DGM - PRODUCTION and TECHNICAL SERVCE.
MFL,MANALI,CHENNAI.
RENOVATION OF NEW TRAINING CENTER FOR USING AS FIRE STATION.
2020_MFL_554816_1
ESER/TS/FIRE STATION/220420/003 DATED 02.04.2020.
Open Tender
Miscellaneous Services
Works
365 days
MFL, MANALI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹29,100
Yes
24 Aug 2020
2 Apr 2020
23 Apr 2020
2 Apr 2020
22 Apr 2020
2 Apr 2020
Toilet ground floor :
Flush door (0.9 m X 2.1 m) = 1.89 m2
Western toilet, Pipe connections, Accessories & All necessary fittings.
Ventilators – UPVC (0.250m x 0.250m)
Ground Floor (Firemen Room):
UPVC window (1.2 m X 1.2 m ) = 1.44 m2
Flush Door (0.9 m X 2.1 m) = 1.89 m2
Ground floor (Supervisors / Safety officer room) :
UPVC window (1.2 m X 1.2 m ) = 1.44 m2
Flush Door (0.9 m X 2.1 m) = 1.89 m2
Ground floor (Manager room) :
Flush Door (0.9 m X 2.1 m) = 1.89 m2
UPVC window (1.2 m X 1.2 m ) = 1.44 m2
Stair case area UPVC window (1.2 m X 1.2 m ) = 1.44 m2
First floor - 1(Copper / gunmetal store) :
Flush Door (0.9 m X 2.1 m) = 1.89 m2
UPVC window (1.2 m X 1.2 m ) = 1.44 m2
Brick work (1 m3)
Plastering (4 m2)
First floor - 2 (Fire Monitors / pipes / fittings store) :
UPVC window (1.2 m X 1.2 m ) = 1.44 m2
Flush Door (0.9 m X 2.1 m) = 1.89 m2
Ceiling Plastering (30 m2)
First floor – 3(Fire Extinguishers store) :
UPVC window (1.2 m X 1.2 m ) = 1.44 m2
Flush door (0.9 m X 2.1 m) = 1.89 m2
Brick work (all window area )(4 m3)
Foam / Chemical powder /PPEs store rooms in Main truck bay :
Flush Door (0.9 m X 2.1 m) = 1.89 m2
Old Concrete demolition (1m3)
Brick work for rooms partition (25 m X0.23 m X 2.1 m) = 12m3
Plastering (25m X 2.1m X2m) = 105m3
General :
Plinth protection around Fire station (50m X 1.5m X 0.1m) = 7.5 m3
Drain line cover slabs (37m X 0.75M X 0.15m) = 5 m3
Gutter walls Plastering (4m X 37M X 0.6m) = 88.8 m3
Steel for drain line cover slabs
Brick work for gutter walls - 2 X (37m X 0.23m X 0.6m) = 10m3
PCC for gutters (37m X 0.9m X 0.1m) = 4m3
Painting (inside + outside) – supercem quality (90m X 5m X 2 X 2) = 1840 m2 Rooms = 660 m2 Total = 2500 m2
False ceiling – (6.1m X 11m) = 68m2
Compound wall (precast slab) 150’ X 5’ = 750 sft.
Cupboards in all rooms (Brick work, concrete slabs, wooden doors)
Sunshades / Outer touch up work
Approach metal cage ladder for roof area
Sugirthas Utility Solutions
Dassara Constructions
Sugirthas Utility Solutions
Ms. Jayant N. Devkar Construction
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .