| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.7 LAccepted-AOC | L1 | Accepted-AOC AGREEMENT EXECUTED | |
| 2 | L2₹16.9 L+₹21,987.37 (1.32%)Rejected-Finance | L2 | Rejected-Finance L1 AGREMENT EXECUTED |
Tender Value
₹15.2 L
EMD Value
₹37,990
Closing Date
16 Mar 2023, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
PWD ROADS DIVISION IDUKKI
GENERAL RM 2022-23 CLUSTER II ONE YEAR RC ZONE XV FOR VARIOUS PWD ROADS UNDER PWD ROADS SECTION THODUPUZHA IN IDUKKI DIST 2 ROAD STRECTHES FOR A LENGTH OF 8.05 KM
2023_PWD_564113_1
137/EE/2022-23
Open Tender
Civil Works - Roads
Item Rate
365 days
Thodupuzha
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹37,990
Yes
4 Apr 2023
6 Mar 2023
18 Mar 2023
6 Mar 2023
16 Mar 2023
6 Mar 2023
Amount
Apendix A: Reactave maintenance works
3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means
4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method
55.22:Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete.
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
12.8.A:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M15 ( Without formwork)
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD243665/2022-2023:Providing laying and rolling of close graded premix surfacing material of 20mm thickness composed of 11.2mm to .9mm(Type A) or 13.2 mm to .9mm (Type B) aggregate using penetration grade bitumen to required line ,grade and level to serve as wearing course on previously prepared base.including mixing in asuitable plant laying and rolling with afree wheel 8-10 kN static roller and finishing to required level and grades as per Technical specification
OD241270/2022-2023:Providing and fixing of DLP board for Running contract work with non -retro reflectorised vinyl sign with 1 years warranty manufactured vinyl printed sheeting fixed over aluminium sheeting 2 mm thick/aluminium composit material sheeting 4 mm thick with area not exceeding 0.90 sqm,with suitable back supporting frame of MS angle 40*40*6 and supported on GI pipe pole 50 mm NB conforming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm*45 cm*60 cm,60 cm below ground level including painting all exposed surafce with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc
Apendix B -Pre Monsoon works
3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
OD242194/2022-2023:Supply Granular material at site
2.3.1.B:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of thorny jungle -By Manual Means
OD22133/2022-2023:Engaging coolie
OD22134/2022-2023:Engaging Small Tipper for removing slipped earth and other unusable materials from the PWD road for urgent opening of Traffic, including fuel charge and all other expenditures etc. complete
OD22135/2022-2023:Engaging JCB including fuel charges, Bata of driver and other all expenditure including etc. complete
OD123559/2022-2023:Supplying instant road repair mix to roads section Thodupuzha in packets which contains 25kg of compounds
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
OD249466/2022-2023:Filling up potholes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a priming coat of emulsion(RS1) using 36mm broken stone and compacting with power roller to get compact surface.
Appendix C: Protective/Preventive maintenance works
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD123560/2022-2023:Providing laying and rolling of close graded premix surfacing material of 20mm thickness composed of 11.2mm to .9mm(Type A) or 13.2 mm to .9mm (Type B) aggregate using penetration grade bitumen to required line ,grade and level to serve as wearing course on previously prepared base.including mixing in asuitable plant laying and rolling with afree wheel 8-10 kN static roller and finishing to required level and grades as per Technical specification
10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete For grading II- 13 mm (Nominal size) Material
OD22136/2022-2023:Engaging labour for clearing and removing all the debris and other wastes from the drain and culvert by manual method and deposit the debris within a distance of 500m as directed by dept.
14.16:Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm.
8.4.2:Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 7years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting vide clause 801.3.3 fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. 60 cm equilateral triangle
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
12.8.A:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications<br> PCC Grade M15 ( Without formwork) <br>
10.6:Filling of crack using slow - curing bitumen emulsion and applying crusher dust in case crack are wider than 3mm.
5.12.a:Providing and applying low viscosity bitumen emulsion (SS) for sealing cracks less than 3 mm wide or incipient fretting or disintegration in an existing bituminous surfacing. Fog Spray
Appendix D:Emergency items
OD243301/2022-2023:Engaging excavator (JCB) for various purposes
OD243302/2022-2023:Engaging Small Tipper for removing slipped earth and other unusable materials from the PWD road for urgent opening of Traffic, including fuel charge and all other expenditures etc. complete
OD243303/2022-2023:Engaging coolie
OD243304/2022-2023:Conduction and reporting routine inspection for the entire length of the project road at a frequency of 7 days through out the agreement period of the running contract as directed by the deptl. officers at site. Additional RI may be required in response to reports, or complaints from police, other authorities and the public as result of major incidents, typhoon or flooding damages, etc, and are not measurable/payable. A proportion of RI should be carried out either during or immediately following a period of wet weather.
Rasheed and Co
Bidder Name
NISHAD K.A
Rasheed and Co
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_831774.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .