Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 LAccepted-AOC | ₹13.3 L | L1 | Accepted-AOC L1 ACCEPTED |
| Sl No | Description | Qty | Unit | L&M INFRA BUILDERS L1 |
|---|---|---|---|---|
| 1.00Green belt 1 | ||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 90.07 | cum | 240 ₹21,617.76 |
| 1.00 | 30.2.2:Supplying and stacking of good earth at site including royalty and carriage upto 5 k.m. lead complete (earth measured in stacks will be reduced by 20% for payment). | 280 | cum | 700 ₹2.0 L |
| 1.00 | 30.2.25:Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 5 k.m. lead complete (cattle manure measured in stacks will reduced by 8% for Payment). | 37 | cum | 675 ₹24,975 |
| 1.00 | 30.2.4.1:Supplying and stacking at site dump manure from approved source, including carriage upto 5 k.m. lead complete (manure measured in stacks will be reduced by 8% for payment) :Screened through sieve of I.S. designation 20 mm | 37 | cum | 100 ₹3,700 |
| 1.00 | 30.2.9:Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge | 172 | cum | 57 ₹9,804 |
| 1.01 | 30.2.8:Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately). | 172 | cum | 80 ₹13,760 |
| 1.01 | 30.2.12:Uprooting rank vegetation and weeds by digging the area to a depth of 60 cm, removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water, uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts. | 328.12 | sqm | 95 ₹31,171.88 |
| 1.01 | OD3519/2025-2026:11.9 Planting of trees ornamental / fruit plant in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, planting the saplings, backfilling the trench, watering and all maintaining etc to the plants for one year (based on Rate approved as per TS ORDER No. HED/CEHED/EST_TS/404/2023_5_1_1 Dated: 11-09-2023 (516/2023-2024)) | 150 | each | 1,335 ₹2.0 L |
| 1.01 | 30.2.10.1:Grassing with selection No. 1 grass including watering and maintenance of the lawn for 60 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth, if needed (the grass and good earth shall be paid for separately).In rows 5 cm apart in both directions | 240 | sqm | 27 ₹6,480 |
Tender Value
₹13.3 L
EMD Value
₹33,269
Closing Date
22 Jan 2026, 5:00 pmClosed
Executive Engineer
Office of the Executive Engineer,Harbour Engineering Division Kasaragod
PMMSY-EXPANSION OF KASARAGOD FISHERY HARBOUR GREEN BELT
2026_HED_826487_1
HED/CEHED/TR/1/2025_5_1_1/1
Open Tender
Civil Works - Others
180 days
Kasaragod
Please refer Tender documents.
12 documents required · 12 mandatory
₹2,760
Yes
₹33,269
Yes
26 Feb 2026
8 Jan 2026
24 Jan 2026
8 Jan 2026
22 Jan 2026
8 Jan 2026
Green belt 1
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
30.2.2:Supplying and stacking of good earth at site including royalty and carriage upto 5 k.m. lead complete (earth measured in stacks will be reduced by 20% for payment).
30.2.25:Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 5 k.m. lead complete (cattle manure measured in stacks will reduced by 8% for Payment).
30.2.4.1:Supplying and stacking at site dump manure from approved source, including carriage upto 5 k.m. lead complete (manure measured in stacks will be reduced by 8% for payment) :Screened through sieve of I.S. designation 20 mm
30.2.9:Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge
30.2.8:Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately).
30.2.12:Uprooting rank vegetation and weeds by digging the area to a depth of 60 cm, removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water, uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts.
OD3519/2025-2026:11.9 Planting of trees ornamental / fruit plant in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, planting the saplings, backfilling the trench, watering and all maintaining etc to the plants for one year (based on Rate approved as per TS ORDER No. HED/CEHED/EST_TS/404/2023_5_1_1 Dated: 11-09-2023 (516/2023-2024))
OD8645/2024-2025:Supply of Bougainvillea Plant for Garden
OD4390/2025-2026:Laterate masonry with neatly dressed laterate stone of size 30x20x20cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc(Ref 50.6.7.1)
OD3723/2025-2026:Engaging Mason First class or artistic work at the Harbour Entrance as per direction of Departmental officers at site (Rate approved as per EST/CE/ HED/404/2023)
OD3724/2025-2026:Engaging Coolie for making artistic work at the Harbour Entrance as per direction of Departmental officers at site (Rate approved as per EST/CEHED/ESt 404/2023)
Green belt 3
65.7:Hydraulic excavator
OD8638/2024-2025:Engaging Plumber
OD8642/2024-2025:Supply of Buddha Bamboo
30.2.58:Providing and fixing of Tuflex Garden fencing Hexagonal net/or equivalent of green colour having contents Weight grams/sqm. 510 (+/- 8%) in width of 60 cm. with bamboo of 90 cm. length and 18-20 girth. The bamboo should be painted with green colour paint of approved brand and manufacture two or more coats and fixed 30 cm. below ground level and 60 cm. above ground level at a distance of 1.50 mtrs. The net and bamboo should be binded with 2 mm. G.I. Wire at equal distance of three places in each bamboo complete and as per direction of Engineer-in-charge.
Green belt 4
OD8631/2024-2025:Providing Name board of size 20 feet X 5 feet fish model or other model Specified by the Departmental officers at Site using Aluminium composite pannel (ACP)and metal frame for lighting and back covering(box type) also metal frame and ACP box type Board on both sides at an average height 6.00 mon Both side, Cost of material , Design Charges, Concrete setting Charge, Transportation etc.(Based on TS received from SE for the TS ORDER No. HED/CEHED/EST_TS/404/2023_5_1_1 Dated: 11-09-2023 (516/2023-2024))
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1386457.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_1386457.xls
BOQ • 0.31 MB
viewsbd.pdf
Other Document • 1.63 MB
Download all tender documents and submit your bid