| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.7 LAccepted-AOC | L1 | Accepted-AOC Quoted L1 rate | |
| 2 | L2₹53.1 L+₹2.4 L (4.75%)Rejected-AOC | L2 | Rejected-AOC Quoted L2 rate |
Tender Value
₹51.3 L
EMD Value
₹52,000
Closing Date
31 Jan 2024, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
Strengthening 1 BT 1 CC 1 Paver Block road in Nallampillai Panchayat in Vaiyampatti Block in Tiruchirappalli District under IA Fund 2023-24 Package No.41
2024_RDTN_408101_41
DIPR/80/Tender/2024 Dated 09.01.2024
Open Tender
Civil Works - Roads
Item Rate
180 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹52,000
DRDA Tiruchirappalli
15 Feb 2024
15 Jan 2024
31 Jan 2024
15 Jan 2024
31 Jan 2024
15 Jan 2024
18 Jan 2024
Amount
Strengthening to the T.Uadayapatty to N.Pudur Road (via) Ramagoundanpatty Road in Nallampillai Panchayat. R-98 (VPR) Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201 in all etc complete Km 0/0-1/5
Picking the existing mettaled surface and sectioning including all labour charges etc, complete. KM 0/0 - 0/600
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A Km 0/0-1/5
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Km 0/0-1/5
Providing and laying Tack coat over WMM/WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., Km 0/0-1/5
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM/WBM surface preparatory to another bituminous construction over it. Km 0/0-1/5
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., i charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 Km 0/0-1/5
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for side berms KM 0/0-1/0
Repairs of causeway Ch at 515-530m Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Provision for Barricade ch 990
Supplying and fixing Name board Logo Board including painting and lettering as directed by the departmental officers etc., complete
Supplying and fixing Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete
Supplying and fixing Kilometer Metre stones including painting and lettering as directed by the departmental officers etc., complete
Provision For Photo Charges
Providing Paver Block Road At AD Colony East Street In NallampillaiPanchayat. Earth work excavation and depositing on bank with all lead and lift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, stoneyearth mixed wilht 50% fair mixed boulders, hard gravellyetc except sand and roc requiringblastingwith all incidental charges etc., complete for foundation.
Sand Filling in foundation and basement with sand including cost and conveyanceof sand and all labour charges for filling ,tamping ramming etc., complete.
Cement concrete in C M 1:4: 8 mix using 40mm ISS HBG metal includingcost and conveyanceof all materials to siteand labour charges, cement which will be supplied by dept shoringshutteringbalingout water etc., complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing
CC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site excluding cost and fabrication of steel with all labour charges for laying mixing concrete curing compacting for labour with centering arrangement all including etc.,
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and Laying of Inter Blocking Concrete (Surface Textured) Block pavements having thickness 60mm and compacted over a thin bedding sand layer of 25mm thickness and joints shall be filled by fine sand of specified grading as per table 1500.6 of Specification of Rural roads 2014 and Technical specification clause 1504. (Data for 225.00 Sqm) 60MM thick Paver Block
Provision for Name Board Charges
Provision For Photo Charges
Providing Cement Concrete Road @ Nallampillai Vadakutheru in Nallampillai Panchayat. Earth work excavation and depositing on bank with all lead and lift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, stoneyearth mixed wilht 50% fair mixed boulders, hard gravellyetc except sand and roc requiringblastingwith all incidental charges etc., complete for foundation.
Sand Filling in foundation and basement with sand including cost and conveyanceof sand and all labour charges for filling ,tamping ramming etc., complete.
Cement concrete in C M 1:4: 8 mix using 40mm ISS HBG metal includingcost and conveyanceof all materials to siteand labour charges, cement which will be supplied by dept shoringshutteringbalingout water etc., complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing
CC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site excluding cost and fabrication of steel with all labour charges for laying mixing concrete curing compacting for labour with centering arrangement all including etc.,
Provision for Bituman Pand
Provision for Name Board Charges
Provision For Photo Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
PANDIYAN K
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .