| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC DBC ROAD JALPAIGURI 735101 WEST BENGAL INDIA | JALPAIGURI | JALPAIGURI | WEST BENGAL | 735101 | ₹2.2 Cr Quoted ₹6.6 Cr | L1 | Accepted-AOC 1ST LOWEST |
| 2 | L1₹2.2 CrAccepted-AOC ASHOKE NAGAR JALPAIGURI | JALPAIGURI | JALPAIGURI | WEST BENGAL | ₹2.2 Cr Quoted ₹6.6 Cr | L1 | Accepted-AOC 1ST LOWEST |
| 3 | L1₹2.2 CrAccepted-AOC PANDAPARA JALPAIGURI | ₹2.2 Cr Quoted ₹6.6 Cr | L1 | Accepted-AOC 1ST LOWEST |
| 4 | L2₹6.7 Cr+₹4.5 L (0.68%)Rejected-Finance DBC ROAD JALPAIGURI 735101 | JALPAIGURI | WEST BENGAL | 735101 | ₹6.7 Cr+₹4.5 L (0.68%) | L2 | Rejected-Finance MORE THAN 1ST LOWEST |
| 5 | L3₹6.8 Cr+₹13.4 L (2.02%)Rejected-Finance | ₹6.8 Cr+₹13.4 L (2.02%) | L3 | Rejected-Finance MORE THAN 1ST LOWEST |
Tender Value
₹6.7 Cr
EMD Value
₹10 L
Closing Date
15 Jan 2026, 10:00 amClosed
SE,CTU
Central Tender Unit Jalasampad Bhawan, 8thFloor, Salt Lake, Kolkata-700091
Improvement of New Changmari-Premganj Embankment along left bank of river Teesta from Ch. 0.0 KM to Ch. 2.10 KM (length 2100 M) within Block Kranti, PS Malbazar, Dist. Jalpaiguri
2025_IWD_977950_2
WBIW/CTU/CE(North East) /e-NIT- 16 (e)/ 2025-26
Open Tender
CIVIL WORKS
Percentage
180 days
Kranti
Please refer Tender documents.
6 documents required · 6 mandatory
₹10 L
Yes
Central Tender Unit Jalasampad Bhawan, 8thFloor, S
16 Sept 2026
24 Dec 2025
16 Jan 2026
24 Dec 2025
15 Jan 2026
24 Dec 2025
29 Dec 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Quarrying, Carrying, & Supplying stone Boulders / Shingles etc. from quarry site selected by the Engineer-in-charge to the site of work including cost of materials,loading unloading and carriage including all incidental charges like royalty and Labour charges for laying boulder in apron or within wire netting of sausage for slope pitching includingd all lifts & dressing the exposed faces etc. complete as per direction of the Engineer-in-charge. complete as per direction of the engineer-in -charge (Quarry bed belongs to BL & LRO Deptt Govt. of W.B) {N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 178.33 per Cum (b) For Non-Forest area Royalty : Rs. 106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other chargeswherever applicable, but excluding GST) will be deducted from the bills of works . }
Boulder above 30Kg -60% , 20 kg - 30% and 10 kg- 10%. | 29,776.68 | Cu.m | 1,301.97 | ₹3,87,68,344.06 |
| 2 | Quarrying, Carrying, & Supplying stone Boulders / Shingles etc. from quarry site selected by the Engineer-in-charge to the site of work including cost of materials,loading unloading and carriage including all incidental charges like royalty and Labour charges for laying boulder/ shingles in apron or within wire netting of sausage for slope pitching including carriage upto 30 metre and all lifts & dressing the exposed faces etc. complete as per direction of the Engineer-in-charge. complete as per direction of the engineer-in -charge (Quarry bed belongs to BL & LRO Deptt. Govt. of W.B)
{N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 178.33 per Cum (b) For Non-Forest area Royalty : Rs. 106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other chargeswherever applicable, but excluding GST) will be deducted from the bills of works . }
Boulder for Deflector. (Boulder above 20 kg. each) | 2,208.2 | Cu.m | 1,272.56 | ₹28,10,066.99 |
| 3 | Quarrying, Carrying, Supplying stone boulders from the Engineer-In – Charge selected quarrying site to the site of work including cost of materials loading , unloading, and carriage including all incidental charges like royalty Labour charges for bouIder pitching on top and slope by placing required boulders (each weighing 25 Kg. and above within lead of 100 metres and all lifts) including filling the interstices with fragments as required, preparing sub-grade by cutting or filling the earth on slope upto 7.5 cm. depth, watering and ramming where necessary complete as per direction of the Engineer-in-charge. Over Jhama Khoa / metal filter/ Geo-textile filter.etc complete as per direction of the Engineer – in Charge ,for slope pitching. ( Quarry bed belongs to BL & LRO Deptt area) {N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 178.33 per Cum (b) For Non-Forest area Royalty : Rs. 106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amoun t due towards Royalty( including other chargeswherever applicable, but excluding GST) will be deducted from the bills of works . }
c) Boulder above 20 kg. each. | 3,676.96 | Cu.m | 1,589.58 | ₹58,44,822.08 |
| 4 | Supply of G.I wire netting of different mesh and made with different SWG G I wire at site as per direction of the Engineer-in-charge.
Mesh size 150 mm x 150 mm with 10 SWG wire | 9,015.55 | Sqm | 95.34 | ₹8,59,542.54 |
| 5 | Quarrying, Carrying ,Supplying Shingles from the
Engineer-in-Charge selected quarrying site to the site of work including cost of materials loading. Unloading ,stacking and carriage and including all incidental charges like Royalty and Labour charges for laying boulder/ shingles in apron or within wire netting of sausage for slope Pitching including carriage up to 30metre and all lifts & dressing the Exposed
faces etc. Complete As per direction of the Engineer-in-charge.(Shingles for slope) (Quarry bed belongs to BL & LRO Deptt. Govt. of W.B) {N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal.
(a) For Forest area Royalty including entry fee and TP fee : Rs. 178.33 per Cum
(b) For Non-Forest area Royalty : Rs.106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty ( including other chargeswherever applicable, but excluding GST) will be deducted from the bills of works . } | 1,131.37 | Cu.m | 1,452.27 | ₹16,43,054.71 |
| 6 | Quarrying, Carrying ,Supplying Shingles from the
Engineer-in-Charge selected quarrying site to the site of work including cost of materials loading. Unloading ,stacking and carriage and including all incidental charges like Royalty and Labour charges for laying boulder/ shingles in apron or within wire netting of sausage for slope Pitching including carriage up to 30metre and all lifts & dressing the Exposed
faces etc. Complete As per direction of the Engineer-in-charge.(Shingles for interstices filling) (Quarry bed belongs to BL & LRO Deptt. Govt. of W.B) {N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal.
(a) For Forest area Royalty including entry fee and TP fee : Rs. 178.33 per Cum
(b) For Non-Forest area Royalty : Rs.106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty ( including other chargeswherever applicable, but excluding GST) will be deducted from the bills of works . } | 484.87 | Cu.m | 1,023.23 | ₹4,96,133.53 |
| 7 | Quarrying, Carrying ,Supplying Shingles from the
Engineer-in-Charge selected quarrying site to the site of work including cost of materials loading. Unloading ,stacking and carriage and including all incidental charges like Royalty and Labour charges for laying boulder/ shingles in apron or within wire netting of sausage for slope Pitching including carriage up to 30metre and all lifts & dressing the Exposed
faces etc. Complete As per direction of the Engineer-in-charge.(Shingles for repairing of approach road) (Quarry bed belongs to BL & LRO Deptt. Govt. of W.B) {N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal.
(a) For Forest area Royalty including entry fee and TP fee : Rs. 178.33 per Cum
(b) For Non-Forest area Royalty : Rs.106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty ( including other chargeswherever applicable, but excluding GST) will be deducted from the bills of works . } | 1,166.54 | Cu.m | 1,182.93 | ₹13,79,935.16 |
| 8 | Labour charges for constructing sausage crates with 8 Guage/ 10 Guage dia. G.I. wirenetting of different shapes and sizes in embankment, apron, slope etc. including binding with 12 S.W.G., G.I. wire and tied at required interval as per direction of Engineer-in-Charge (rate excludes cost of wirenet and laying of boulders but includes cost of binding wire). | 2,208.2 | Cu.m | 220.95 | ₹4,87,901.79 |
| 9 | Quarrying, Carrying, Supplying stone boulders/ Shingles from the Engineer-In – Charge selected quarrying site to the site of work including cost of materials loading , unloading, stacking and carriage including all incidental charges like royalty and Labour charges for laying boulder/ shingles in apron or within wirenetting of sausage for slope pitching including carriage upto 30 metre and all lifts & dressing the exposed faces etc. complete as per direction of the Engineer-in-charge.etc complete as per direction of the Engineer – in Charge. (Quarry bed belongs to BL & LRO Deptt. Govt. of W.B) {N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal.
(a) For Forest area Royalty including entry fee and TP fee : Rs. 178.33 per Cum
(b) For Non-Forest area Royalty : Rs.106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty ( including other chargeswherever applicable, but excluding GST) will be deducted from the bills of works . }
Boulder above 10 kg. each | 546.43 | Cu.m | 1,311.37 | ₹7,16,571.91 |
| 10 | Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge.
Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil. | 32,406.4 | Cu.m | 129.91 | ₹42,09,915.42 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.68 MB
WB2911.pdf
Tender Documents • 1.86 MB
BOQ_2383460.xls
BOQ • 0.41 MB
BarChart2.pdf
Tender Documents • 0.16 MB
Drawings_2.pdf
Tender Documents • 2.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .