Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.3 LAccepted-Finance | ₹24.3 L | L1 | Accepted-Finance L1 |
| 2 | L2₹24.5 LAccepted-Finance MOH SHER MOHAMMAD PILIBHIT | PILIBHIT | UTTAR PRADESH | 262001 | ₹24.5 L | L2 | Accepted-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
2 Jan 2026, 2:00 pmClosed
Superintending Engineer
SE ECTC SLDC Campus UPPTCL, Lucknow
Construction of Store Room Building at 132 kV S/S Kadipur, Sultanpur
2025_UPCTL_1096114_1
73/ECTC(L)/2025-26
Open Tender
Civil Works
60 days
SE ECTC SLDC Campus UPPTCL, Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
Superintending Engineer, E.C.T.C. Lucknow
₹50,000
21 Feb 2026
4 Dec 2025
3 Jan 2026
4 Dec 2025
2 Jan 2026
4 Dec 2025
Bill Of Quantity
Construction of Store Room Building at 132kV S/S Kadipur, Sultanpur.(SOR-05/24) Group-5
Centering and shuttering including strutting, propping etc. and removal of form for
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work
Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :
ar switches in recess etc as required. 12 Module (200mmX150mm)
Total=
Conditions
The quantities in BOQ are tentative and may vary to any extent or deleted during execution as per actual approved lay out plan & site condition.
All civil work shall be executed according to the approved drawings of UPPTCL.
Pozzlona Portland cement confirming to IS 1489 (Part 1) 1991 of approved quality like ACC,Ultra-Tech, Birla or equi. Shall only be used.
Overweight steel section within tolerance shall be measured at standard weight and underweight steel section within tolerance shall be measured at actual weight.
In case any change in Bill of Quantity is suggested by higher authority that will be binding on the contractor.
Labor Cess, Royalty and all other taxs will be the liability of the firm/contractor, only GST will be paid by the department.
The firm should observe the work site before participating in the tender.
All work will be done according to UPPWD/UPPTCL specification or as per direction by the Engineer Incharge.
Test of all the construction materials shall be done by the contractor at their own cost from the lab approved by NABL as per direction Engineer Incharege .In case of unsatisfactory test result the dismanteling and reconstruction of structure shall be done by the contractor at their own cost.
During the work, the entire responsibility of protecting the human power (labor, mason etc.) appointed at the construction site will be of the firm/contractor and the entire responsibility of any untoward incident will be of the firm/contractor.
For the construction JCB Machine etc will be taken to switch yard only with the written permission of the related JE (Civil)/SDO (Civil). In case of any accident the entire responsibility of the damage will be of the Contractor.
Dismantling of Brick works the material shall be recoverd 60% as bricks and 30% as Brick Bats that material shall be property of the contractor recovered at prevailing/ pertaining SOR.
The amount of scrap steel recovered from dismantling shall be issued to contractor/firm at the rate1/3rd of rates in prevailing/ pertaining SOR.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.56 MB
Tendernotice_2.pdf
PDF • 0.59 MB
BOQ_2017678.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid