| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.4 LAccepted-AOC AMBAGAN BISHALGARH SEPAHIJALA TRIPURA PIN 799102 | BISHALGARH | SEPAHIJALA | TRIPURA | 799102 | ₹59.4 L | L1 | Accepted-AOC Reasonable |
| 2 | L2₹59.9 L+₹54,329 (0.91%)Rejected-Finance 1 NO BENGALI PARA PASCHIM BASA AMARPUR GOMATI DISTRICT | ₹59.9 L+₹54,329 (0.91%) | L2 | Rejected-Finance High Rate |
| 3 | L3₹62.5 L+₹3.1 L (5.28%)Rejected-Finance CO RPORTARATE OFFICE UJJAYANTA MARKET BLOCK C ROOM NO 310 AGARTALA WEST TRIPURA | WEST TRIPURA | TRIPURA | 799002 | ₹62.5 L+₹3.1 L (5.28%) | L3 | Rejected-Finance High Rate |
| 4 | L4₹62.9 L+₹3.5 L (5.96%)Rejected-Finance | ₹62.9 L+₹3.5 L (5.96%) | L4 | Rejected-Finance High Rate |
| 5 | L5₹64.4 L+₹5.0 L (8.37%)Rejected-Finance | ₹64.4 L+₹5.0 L (8.37%) | L5 | Rejected-Finance High Rate |
Tender Value
₹72.4 L
EMD Value
₹1.4 L
Closing Date
2 Mar 2026, 3:00 pmClosed
The Executive Engineer,BishalgarhDivision,PWD(RnB)
O/O Executive Engineer,BishalgarhDivision,PWD(RnB)
Constrcution of 8_Eight_ Nos Temporary class room 8point00 mx7point00 m with varandah of 1point50 m wide, Kitchen, 2_Two_ Nos Gents Toilet and 2_Two_ Nos Girls Toilet at Konabon Colony High School
2026_CEPWD_70690_1
34_B_DNIeT_SEIV_PWD(RnB)_25_26
Open Tender
Civil Works - Building
Percentage
120 days
Konaban
Please refer Tender documents.
5 documents required · 5 mandatory
₹4,000
₹1.4 L
16 May 2026
21 Feb 2026
2 Mar 2026
21 Feb 2026
2 Mar 2026
21 Feb 2026
21 Feb 2026 - 27 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
-All kinds of soil | 0.2 | Cum | 231.6 | ₹46.09 |
| 0.0 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
-All kinds of soil | 1 | Cum | 161.3 | ₹161.14 |
| 0.0 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 1 | Cum | 338.6 | ₹338.26 |
| 0.0 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete | 0.6 | Cum | 1,177.3 | ₹705.2 |
| 0.0 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -
-All work upto plinth level: | - | - | - | - |
| 0.9 | a) 1:4:8 ( 1 Cement: 4 fine sand : 8 graded well burnt brick aggregate 40 mm nominal size) | - | Cum | 8,980 | - |
| 0.0 | b) 1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 40 mm nominal size) | - | Cum | 9,295.7 | - |
| 0.0 | Centering shuttering including struttings, propping etc. and removal of form work for:
a) Foundations, footings, bases for columns. | 1 | Sqm | 303.1 | ₹302.8 |
| 0.0 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement
-All work upto plinth level:
1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 1 | Cum | 12,073.8 | ₹12,061.73 |
| 0.0 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement
1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 1 | Cum | 13,305.8 | ₹13,292.49 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_71937.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.51 MB
Upload_DNIeT.pdf
Tender Documents • 3.09 MB
BOQ_71937.xls
BOQ • 0.33 MB
Annexure_1.pdf
Additional Documents • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .