Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹21.4 LAccepted-AOC | ₹21.4 L Quoted ₹21.5 L | 1 | Accepted-AOC Quoted amount being lowest. |
| 2 | 2₹23.6 L+₹2.1 L (9.99%)Rejected-Finance | ₹23.6 L+₹2.1 L (9.99%) | 2 | Rejected-Finance Quoted amount is not the lowest and reasonable. |
| 3 | 3₹24.2 L+₹2.7 L (12.6%)Rejected-Finance | ₹24.2 L+₹2.7 L (12.6%) | 3 | Rejected-Finance Quoted amount is not the lowest and reasonable. |
| 4 | 4₹25.2 L+₹3.8 L (17.5%)Rejected-Finance | ₹25.2 L+₹3.8 L (17.5%) | 4 | Rejected-Finance Quoted amount is not the lowest and reasonable. |
| 5 | 5₹25.4 L+₹3.9 L (18.3%)Rejected-Finance GALI NO 4 GAUSHALA ROAD VIKASH NAGAR RAMGARH CANTT RAMGARH JHARKHAND 829122 | RAMGARH CANTT | RAMGARH | JHARKHAND | 829122 | ₹25.4 L+₹3.9 L (18.3%) | 5 | Rejected-Finance Quoted amount is not the lowest and reasonable. |
| Sl No | Description | Qty | Unit | M/s Ray construction L5 | M/s friend enterprises L3 | M/S DEEPAK KUMAR SINHA L10 | M/S KAMLESHWAR SINGH L7 | M/S Bhushan Kumar Jain L4 | M/S Kunwar Construction L6 | upadhyay engineers and consultant L11 | ARBIND KUMAR SINGH L1 | simplex infra project L9 | M/S PARAS NATH SINGH L8 | M/s Popatlal A Rathod L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L for preparation of old decorated surfaces of walls including cornices, by brooming down or steel wire brushing to remove dust, dirt and loose scales of lime wash and other foreign material, scrapping down, smoke soot, moulds, moss and efflorescent salts, trading oil and greasy spots etc including filling the cracks and depressions with putty and applying one coat of white wash on wall surface at any height complete all as specified and directed. Note :Quoted rate shall be deemed to be included for work in building/structure( like stair case, mummty ,Over head tank(OHT),sump etc of any height including necessary scaffolding ) | 6,430 | Sqm | 19 ₹1,22,170 | 21 ₹1,35,030 | 22 ₹1,41,460 | 20 ₹1,28,600 | 23 ₹1,47,890 | 22 ₹1,41,460 | 25 ₹1,60,750 | 9 ₹57,870 Lowest | 20 ₹1,28,600 | 15 ₹96,450 | 17 ₹1,09,310 |
| 2.00 | All as per items No 1 here in before but two coat of white (lime) wash as required complete all as specified and directed. | 450 | Sqm | 24 ₹10,800 | 35 ₹15,750 | 30 ₹13,500 | 23 ₹10,350 | 28 ₹12,600 | 30 ₹13,500 | 32 ₹14,400 | 19 ₹8,550 Lowest | 30 ₹13,500 | 32 ₹14,400 | 23 ₹10,350 |
| 3.00 | M&L for preparation of old decorated surfaces of wall including cornices, by brooming down or steel wire brushing to remove dust, dirt and loose scales of lime wash and other foreign material, scrapping down, smoke soot, moulds, moss and efflorescent salts, trading oil and greasy spots etc including filling the cracks and depressions with putty and applying one coat of colour wash on wall surface at any height complete all as specified and directed. Note :Quoted rate shall be deemed to be included for work in building/structure( like stair case, mummty ,Over head tank(OHT),sump etc of any height including necessary scaffolding ) | 4,438 | Sqm | 21 ₹93,198 | 26 ₹1,15,388 | 25 ₹1,10,950 | 25 ₹1,10,950 | 28 ₹1,24,264 | 25 ₹1,10,950 | 24 ₹1,06,512 | 9 ₹39,942 Lowest | 30 ₹1,33,140 | 18 ₹79,884 | 19 ₹84,322 |
| 4.00 | All as per items No 3 here in before two coat of colour (lime) wash complete all as specified and directed. | 550 | Sqm | 25 ₹13,750 | 25 ₹13,750 | 30 ₹16,500 | 24 ₹13,200 | 32 ₹17,600 | 30 ₹16,500 | 32 ₹17,600 | 19 ₹10,450 Lowest | 30 ₹16,500 | 32 ₹17,600 | 24 ₹13,200 |
| 5.00 | M&L for preparation of old decorated surfaces of Ceiling including cornices, by brooming down or steel wire brushing to remove dust, dirt and loose scales of lime wash and other foreign material, scrapping down, smoke soot, moulds, moss and efflorescent salts, trading oil and greasy spots etc including filling the cracks and depressions with putty and applying one coat of colour wash on ceiling surface at any height complete all as specified and directed. Note :Quoted rate shall be deemed to be included for work in building/structure( like stair case, mummty ,Over head tank(OHT),sump etc of any height including necessary scaffolding ) | 1,850 | Sqm | 22 ₹40,700 | 28 ₹51,800 | 30 ₹55,500 | 25 ₹46,250 | 28 ₹51,800 | 30 ₹55,500 | 32 ₹59,200 | 19 ₹35,150 Lowest | 30 ₹55,500 | 32 ₹59,200 | 20 ₹37,000 |
| 6.00 | Taking down cement plaster of any description including racking out joints hacking for key and scrubbing down with water including removing/disposed off spoil materials outside of Denence land complete all as specified & directed. | 405 | Sqm | 90 ₹36,450 | 80 ₹32,400 | 85 ₹34,425 | 55 ₹22,275 | 75 ₹30,375 | 85 ₹34,425 | 90 ₹36,450 | 29 ₹11,745 Lowest | 40 ₹16,200 | 90 ₹36,450 | 85 ₹34,425 |
| 7.00 | M&L for 15mm thick rendering face of brick/stone masonry walls/on chajjas/ lintel etc.,in CM 1:4 finished even and fair (without using exrtra cement) complete all as specified and directed. | 210 | Sqm | 330 ₹69,300 | 320 ₹67,200 | 330 ₹69,300 | 310 ₹65,100 | 335 ₹70,350 | 330 ₹69,300 | 350 ₹73,500 | 169 ₹35,490 Lowest | 200 ₹42,000 | 340 ₹71,400 | 300 ₹63,000 |
| 8.00 | M&L for 15mm thick rendering face of brick/stone masonry walls/on chajjas/ lintel etc.,in CM 1:6 finished even and fair (without using exrtra cement) complete all as specified and directed. | 95 | Sqm | 325 ₹30,875 | 310 ₹29,450 | 330 ₹31,350 | 300 ₹28,500 | 320 ₹30,400 | 330 ₹31,350 | 350 ₹33,250 | 149 ₹14,155 Lowest | 260 ₹24,700 | 340 ₹32,300 | 300 ₹28,500 |
| 9.00 | M&L for 5mm thick rendering face of brick/stone masonry on surface of ceiling etc.,in CM 1:3 finished even and fair (without using exrtra cement) complete all as specified and directed. | 80 | Sqm | 250 ₹20,000 | 250 ₹20,000 | 280 ₹22,400 | 290 ₹23,200 | 275 ₹22,000 | 280 ₹22,400 | 300 ₹24,000 | 99 ₹7,920 Lowest | 200 ₹16,000 | 290 ₹23,200 | 220 ₹17,600 |
| 10.00 | M&L preparation of newly/previous untreated plastered surfaces of walls/Chajja/lintel and applying three coats of white wash complete all as specified & directed. | 90 | Sqm | 27 ₹2,430 | 25 ₹2,250 Lowest | 30 ₹2,700 | 29 ₹2,610 | 40 ₹3,600 | 30 ₹2,700 | 32 ₹2,880 | 39 ₹3,510 | 30 ₹2,700 | 40 ₹3,600 | 26 ₹2,340 |
Tender Value
₹24 L
EMD Value
₹48,000
Closing Date
31 Jul 2026, 6:00 pmClosed
GE RAMGARH CANTT
RAMGARH CANTT
PERIODICAL SERVICES TO OTM AND MD ACCN AND REPAIR TO ROOF TREATMENT SUNKEN FLOOR, REPLACEMENT OF INTERNAL WATER SUPPLY PIPE LINE AND SANITARY FITTINGS IN CERTAIN BLDG AT DAD IN RAMGARH CANTT
2026_MES_777760_1
8300/3448/E8
Open Tender
Civil Works
Item Rate
180 days
RAMGARH CANTT
AS PER TENDER DOCUMENTS
7 documents required · 7 mandatory
₹500
GE RAMGARH CANTT
₹48,000
Yes
17 Sept 2026
10 Jul 2026
7 Aug 2026
10 Jul 2026
31 Jul 2026
24 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for preparation of old decorated surfaces of walls including cornices, by brooming down or steel wire brushing to remove dust, dirt and loose scales of lime wash and other foreign material, scrapping down, smoke soot, moulds, moss and efflorescent salts, trading oil and greasy spots etc including filling the cracks and depressions with putty and applying one coat of white wash on wall surface at any height complete all as specified and directed. Note :Quoted rate shall be deemed to be included for work in building/structure( like stair case, mummty ,Over head tank(OHT),sump etc of any height including necessary scaffolding ) | 6,430 | Sqm | 100 | ₹6,43,000 |
| 2 | All as per items No 1 here in before but two coat of white (lime) wash as required complete all as specified and directed. | 450 | Sqm | 100 | ₹45,000 |
| 3 | M&L for preparation of old decorated surfaces of wall including cornices, by brooming down or steel wire brushing to remove dust, dirt and loose scales of lime wash and other foreign material, scrapping down, smoke soot, moulds, moss and efflorescent salts, trading oil and greasy spots etc including filling the cracks and depressions with putty and applying one coat of colour wash on wall surface at any height complete all as specified and directed. Note :Quoted rate shall be deemed to be included for work in building/structure( like stair case, mummty ,Over head tank(OHT),sump etc of any height including necessary scaffolding ) | 4,438 | Sqm | 10 | ₹44,380 |
| 4 | All as per items No 3 here in before two coat of colour (lime) wash complete all as specified and directed. | 550 | Sqm | 10 | ₹5,500 |
| 5 | M&L for preparation of old decorated surfaces of Ceiling including cornices, by brooming down or steel wire brushing to remove dust, dirt and loose scales of lime wash and other foreign material, scrapping down, smoke soot, moulds, moss and efflorescent salts, trading oil and greasy spots etc including filling the cracks and depressions with putty and applying one coat of colour wash on ceiling surface at any height complete all as specified and directed. Note :Quoted rate shall be deemed to be included for work in building/structure( like stair case, mummty ,Over head tank(OHT),sump etc of any height including necessary scaffolding ) | 1,850 | Sqm | 10 | ₹18,500 |
| 6 | Taking down cement plaster on wall of any description including racking out joints hacking for key and scrubbing down with water including removing/disposed off spoil materials outside of Denence land complete all as specified & directed. | 405 | Sqm | 10 | ₹4,050 |
| 7 | M&L for 15mm thick rendering face of brick/stone masonry walls/on chajjas/ lintel etc.,in CM 1:4 finished even and fair (without using exrtra cement) complete all as specified and directed. | 210 | Sqm | 10 | ₹2,100 |
| 8 | M&L for 15mm thick rendering face of brick/stone masonry walls/on chajjas/ lintel etc.,in CM 1:6 finished even and fair (without using exrtra cement) complete all as specified and directed. | 95 | Sqm | 10 | ₹950 |
| 9 | M&L for 5mm thick rendering face of brick/stone masonry on surface of ceiling etc.,in CM 1:4 finished even and fair (without using exrtra cement) complete all as specified and directed. | 80 | Sqm | 10 | ₹800 |
| 10 | M&L preparation of newly/previous untreated plastered surfaces of walls/Chajja/lintel and applying three coats of white wash complete all as specified & directed. | 90 | Sqm | 10 | ₹900 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
tender3448.pdf
Tender Documents • 2.14 MB
BOQ_871057.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .