Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71.5 LAccepted-AOC DOOR NO 39 5 27 1 MURALINAGAR INDUSTRIAL ESTATE PO VISAKHAPATNAM 530 007 | VISAKHAPATNAM | VISAKHAPATNAM | ANDHRA PRADESH | 530007 | L1 | Accepted-AOC Being Lowest Vendor | |
| 2 | L2₹78.3 L+₹6.8 L (9.46%)Rejected-Finance | L2 | Rejected-Finance Being not L1 | |
| 3 | L3₹91.1 L+₹19.5 L (27.3%)Rejected-Finance 34 10 37 1 GNANAPURAM DAYAS STREET VISAKHAPATNAM VISAKHAPATNAM ANDHRA PRADESH 530004 | VISAKHAPATANAM | ANDHRA PRADESH | 530004 | L3 | Rejected-Finance Being not L1 | |
| 4 | L4₹94.0 L+₹22.5 L (31.4%)Rejected-Finance | L4 | Rejected-Finance Being not L1 | |
| 5 | L5₹1.1 Cr+₹34.3 L (48.0%)Rejected-Finance | L5 | Rejected-Finance Being not L1 |
| Sl No | Description | Qty | Unit | sree karthika fabs L1 | aswitha engineering works L3 | S R CONSTRUCTIONS L2 | GLOBAL MARINE AND TECHNICAL SERVICES L5 | SPAAN Infratech L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Routine maintenance (chipping, cleaning, greasing and overhauling) for rod gearing arrangement (of different length with Dia between 25-45mm, head stock with bevel gears) of valves of variable sizes of caisson gates and associated accessories including universal joints and bushes with minor defect rectifications, if any (Standard/ Specification – SS 316, MS, EN 8 for bevel gear) all as specified and directed.
(a) Checking the rod gearing system from the gear box to the valves spindle to be checked every operation visually.
(b) All the knuckle joints of the rod gearing system shall be lubricated
(c) Visually checking the rod gearing system at every welding joints/knuckle joints any crack/bend/deflection to be rectified | 70 | Nos. | 22,500 ₹15,75,000 | 19,720.08 ₹13,80,405.6 | 21,000 ₹14,70,000 | 13,500 ₹9,45,000 Lowest | 21,090 ₹14,76,300 |
| 1.01(d) The meaning scale of the rod gearing system/pedestal to be verified the findings shall be rectified to measure the actual opening of the valve (e) Marine gears shall lubricated all bevel gear system. (f) The material (SS316/EN8) repaired for the rod gearing system knuckle shall be scope of the contractor. (Unit 01 Nos = Above scope for one rod gearing arrangement) Material and equipment’s required for undertaking the maintenance/ repairs is responsibility of the vendor. | ||||||||
| 2.00 | Visual inspection and INSITU maintenance / minor repairs (if any) for Sluice valves of Size NB 600 including joints, nut and bolts with washers, stuffing box, connecting pipes, rubber gasket, seals and associated fittings for the system (IS specifications). The Maintenance of the valves to include the under mentioned :-
(a) Check and rectifying the leakage through stuffing box/gland, body-demo, dome – stuffing box and side flange gaskets.
(b) Check and rectifying noise/vibrations while opening or closing the valve
(c) Check and rectifying condition of body seat/wedge seat ring faces scratches, dent marks, intactness
(d) Check and rectifying if may minor condition of spindle & spindle nut/yokes sleeve threads.
(e) Close by-pass valve disconnecting the extension year rod connection, Try to flush away the external object by opening & closing the valve & creating flow to flush it away. Open flanged joint to reach the object and remove it manually. | 2 | Nos | 24,500 ₹49,000 Lowest | 95,403.56 ₹1,90,807.12 | 50,000 ₹1,00,000 | 59,000 ₹1,18,000 | 96,660 ₹1,93,320 |
| 2.01(f) Replace the graphite gland packing rings. (g) Tighten the gland gradually and uniformly. (h) Replace the gland packing. (i) Tighten the joint fasteners gradually and uniformly body dome/dome stilting box gaskets. (j) Replace the nitrile rubber gaskets. (k) Re-tighten the flanged joint. (l) remove parallel/angular gap between valve and pipe flanges and rectify (m) Replace spindle nut, spindle also may be replaced if the thread are excessively worn-out or damaged (n) Disconnection the damnatory joint all these procedures requires the upstream and downstream piping and removal of the valve from the gate. Note:- Spares for items shall be measured and paid separately Unit 01 Nos = Above scope for one valve) | ||||||||
| 3.00 | All as per item No. 2.00 above, but for NB 300mm dia, valves. | 2 | Nos | 9,200 ₹18,400 Lowest | 47,702.16 ₹95,404.32 | 35,000 ₹70,000 | 52,000 ₹1,04,000 | 48,330 ₹96,660 |
| 4.00 | All as per item No. 2.00 above, but for NB 350mm dia valves. | 2 | Nos | 9,300 ₹18,600 Lowest | 62,446.16 ₹1,24,892.32 | 43,000 ₹86,000 | 52,000 ₹1,04,000 | 63,270 ₹1,26,540 |
| 5.00 | All as per item No. 2.00 above, but for NB 450mm dia, valves. | 1 | Nos | 15,400 ₹15,400 Lowest | 70,685.32 ₹70,685.32 | 50,000 ₹50,000 | 55,000 ₹55,000 | 71,615 ₹71,615 |
| 6.00 | All as per item No. 2.00 above, but for NB 250mm dia, valves. | 2 | Nos | 7,900 ₹15,800 Lowest | 29,488.76 ₹58,977.52 | 20,000 ₹40,000 | 36,000 ₹72,000 | 29,880 ₹59,760 |
| 7.00 | All as per item No. 2.00 above, but for NB 150mm dia, valves. | 2 | Nos | 6,500 ₹13,000 Lowest | 25,152.2 ₹50,304.4 | 18,000 ₹36,000 | 22,000 ₹44,000 | 25,480 ₹50,960 |
| 8.00 | All as per item No. 2.00 above, but for NB 80mm dia, valves. | 2 | Nos | 4,600 ₹9,200 Lowest | 12,575.72 ₹25,151.44 | 7,800 ₹15,600 | 18,000 ₹36,000 | 12,740 ₹25,480 |
Tender Value
₹1.2 Cr
EMD Value
₹2.0 L
Closing Date
18 Feb 2026, 6:00 pmClosed
GE (I) DM Visakhapatnam
GE (I) DM Visakhapatnam
REGULAR MAINTENANCE OF FLAP GATES AND CAISSON GATES OF VARUNA DRYDOCKS AT NAVAL DOCKYARD VISAKHAPATNAM UNDER GE (I) (DM) VISAKHAPATNAM
2026_MES_749514_1
8431/E8
Open Tender
Civil Works
Item Wise
270 days
Naval Dockyard Visakhapatnam
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
GE (I) DM VISAKHAPATNAM
₹2.0 L
Yes
24 Jun 2026
21 Jan 2026
20 Feb 2026
21 Jan 2026
18 Feb 2026
11 Feb 2026
22 Jan 2026 - 9 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Routine maintenance (chipping, cleaning, greasing and overhauling) for rod gearing arrangement (of different length with Dia between 25-45mm, head stock with bevel gears) of valves of variable sizes of caisson gates and associated accessories including universal joints and bushes with minor defect rectifications, if any (Standard/ Specification – SS 316, MS, EN 8 for bevel gear) all as specified and directed.
(a) Checking the rod gearing system from the gear box to the valves spindle to be checked every operation visually.
(b) All the knuckle joints of the rod gearing system shall be lubricated
(c) Visually checking the rod gearing system at every welding joints/knuckle joints any crack/bend/deflection to be rectified | 70 | Nos. | - | - |
| 1.01 | (d) The meaning scale of the rod gearing system/pedestal to be verified the findings shall be rectified to measure the actual opening of the valve
(e) Marine gears shall lubricated all bevel gear system.
(f) The material (SS316/EN8) repaired for the rod gearing system knuckle shall be scope of the contractor.
(Unit 01 Nos = Above scope for one rod gearing arrangement)
Material and equipment’s required for undertaking the maintenance/ repairs is responsibility of the vendor. | - | - | - | - |
| 2 | Visual inspection and INSITU maintenance / minor repairs (if any) for Sluice valves of Size NB 600 including joints, nut and bolts with washers, stuffing box, connecting pipes, rubber gasket, seals and associated fittings for the system (IS specifications). The Maintenance of the valves to include the under mentioned :-
(a) Check and rectifying the leakage through stuffing box/gland, body-demo, dome – stuffing box and side flange gaskets.
(b) Check and rectifying noise/vibrations while opening or closing the valve
(c) Check and rectifying condition of body seat/wedge seat ring faces scratches, dent marks, intactness
(d) Check and rectifying if may minor condition of spindle & spindle nut/yokes sleeve threads.
(e) Close by-pass valve disconnecting the extension year rod connection, Try to flush away the external object by opening & closing the valve & creating flow to flush it away. Open flanged joint to reach the object and remove it manually. | 2 | Nos | - | - |
| 2.01 | (f) Replace the graphite gland packing rings.
(g) Tighten the gland gradually and uniformly.
(h) Replace the gland packing.
(i) Tighten the joint fasteners gradually and uniformly body dome/dome stilting box gaskets.
(j) Replace the nitrile rubber gaskets.
(k) Re-tighten the flanged joint.
(l) remove parallel/angular gap between valve and pipe flanges and rectify
(m) Replace spindle nut, spindle also may be replaced if the thread are excessively worn-out or damaged
(n) Disconnection the damnatory joint all these procedures requires the upstream and downstream piping and removal of the valve from the gate.
Note:- Spares for items shall be measured and paid separately
Unit 01 Nos = Above scope for one valve) | - | - | - | - |
| 3 | All as per item No. 2.00 above, but for NB 300mm dia, valves. | 2 | Nos | - | - |
| 4 | All as per item No. 2.00 above, but for NB 350mm dia valves. | 2 | Nos | - | - |
| 5 | All as per item No. 2.00 above, but for NB 450mm dia, valves. | 1 | Nos | - | - |
| 6 | All as per item No. 2.00 above, but for NB 250mm dia, valves. | 2 | Nos | - | - |
| 7 | All as per item No. 2.00 above, but for NB 150mm dia, valves. | 2 | Nos | - | - |
| 8 | All as per item No. 2.00 above, but for NB 80mm dia, valves. | 2 | Nos | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
8431Tender.pdf
Tender Documents • 1.12 MB
BOQ_839409.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .