Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 LAccepted-AOC | ₹2.5 L | 1 | Accepted-AOC L1 |
| 2 | 2₹4.0 L+₹1.5 L (62.5%)Rejected-Finance | ₹4.0 L+₹1.5 L (62.5%) | 2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | UMRAZ ENTERPRISES L1 | YAZ ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00STAGE 40ft x 30ft | |||||
| 1.01 | DAY 1-STAGE 40ft x 30ft
Hire and labour for providing platform 1.5m height including steps with hand rails for climbing from two sides. strcuture made with 40 mm MS pipe truss work with both lines and tying with MS pipe and top covering with 18 mm thick plywood and overlaying carpet etc, as per directions. including all cost of erecting , conveyance and dismantling after function. | 108 | Sqm/day | 375 ₹40,500 Lowest | 400 ₹43,200 |
| 1.02 | DAY 2-STAGE 40ft x 30ft
Hire and labour for providing platform 1.5m height including steps with hand rails for climbing from two sides. strcuture made with 40 mm MS pipe truss work with both lines and tying with MS pipe and top covering with 18 mm thick plywood and overlaying carpet etc, as per directions. including all cost of erecting , conveyance and dismantling after function. | 108 | Sqm/day | 200 ₹21,600 Lowest | 400 ₹43,200 |
| 1.03 | DAY 3-STAGE 40ft x 30ft
Hire and labour for providing platform 1.5m height including steps with hand rails for climbing from two sides. strcuture made with 40 mm MS pipe truss work with both lines and tying with MS pipe and top covering with 18 mm thick plywood and overlaying carpet etc, as per directions. including all cost of erecting , conveyance and dismantling after function. | 108 | Sqm/day | 200 ₹21,600 Lowest | 400 ₹43,200 |
| 1.04 | DAY 4-STAGE 40ft x 30ft
Hire and labour for providing platform 1.5m height including steps with hand rails for climbing from two sides. strcuture made with 40 mm MS pipe truss work with both lines and tying with MS pipe and top covering with 18 mm thick plywood and overlaying carpet etc, as per directions. including all cost of erecting , conveyance and dismantling after function. | 108 | Sqm/day | 150 ₹16,200 Lowest | 400 ₹43,200 |
| 1.05 | DAY 5-STAGE 40ft x 30ft
Hire and labour for providing platform 1.5m height including steps with hand rails for climbing from two sides. strcuture made with 40 mm MS pipe truss work with both lines and tying with MS pipe and top covering with 18 mm thick plywood and overlaying carpet etc, as per directions. including all cost of erecting , conveyance and dismantling after function. | 108 | Sqm/day | 150 ₹16,200 Lowest | 400 ₹43,200 |
| 2.00CANOPY TENT- | |||||
| 2.01 | DAY 1-CANOPY TENT-
Hire and labour for providing and errecting hipped panthal white coloured for pavilions, stalls and counters as and where required to cover audience including all hire charges etc. complete | 36 | Sqm/day | 75 ₹2,700 Lowest | 85 ₹3,060 |
| 2.02 | DAY 2-CANOPY TENT-
Hire and labour for providing and errecting hipped panthal white coloured for pavilions, stalls and counters as and where required to cover audience including all hire charges etc. complete | 36 | Sqm/day | 75 ₹2,700 Lowest | 85 ₹3,060 |
| 2.03 | DAY 3-CANOPY TENT-
Hire and labour for providing and errecting hipped panthal white coloured for pavilions, stalls and counters as and where required to cover audience including all hire charges etc. complete | 36 | Sqm/day | 75 ₹2,700 Lowest | 85 ₹3,060 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
19 Aug 2026, 5:00 pmClosed
PROJECT MANAGER
CIVIL STATION KOZHIKODE
CIVIL WORKS AT BHATT ROAD BEACH
2026_DNKKD_864909_1
KDNK/P1104/2026
Open Tender
Civil Works - Others
Item Rate
7 days
BHATT ROAD BEACH
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,800
₹10,000
RDO OFFICE KOZHIKODE
24 Aug 2026
10 Aug 2026
20 Aug 2026
10 Aug 2026
19 Aug 2026
10 Aug 2026
10 Aug 2026 - 19 Aug 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1STAGE 40ft x 30ft | |||||
| 1.01 | DAY 1-STAGE 40ft x 30ft
Hire and labour for providing platform 1.5m height including steps with hand rails for climbing from two sides. strcuture made with 40 mm MS pipe truss work with both lines and tying with MS pipe and top covering with 18 mm thick plywood and overlaying carpet etc, as per directions. including all cost of erecting , conveyance and dismantling after function. | - | Sqm/day | 375 | - |
| 1.02 | DAY 2-STAGE 40ft x 30ft
Hire and labour for providing platform 1.5m height including steps with hand rails for climbing from two sides. strcuture made with 40 mm MS pipe truss work with both lines and tying with MS pipe and top covering with 18 mm thick plywood and overlaying carpet etc, as per directions. including all cost of erecting , conveyance and dismantling after function. | - | Sqm/day | 375 | - |
| 1.03 | DAY 3-STAGE 40ft x 30ft
Hire and labour for providing platform 1.5m height including steps with hand rails for climbing from two sides. strcuture made with 40 mm MS pipe truss work with both lines and tying with MS pipe and top covering with 18 mm thick plywood and overlaying carpet etc, as per directions. including all cost of erecting , conveyance and dismantling after function. | - | Sqm/day | 375 | - |
| 1.04 | DAY 4-STAGE 40ft x 30ft
Hire and labour for providing platform 1.5m height including steps with hand rails for climbing from two sides. strcuture made with 40 mm MS pipe truss work with both lines and tying with MS pipe and top covering with 18 mm thick plywood and overlaying carpet etc, as per directions. including all cost of erecting , conveyance and dismantling after function. | - | Sqm/day | 375 | - |
| 1.05 | DAY 5-STAGE 40ft x 30ft
Hire and labour for providing platform 1.5m height including steps with hand rails for climbing from two sides. strcuture made with 40 mm MS pipe truss work with both lines and tying with MS pipe and top covering with 18 mm thick plywood and overlaying carpet etc, as per directions. including all cost of erecting , conveyance and dismantling after function. | - | Sqm/day | 375 | - |
| 2CANOPY TENT- | |||||
| 2.01 | DAY 1-CANOPY TENT-
Hire and labour for providing and errecting hipped panthal white coloured for pavilions, stalls and counters as and where required to cover audience including all hire charges etc. complete | - | Sqm/day | 75 | - |
| 2.02 | DAY 2-CANOPY TENT-
Hire and labour for providing and errecting hipped panthal white coloured for pavilions, stalls and counters as and where required to cover audience including all hire charges etc. complete | - | Sqm/day | 75 | - |
| 2.03 | DAY 3-CANOPY TENT-
Hire and labour for providing and errecting hipped panthal white coloured for pavilions, stalls and counters as and where required to cover audience including all hire charges etc. complete | - | Sqm/day | 75 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1463517.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
Tendernotice_2.pdf
PDF • 0.18 MB
PA.pdf
Tender Documents • 0.09 MB
BOQ_1463517.xls
BOQ • 0.35 MB
EXTEN.pdf
PDF • 0.11 MB
TIME.pdf
PDF • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .