Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹27.9 LAccepted-AOC 1759 SECOND FLOOR SECTOR 28 FARIDABAD 121008 HARYANA | FARIDABAD | FARIDABAD | HARYANA | 121008 | L-1 | Accepted-AOC L1 | |
| 2 | L-2₹29.3 L+₹1.4 L (5.17%)Rejected-AOC AATISH BAZAN STREET SAHARANPUR SAHARANPUR UTTAR PRADESH 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | L-2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical GATE NO 1 PARAS PURAM COLONY BEHAT ROAD SAHARANPUR | SAHARANPUR | - | Rejected-Technical Not Qualified |
Tender Value
₹29.3 L
EMD Value
₹73,500
Closing Date
2 Nov 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
E.E. (EM SHP) Rishikesh
OFFICE OFEXECUTIVE ENGINEER (EM-SHP), UJVN LIMITED, MANERI BHALI, COLONY, PRAGATIPURAM, RISHIKESH
Repair and maintenance of Unit 2 of Pilangad
2022_UJVN_49260_1
07/EE (EM)/(SHP)/Rishikesh/2022-23
Open Tender
Repair and Maintenance Works
Item Wise
60 days
Pilangad Uttarkashi
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
UJVN LIMITED
₹73,500
19 Sept 2023
14 Sept 2022
4 Nov 2022
14 Sept 2022
2 Nov 2022
14 Sept 2022
Butterfly Valve Assembly:- Dismantling of complete BFV, fixing of dummy plates on penstock. a) Shifting of BFV assembly to factory for all repairing & testing works. b) Inspection, Cleaning , Replacement of BFV disc seal, repairing of SSseal locking ring, drilling andtapping,replacement of damaged SS hardware, adjustmentofseal, drytesting BFV completeinall respect including all men,material& allT&Prequiredfor propercompletion of work including replacement of all fixing bolts & nuts make TVS/Unbrako 8.8 grade. c) Butterfly valve housing inside seal seating area (stainless steel) complete repair by welding and machining after dismantling of disc and bushes. d) Supply/replacement of damaged DU bushes, fixing of DU bushes by usingnitrogen gas cooling method at driving andnon driving end of BFV disc. e) BFV Servomotor:- Complete repair and servicing of servomotor by replacing seal, Hardware’s etc.
RUNNER ASSEMBLY:- Dismantling of runner assembly, measuring blade profile, inlet & discharge area dimension, welding with proper heat treatment process, grinding, profile making, machining and balancing of Runner. Maintaining Final dimension as per drawing for full load output capacity in all respect including all man & material required for proper completion of work .
TOP COVER:- Dismantling, Removal of damaged crack portion by deep cutting, grinding, welding by using rod SS 309 MO, complete filling of SS metal by SS 309MO welding rod on the labyrinth ring portion or replacement of new labyrinth ring where the runner to labyrinth ring gap 0.6mm to be maintained ( presently it is 1.86mm) as per OEM Drawings, complete machining of welded portion , testing-complete in all respect including all man & material required for proper completion of work .
BOTTOM COVER:- Dismantling, Removal of damaged crack portion by deep cutting, grinding, welding by using rod SS 309 MO, complete filling of SS metal by SS 309MO welding rod on the labyrinth ring portion OR Replacement of labyrinth ring with new where the runner to labyrinth ring gap 0.6mm to be maintained (presently it is 1.86mm) as per OEM Drawings, complete machining of welded portion , testing-complete in all respect including all man & material required for proper completion of work.
GUIDE VANE ASSEMBLY:- a) Cleaning, adjustment, replacement of damaged O rings, Proper Setting of all 24 Nos of guide vanes according to the dimension in drawing ,link & lever drilling, tapping, reaming, replacement of damaged dowel pin & circlip, dry testing and operation- complete in all respect including all man and material required for proper completion of work.
b) Guide vanes (24 nos) repair by welding, grinding & repair of Guide sealing collar of driving and non driving end & machining of collars, complete in all respect including all men, material & all T&P required for proper completion of work..
STUFFING BOX:- Complete repairing of stuffing box by welding, grinding and machining of seal seating area for proper function including all man and material required for proper completion of work.
SHSFT SEAL SLEEVE:- complete Shaft seal sleeve Rectification/repair work by ss welding and machining complete in all respect including all men, material & all T&P required for proper completion of work.
DE BEARING:- Rebabitting of 24 Nos of thrust pads & 02 numbers of journal pads, replacement of brass ring & its hardwares. Proper fixing, adjustment, blue matching of thrust pad with trust collar and guide pad with turbine shaft, complete in all respect including all man and material required for proper completion of work.
Complete reassembly of turbine components, Levelling and alignment of complete turbine & generator assembly and testing & commissioning of machine.
Generator Power cable termination Kit :- Supply and installation (both the side of cable) of XLPE cable Termination Kit with lug arrangement & earthling provision for Generator cable having size of 300 sq.mm armoured three cable , 3.3.KV , 3phase, testing & commissioning in all respect including all man & material required for proper ompletion of work.
LINKER ENGINEERS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .