| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.4 LAccepted-AOC | L1 | Accepted-AOC Ist Lowest | |
| 2 | Rejected-Technical | - | Rejected-Technical IInd Lowest |
Tender Value
Refer Docs
Closing Date
27 Aug 2021, 5:00 pmClosed
PM Construction Unit UKPJN Haldwani
PM Construction Unit UKPJN R.T.O. Road Near Vasundhra Banquet Hall Haldwani
CONSTRUCTION OF PROPOSED BOUNDARY WALL OF KABRISTAN AT SISHMAHAL KATHGODAM
2021_MDPEY_35320_1
1018/Adesh-4/100 Dt. 12.08.2021
Open Tender
Civil Works
Item Rate
120 days
Kabristan at Shishmahal Kathgodam
Please refer Tender Document
2 documents required · 2 mandatory
₹2,360
PM Construction Unit UKPJN Haldwani
Exempted
PM Construction Unit UKPJN Haldwani
18 Oct 2021
13 Aug 2021
3 Sept 2021
13 Aug 2021
27 Aug 2021
20 Aug 2021
17 Aug 2021
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete .Thermo-Mechanically Treated bars of grade Fe-500D or more (Brand Tata/ RINL/SAIL/SEL/JINDAL/SHYAM )
Centering and shuttering including strutting, propping etc. and removal ofform for : Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal ofform for : Columns, Pillars, Piers, Abutments, Posts and Struts
Centering and shuttering including strutting, propping etc. and removal ofform for : Lintels, beams, plinth beams, girders, bressumers and cantilevers
Random ruble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand)
12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand)
15 mm cement plaster on the rough side of single or half brick wall of mix : 1:6 (1 cement: 6 fine sand)
Finishing walls with textured exterion paint of required shade : New work (Two or mere coats applied @ 3.28 ltr/10 sqm) over and including priming coat of exterior primer applied @ 2.20kg/ 10 sqm
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets,
DANISH ALI PASHA
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_41680.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .