand Six Hundred & One and Paise Sixty Three Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
194 Channel/Flate/Angle in shape of fabricated X-arms, Top bracket, Angle braces, clamps etc. item194 Kg Excess(+) Full Conversion INR INR Thirty Nine Thousand Six Hundred & Eighty Two and Paise Fifty Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
195 GI Stay sets complete with 50*8mm stay clamp ,guy insulator(2 nos.),anchor plate(200*200*6mm),nut-bolts,turn -buckles(2 nos.),1.8m long,16mm diameter solid GS stay rod and 7/3.15 mm dia GI stranded wire complete. item195 No Excess(+) Full Conversion INR INR Six Thousand Two Hundred & Thirty Four and Paise Twenty Eight Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
196 PVC insulated stranded conductor FRLS type 1.1kv Grade Cable 120mm sq with Thimbles item196 Mtr Excess(+) Full Conversion INR INR Twenty Five Thousand Six Hundred & Eighty Eight and Paise Forty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
197 11 kv Pin insulators with pins (10KN) item197 No Excess(+) Full Conversion INR INR Seven Hundred & Sixty Eight and Paise Ninety Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
198 11 kv Disc insulators with fittings (45 KN) item198 No Excess(+) Full Conversion INR INR One Thousand Eight Hundred & Forty Three and Paise Sixty Two Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
199 Nuts and Bolts of sorts item199 Kg Excess(+) Full Conversion INR INR Two Thousand &Nine and Paise Sixty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
200 Earthing of Sub-station ,excavation of earth pit of dia 650mm and depth 3000mm,installation of earthing pipe of 40mm nominal bore and 4mm wall thickness and length 2.5 mtr.long as per IS 1239.GI strip for neutrl earthing of size 25 mm*3 mm for connection of transformer body ,G.O set and lightening arrestor as per IS 2629/85,GI nuts and bolts ,refilled with earth enhancement materials and earth chamber made of brick masonary with RCC slab cover. (Specification as per cost data) item200 No Excess(+) Full Conversion INR INR Nine Thousand Nine Hundred & Ninety One and Paise Forty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
201 Al. Painting item201 ltrs. Excess(+) Full Conversion INR INR One Thousand &Thirty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
202 Red Oxide item202 ltrs. Excess(+) Full Conversion INR INR Six Hundred & Twenty Two Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
203 Sundry Items/POL item203 LS Excess(+) Full Conversion INR INR Nine Hundred & Thirty Three and Paise Forty Seven Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
204 SITC OF LT Line 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
205 S.T Pole 8 mtrs long (410-SP15) No Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
206 30 mm2 ACSR Weasel Conductor item206 Kms Excess(+) Full Conversion INR INR Seventy One Thousand Nine Hundred & Ninety Two and Paise Thirty Five Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
207 Shakle Insulator (16KN) item207 Nos Excess(+) Full Conversion INR INR Three Thousand Two Hundred & Ninety Two and Paise Forty Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
208 Mukky Clamps item208 Nos. Excess(+) Full Conversion INR INR Seven Thousand One Hundred & Seventy Six and Paise Eighty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
209 Al. Painting item209 ltrs. Excess(+) Full Conversion INR INR Five Thousand One Hundred & Fifty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
210 Red Oxide item210 ltrs. Excess(+) Full Conversion INR INR Three Thousand One Hundred & Ten Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
211 Nuts and Bolts of sorts item211 Kgs Excess(+) Full Conversion INR INR One Thousand Eight Hundred & Ninety Three Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
212 MISC 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
213 7. Creation of 63KVA S/stn alongwith HT/LT network at Meenka Dhariala. 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
214 SITC OF HT Line 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
215 S.T Pole 8 mtrs long (410-SP15) No Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
216 Galvanisied Channel cross-arm including clamps and braces. item216 KG Excess(+) Full Conversion INR INR Eighty Five Thousand Seven Hundred & Thirty Five Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
217 30 mm2 ACSR Weasel Conductor item217 Kms Excess(+) Full Conversion INR INR One Lakh Forty Eight Thousand Seven Hundred & Eighty Four and Paise Nineteen Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
218 11 kv Pin insulators with pins (10KN) item218 No Excess(+) Full Conversion INR INR Sixteen Thousand Six Hundred & Eleven and Paise Sixty Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
219 11 kv Disc insulators with fittings (45 KN) item219 No Excess(+) Full Conversion INR INR Seven Thousand Nine Hundred & Sixty Six and Paise Eight Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
220 GI Stay sets complete with 50*8mm stay clamp ,guy insulator(2 nos.),anchor plate(200*200*6mm),nut-bolts,turn -buckles(2 nos.),1.8m long,16mm diameter solid GS stay rod and 7/3.15 mm dia GI stranded wire complete. item220 No Excess(+) Full Conversion INR INR Twenty Four Thousand Nine Hundred & Thirty Seven and Paise Twelve Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
221 Al. Painting item221 ltrs. Excess(+) Full Conversion INR INR Ten Thousand Three Hundred Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
222 Red Oxide item222 ltrs. Excess(+) Full Conversion INR INR Six Thousand Two Hundred & Twenty Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
223 Galvansied Nuts and Bolts of sorts item223 Kg Excess(+) Full Conversion INR INR Three Thousand Six Hundred & Eighteen and Paise Twenty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
224 SITC OF SUB STATION 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
225 63KVA Transformer Level II , 11/0.433KV,3-Phase Distribution Transformer with Bimetallic Terminal Connectors ,Aluminium Wound and with LV Cable Box having detachable Aluminium Gland plate. No Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
226 S.T Pole 8 mtrs long (410-SP15) item226 No Excess(+) Full Conversion INR INR Twenty Eight Thousand Four Hundred & Eighty Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
227 Surge Arrester Station Type 9KV, 10 kA (Polymer Type) item227 Set Excess(+) Full Conversion INR INR Seven Thousand Five Hundred & Seventy Two and Paise Fifty Nine Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
228 11 KV Horn Gap Set, 3 Phase, 200 Amp item228 Set Excess(+) Full Conversion INR INR Seven Thousand One Hundred & Eighty Eight and Paise Fourteen Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
229 11 KV Link Set item229 Set Excess(+) Full Conversion INR INR Ten Thousand Six Hundred & One and Paise Sixty Three Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
230 Channel/Flate/Angle in shape of fabricated X-arms, Top bracket, Angle braces, clamps etc. item230 Kg Excess(+) Full Conversion INR INR Thirty Nine Thousand Six Hundred & Eighty Two and Paise Fifty Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
231 GI Stay sets complete with 50*8mm stay clamp ,guy insulator(2 nos.),anchor plate(200*200*6mm),nut-bolts,turn -buckles(2 nos.),1.8m long,16mm diameter solid GS stay rod and 7/3.15 mm dia GI stranded wire complete. item231 No Excess(+) Full Conversion INR INR Six Thousand Two Hundred & Thirty Four and Paise Twenty Eight Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
232 PVC insulated stranded conductor FRLS type 1.1kv Grade Cable 120mm sq with Thimbles item232 Mtr Excess(+) Full Conversion INR INR Twenty Five Thousand Six Hundred & Eighty Eight and Paise Forty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
233 11 kv Pin insulators with pins (10KN) item233 No Excess(+) Full Conversion INR INR Seven Hundred & Sixty Eight and Paise Ninety Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
234 11 kv Disc insulators with fittings (45 KN) item234 No Excess(+) Full Conversion INR INR One Thousand Eight Hundred & Forty Three and Paise Sixty Two Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
235 Nuts and Bolts of sorts item235 Kg Excess(+) Full Conversion INR INR Two Thousand &Nine and Paise Sixty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
236 Earthing of Sub-station ,excavation of earth pit of dia 650mm and depth 3000mm,installation of earthing pipe of 40mm nominal bore and 4mm wall thickness and length 2.5 mtr.long as per IS 1239.GI strip for neutrl earthing of size 25 mm*3 mm for connection of transformer body ,G.O set and lightening arrestor as per IS 2629/85,GI nuts and bolts ,refilled with earth enhancement materials and earth chamber made of brick masonary with RCC slab cover. (Specification as per cost data) item236 No Excess(+) Full Conversion INR INR Nine Thousand Nine Hundred & Ninety One and Paise Forty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
237 Al. Painting item237 ltrs. Excess(+) Full Conversion INR INR One Thousand &Thirty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
238 Red Oxide item238 ltrs. Excess(+) Full Conversion INR INR Six Hundred & Twenty Two Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
239 Sundry Items/POL item239 LS Excess(+) Full Conversion INR INR Nine Hundred & Thirty Three and Paise Forty Seven Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
240 SITC OF LT Line 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
241 S.T Pole 8 mtrs long (410-SP15) No Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
242 30 mm2 ACSR Weasel Conductor item242 Kms Excess(+) Full Conversion INR INR Fifty Seven Thousand Five Hundred & Ninety Three and Paise Eighty Eight Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
243 Shakle Insulator (16KN) item243 Nos Excess(+) Full Conversion INR INR Two Thousand Six Hundred & Thirty Three and Paise Ninety Two Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
244 Mukky Clamps item244 Nos. Excess(+) Full Conversion INR INR Five Thousand Seven Hundred & Forty One and Paise Forty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
245 Al. Painting item245 ltrs. Excess(+) Full Conversion INR INR Four Thousand One Hundred & Twenty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
246 Red Oxide item246 ltrs. Excess(+) Full Conversion INR INR Two Thousand Four Hundred & Eighty Eight Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
247 Nuts and Bolts of sorts item247 Kgs Excess(+) Full Conversion INR INR One Thousand Five Hundred & Fourteen and Paise Forty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
248 8. Creation of 63KVA S/stn alongwith HT/LT network at Lower Kangri. 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
249 SITC OF HT Line 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
250 S.T Pole 8 mtrs long (410-SP15) No Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
251 Galvanisied Channel cross-arm including clamps and braces. item251 KG Excess(+) Full Conversion INR INR Twenty Five Thousand Seven Hundred & Twenty and Paise Fifty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
252 30 mm2 ACSR Weasel Conductor item252 Kms Excess(+) Full Conversion INR INR Forty Three Thousand One Hundred & Ninety Five and Paise Forty One Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
253 11 kv Pin insulators with pins (10KN) item253 No Excess(+) Full Conversion INR INR Four Thousand Nine Hundred & Eighty Three and Paise Forty Eight Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
254 11 kv Disc insulators with fittings (45 KN) item254 No Excess(+) Full Conversion INR INR Three Thousand Nine Hundred & Eighty Three and Paise Four Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
255 GI Stay sets complete with 50*8mm stay clamp ,guy insulator(2 nos.),anchor plate(200*200*6mm),nut-bolts,turn -buckles(2 nos.),1.8m long,16mm diameter solid GS stay rod and 7/3.15 mm dia GI stranded wire complete. item255 No Excess(+) Full Conversion INR INR Twelve Thousand Four Hundred & Sixty Eight and Paise Fifty Six Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
256 Al. Painting item256 ltrs. Excess(+) Full Conversion INR INR Three Thousand &Ninety Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
257 Red Oxide item257 ltrs. Excess(+) Full Conversion INR INR One Thousand Eight Hundred & Sixty Six Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
258 Galvansied Nuts and Bolts of sorts item258 Kg Excess(+) Full Conversion INR INR One Thousand &Eighty Five and Paise Forty Six Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
259 SITC OF SUB STATION 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
260 63KVA Transformer Level II , 11/0.433KV,3-Phase Distribution Transformer with Bimetallic Terminal Connectors ,Aluminium Wound and with LV Cable Box having detachable Aluminium Gland plate. No Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
261 S.T Pole 8 mtrs long (410-SP15) item261 No Excess(+) Full Conversion INR INR Twenty Eight Thousand Four Hundred & Eighty Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
262 Surge Arrester Station Type 9KV, 10 kA (Polymer Type) item262 Set Excess(+) Full Conversion INR INR Seven Thousand Five Hundred & Seventy Two and Paise Fifty Nine Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
263 11 KV Horn Gap Set, 3 Phase, 200 Amp item263 Set Excess(+) Full Conversion INR INR Seven Thousand One Hundred & Eighty Eight and Paise Fourteen Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
264 11 KV Link Set item264 Set Excess(+) Full Conversion INR INR Ten Thousand Six Hundred & One and Paise Sixty Three Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
265 Channel/Flate/Angle in shape of fabricated X-arms, Top bracket, Angle braces, clamps etc. item265 Kg Excess(+) Full Conversion INR INR Thirty Nine Thousand Six Hundred & Eighty Two and Paise Fifty Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
266 GI Stay sets complete with 50*8mm stay clamp ,guy insulator(2 nos.),anchor plate(200*200*6mm),nut-bolts,turn -buckles(2 nos.),1.8m long,16mm diameter solid GS stay rod and 7/3.15 mm dia GI stranded wire complete. item266 No Excess(+) Full Conversion INR INR Six Thousand Two Hundred & Thirty Four and Paise Twenty Eight Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
267 PVC insulated stranded conductor FRLS type 1.1kv Grade Cable 120mm sq with Thimbles item267 Mtr Excess(+) Full Conversion INR INR Twenty Five Thousand Six Hundred & Eighty Eight and Paise Forty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
268 11 kv Pin insulators with pins (10KN) item268 No Excess(+) Full Conversion INR INR Seven Hundred & Sixty Eight and Paise Ninety Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
269 11 kv Disc insulators with fittings (45 KN) item269 No Excess(+) Full Conversion INR INR One Thousand Eight Hundred & Forty Three and Paise Sixty Two Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
270 Nuts and Bolts of sorts item270 Kg Excess(+) Full Conversion INR INR Two Thousand &Nine and Paise Sixty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
271 Earthing of Sub-station ,excavation of earth pit of dia 650mm and depth 3000mm,installation of earthing pipe of 40mm nominal bore and 4mm wall thickness and length 2.5 mtr.long as per IS 1239.GI strip for neutrl earthing of size 25 mm*3 mm for connection of transformer body ,G.O set and lightening arrestor as per IS 2629/85,GI nuts and bolts ,refilled with earth enhancement materials and earth chamber made of brick masonary with RCC slab cover. (Specification as per cost data) item271 No Excess(+) Full Conversion INR INR Nine Thousand Nine Hundred & Ninety One and Paise Forty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
272 Al. Painting item272 ltrs. Excess(+) Full Conversion INR INR One Thousand &Thirty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
273 Red Oxide item273 ltrs. Excess(+) Full Conversion INR INR Six Hundred & Twenty Two Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
274 Sundry Items/POL item274 LS Excess(+) Full Conversion INR INR Nine Hundred & Thirty Three and Paise Forty Seven Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
275 SITC OF LT Line 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
276 S.T Pole 8 mtrs long (410-SP15) No Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
277 30 mm2 ACSR Weasel Conductor item277 Kms Excess(+) Full Conversion INR INR Twenty Eight Thousand Seven Hundred & Ninety Six and Paise Ninety Four Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
278 Shakle Insulator (16KN) item278 Nos Excess(+) Full Conversion INR INR One Thousand Three Hundred & Sixteen and Paise Ninety Six Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
279 Mukky Clamps item279 Nos. Excess(+) Full Conversion INR INR Two Thousand Eight Hundred & Seventy and Paise Seventy Two Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
280 Al. Painting item280 ltrs. Excess(+) Full Conversion INR INR Two Thousand &Sixty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
281 Red Oxide item281 ltrs. Excess(+) Full Conversion INR INR One Thousand Two Hundred & Forty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
282 Nuts and Bolts of sorts item282 Kgs Excess(+) Full Conversion INR INR Seven Hundred & Fifty Seven and Paise Twenty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
283 9. Creation of 63KVA S/stn alongwith HT/LT network at Parran Baglan. 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
284 SITC OF HT Line 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
285 S.T Pole 8 mtrs long (410-SP15) No Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
286 Galvanisied Channel cross-arm including clamps and braces. item286 KG Excess(+) Full Conversion INR INR Forty Two Thousand Eight Hundred & Sixty Seven and Paise Fifty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
287 30 mm2 ACSR Weasel Conductor item287 Kms Excess(+) Full Conversion INR INR Seventy One Thousand Nine Hundred & Ninety Two and Paise Thirty Five Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
288 11 kv Pin insulators with pins (10KN) item288 No Excess(+) Full Conversion INR INR Eight Thousand Three Hundred & Five and Paise Eighty Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
289 11 kv Disc insulators with fittings (45 KN) item289 No Excess(+) Full Conversion INR INR Five Thousand Nine Hundred & Seventy Four and Paise Fifty Six Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
290 GI Stay sets complete with 50*8mm stay clamp ,guy insulator(2 nos.),anchor plate(200*200*6mm),nut-bolts,turn -buckles(2 nos.),1.8m long,16mm diameter solid GS stay rod and 7/3.15 mm dia GI stranded wire complete. item290 No Excess(+) Full Conversion INR INR Eighteen Thousand Seven Hundred & Two and Paise Eighty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
291 Al. Painting item291 ltrs. Excess(+) Full Conversion INR INR Five Thousand One Hundred & Fifty Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
292 Red Oxide item292 ltrs. Excess(+) Full Conversion INR INR Three Thousand One Hundred & Ten Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
293 Galvansied Nuts and Bolts of sorts item293 Kg Excess(+) Full Conversion INR INR One Thousand Eight Hundred & Nine and Paise Ten Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
294 SITC OF SUB STATION 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
295 63KVA Transformer Level II , 11/0.433KV,3-Phase Distribution Transformer with Bimetallic Terminal Connectors ,Aluminium Wound and with LV Cable Box having detachable Aluminium Gland plate. No Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
296 S.T Pole 8 mtrs long (410-SP15) item296 No Excess(+) Full Conversion INR INR Twenty Eight Thousand Four Hundred & Eighty Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
297 Surge Arrester Station Type 9KV, 10 kA (Polymer Type) item297 Set Excess(+) Full Conversion INR INR Seven Thousand Five Hundred & Seventy Two and Paise Fifty Nine Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
298 11 KV Horn Gap Set, 3 Phase, 200 Amp item298 Set Excess(+) Full Conversion INR INR Seven Thousand One Hundred & Eighty Eight and Paise Fourteen Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
299 11 KV Link Set item299 Set Excess(+) Full Conversion INR INR Ten Thousand Six Hundred & One and Paise Sixty Three Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
300 Channel/Flate/Angle in shape of fabricated X-arms, Top bracket, Angle braces, clamps etc. item300 Kg Excess(+) Full Conversion INR INR Thirty Nine Thousand Six Hundred & Eighty Two and Paise Fifty Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
301 GI Stay sets complete with 50*8mm stay clamp ,guy insulator(2 nos.),anchor plate(200*200*6mm),nut-bolts,turn -buckles(2 nos.),1.8m long,16mm diameter solid GS stay rod and 7/3.15 mm dia GI stranded wire complete. item301 No Excess(+) Full Conversion INR INR Six Thousand Two Hundred & Thirty Four and Paise Twenty Eight Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
302 PVC insulated stranded conductor FRLS type 1.1kv Grade Cable 120mm sq with Thimbles item302 Mtr Excess(+) Full Conversion INR INR Twenty Five Thousand Six Hundred & Eighty Eight and Paise Forty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
303 11 kv Pin insulators with pins (10KN) item303 No Excess(+) Full Conversion INR INR Seven Hundred & Sixty Eight and Paise Ninety Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
304 11 kv Disc insulators with fittings (45 KN) item304 No Excess(+) Full Conversion INR INR One Thousand Eight Hundred & Forty Three and Paise Sixty Two Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
305 Nuts and Bolts of sorts item305 Kg Excess(+) Full Conversion INR INR Two Thousand &Nine and Paise Sixty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
306 Earthing of Sub-station ,excavation of earth pit of dia 650mm and depth 3000mm,installation of earthing pipe of 40mm nominal bore and 4mm wall thickness and length 2.5 mtr.long as per IS 1239.GI strip for neutrl earthing of size 25 mm*3 mm for connection of transformer body ,G.O set and lightening arrestor as per IS 2629/85,GI nuts and bolts ,refilled with earth enhancement materials and earth chamber made of brick masonary with RCC slab cover. (Specification as per cost data) item306 No Excess(+) Full Conversion INR INR Nine Thousand Nine Hundred & Ninety One and Paise Forty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
307 Al. Painting item307 ltrs. Excess(+) Full Conversion INR INR One Thousand &Thirty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
308 Red Oxide item308 ltrs. Excess(+) Full Conversion INR INR Six Hundred & Twenty Two Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
309 Sundry Items/POL item309 LS Excess(+) Full Conversion INR INR Nine Hundred & Thirty Three and Paise Forty Seven Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
310 SITC OF LT Line 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
311 S.T Pole 8 mtrs long (410-SP15) No Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
312 30 mm2 ACSR Weasel Conductor item312 Kms Excess(+) Full Conversion INR INR One Lakh Nineteen Thousand Nine Hundred & Eighty Seven and Paise Twenty Five Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
313 Shakle Insulator (16KN) item313 Nos Excess(+) Full Conversion INR INR Five Thousand Two Hundred & Sixty Seven and Paise Eighty Four Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
314 Mukky Clamps item314 Nos. Excess(+) Full Conversion INR INR Eleven Thousand Four Hundred & Eighty Two and Paise Eighty Eight Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
315 Al. Painting item315 ltrs. Excess(+) Full Conversion INR INR Eight Thousand Two Hundred & Forty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
316 Red Oxide item316 ltrs. Excess(+) Full Conversion INR INR Four Thousand Nine Hundred & Seventy Six Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
317 Nuts and Bolts of sorts item317 Kgs Excess(+) Full Conversion INR INR Three Thousand &Twenty Eight and Paise Eighty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
318 10. Creation of 63KVA S/stn alongwith HT/LT network atLower Doogani. 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
319 SITC OF HT Line 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
320 S.T Pole 8 mtrs long (410-SP15) No Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
321 Galvanisied Channel cross-arm including clamps and braces. item321 KG Excess(+) Full Conversion INR INR Thirty Four Thousand Two Hundred & Ninety Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
322 30 mm2 ACSR Weasel Conductor item322 Kms Excess(+) Full Conversion INR INR Fifty Seven Thousand Five Hundred & Ninety Three and Paise Eighty Eight Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
323 11 kv Pin insulators with pins (10KN) item323 No Excess(+) Full Conversion INR INR Six Thousand Six Hundred & Forty Four and Paise Sixty Four Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
324 11 kv Disc insulators with fittings (45 KN) item324 No Excess(+) Full Conversion INR INR Three Thousand Nine Hundred & Eighty Three and Paise Four Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
325 GI Stay sets complete with 50*8mm stay clamp ,guy insulator(2 nos.),anchor plate(200*200*6mm),nut-bolts,turn -buckles(2 nos.),1.8m long,16mm diameter solid GS stay rod and 7/3.15 mm dia GI stranded wire complete. item325 No Excess(+) Full Conversion INR INR Twelve Thousand Four Hundred & Sixty Eight and Paise Fifty Six Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
326 Al. Painting item326 ltrs. Excess(+) Full Conversion INR INR Four Thousand One Hundred & Twenty Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
327 Red Oxide item327 ltrs. Excess(+) Full Conversion INR INR Two Thousand Four Hundred & Eighty Eight Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
328 Galvansied Nuts and Bolts of sorts item328 Kg Excess(+) Full Conversion INR INR One Thousand Four Hundred & Forty Seven and Paise Twenty Eight Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
329 SITC OF SUB STATION 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
330 63KVA Transformer Level II , 11/0.433KV,3-Phase Distribution Transformer with Bimetallic Terminal Connectors ,Aluminium Wound and with LV Cable Box having detachable Aluminium Gland plate. No Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
331 S.T Pole 8 mtrs long (410-SP15) item331 No Excess(+) Full Conversion INR INR Twenty Eight Thousand Four Hundred & Eighty Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
332 Surge Arrester Station Type 9KV, 10 kA (Polymer Type) item332 Set Excess(+) Full Conversion INR INR Seven Thousand Five Hundred & Seventy Two and Paise Fifty Nine Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
333 11 KV Horn Gap Set, 3 Phase, 200 Amp item333 Set Excess(+) Full Conversion INR INR Seven Thousand One Hundred & Eighty Eight and Paise Fourteen Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
334 11 KV Link Set item334 Set Excess(+) Full Conversion INR INR Ten Thousand Six Hundred & One and Paise Sixty Three Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
335 Channel/Flate/Angle in shape of fabricated X-arms, Top bracket, Angle braces, clamps etc. item335 Kg Excess(+) Full Conversion INR INR Thirty Nine Thousand Six Hundred & Eighty Two and Paise Fifty Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
336 GI Stay sets complete with 50*8mm stay clamp ,guy insulator(2 nos.),anchor plate(200*200*6mm),nut-bolts,turn -buckles(2 nos.),1.8m long,16mm diameter solid GS stay rod and 7/3.15 mm dia GI stranded wire complete. item336 No Excess(+) Full Conversion INR INR Six Thousand Two Hundred & Thirty Four and Paise Twenty Eight Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
337 PVC insulated stranded conductor FRLS type 1.1kv Grade Cable 120mm sq with Thimbles item337 Mtr Excess(+) Full Conversion INR INR Twenty Five Thousand Six Hundred & Eighty Eight and Paise Forty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
338 11 kv Pin insulators with pins (10KN) item338 No Excess(+) Full Conversion INR INR Seven Hundred & Sixty Eight and Paise Ninety Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
339 11 kv Disc insulators with fittings (45 KN) item339 No Excess(+) Full Conversion INR INR One Thousand Eight Hundred & Forty Three and Paise Sixty Two Only 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
340 Nuts and Bolts of sorts item340 Kg Excess(+) Full Conversion INR INR Two Thousand &Nine and Paise Sixty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
341 Earthing of Sub-station ,excavation of earth pit of dia 650mm and depth 3000mm,installation of earthing pipe of 40mm nominal bore and 4mm wall thickness and length 2.5 mtr.long as per IS 1239.GI strip for neutrl earthing of size 25 mm*3 mm for connection of transformer body ,G.O set and lightening arrestor as per IS 2629/85,GI nuts and bolts ,refilled with earth enhancement materials and earth chamber made of brick masonary with RCC slab cover. (Specification as per cost data) item341 No Excess(+) Full Conversion INR INR Nine Thousand Nine Hundred & Ninety One and Paise Forty Four Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
342 Al. Painting item342 ltrs. Excess(+) Full Conversion INR INR One Thousand &Thirty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
343 Red Oxide item343 ltrs. Excess(+) Full Conversion INR INR Six Hundred & Twenty Two Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
344 Sundry Items/POL item344 LS Excess(+) Full Conversion INR INR Nine Hundred & Thirty Three and Paise Forty Seven Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
345 SITC OF LT Line 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
346 S.T Pole 8 mtrs long (410-SP15) No Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
347 30 mm2 ACSR Weasel Conductor item347 Kms Excess(+) Full Conversion INR INR One Lakh Nineteen Thousand Nine Hundred & Eighty Seven and Paise Twenty Five Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
348 Shakle Insulator (16KN) item348 Nos Excess(+) Full Conversion INR INR Five Thousand Two Hundred & Sixty Seven and Paise Eighty Four Only 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
349 Mukky Clamps item349 Nos. Excess(+) Full Conversion INR INR Eleven Thousand Four Hundred & Eighty Two and Paise Eighty Eight Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
350 Al. Painting item350 ltrs. Excess(+) Full Conversion INR INR Eight Thousand Two Hundred & Forty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
351 Red Oxide item351 ltrs. Excess(+) Full Conversion INR INR Four Thousand Nine Hundred & Seventy Six Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
352 Nuts and Bolts of sorts item352 Kgs Excess(+) Full Conversion INR INR Three Thousand &Twenty Eight and Paise Eighty Only 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
353 MISC 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
354 Providing of computriised single diagram of the complete work depicting all vital items including landmark (size of sheet 24X24 inch) item354 no Excess(+) Full Conversion INR INR Five Thousand Only 2 Construction of chamber for 100mm sluices valve item3 10 Nos
355 installation of sign board of dimensions (2*3) sq. ft depicting name of the work ,scheme and executing agency along with name of the contractor with legs of 3 feet height embedded in cement concrete item355 no Excess(+) Full Conversion INR INR Thirty Five Thousand Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
356 Providing of geo tagged coloured photographs of all the vital items of the work including name plate of Transformer(size of photograph 4X6 inch) item356 no Excess(+) Full Conversion INR INR One Thousand Two Hundred & Fifty Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Total in Figures INR Eighty Five Lakh Thirteen Thousand Six Hundred & Fifty Six and Paise Eighty Seven Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Please Enable Macros to View BoQ information
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.87 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
sbd.pdf
Tender Documents • 1.56 MB
BOQ_977331.xls
BOQ • 0.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .