Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance VILLAGE SHANAN P O SANJAULI DISTT SHIMLA | SHIMLA | SHIMLA | HIMACHAL PRADESH | Admitted-Finance |
| 3 | Admitted-Finance VILL SHARGHAL P O PARALA TEHSIL THEOG DISTT SHIMLA H P | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Rejected-Technical | Rejected-Technical Not Eligible |
Tender Value
₹39.2 L
EMD Value
₹78,500
Closing Date
14 Sept 2023, 5:00 pmClosed
Executive Engineer
Jal Shakti Division No-I Kasumpati Shimla-9(HP)
repair of pumps,rewinding of motors, of Phase-1st Phase 2nd i/c repair of all electrical items of panel board, minor and major welding of rising main, common header ,distribution lines, Prov. Grease, M-oil,Gland dori etc. in booth stages, P/F o
2023_HPIPH_78554_1
Kasumpti/Shimla/Kogi shalli/39.24
Open Tender
Manpower Supply
Item Rate
730 days
Shimla
Please refer Tender documents.
6 documents required · 6 mandatory
₹400
EE Jal Shakti Division No-I
₹78,500
Yes
28 Sept 2023
6 Sept 2023
15 Sept 2023
6 Sept 2023
14 Sept 2023
6 Sept 2023
Amount
Providing manpower for Supply & Distribution of water from LWSS Kogi shalli in different locations by operating valves etc. for 24 months (730Days) i/c repair of pumps,rewinding of motors, of Phase-1st & Phase 2nd i/c repair of all electrical items of panel board, minor and major welding of rising main, common header ,distribution lines, Prov. Grease, M-oil,Gland dori etc. in booth stages, P/F of G.I.Tee, Elbow, union,wheel valves, nipples of different dia for various junction, and repair of existing pipe line etc. for smooth functioning of scheme complete in all respectSupply of water for different localities by operating valves etc. for Nine months including minor repairs i.e. Union, Elbow, Tee, wheel valves and welding etc i/c cleaning of grass around civil structure and pump houses and white wash of civil structure from inner and outer side and lifting of debries from all civil structure etc. The time schedule shall be as directed by the Engineer-in-charge completed in all respect. The technical details of the scheme are given below:-
Pumping Machinery. Phase.Ist. Panjog) Phase 2nd. (Tikker)
No. of stages:- 1. stage. 1. stage.
Location of Pump house:- Shanal nallah Shanal nallah
Pump make:- KSB/ Mather Platt KSB/ Mather Platt.
Modal:-
Total Head:- 450Mtrs 411Mtrs
Discharg. 18m3 P/Hour 20m3 P/hour
H.P. 2x60=120HP . 2x60=120HP
Pumping Hours:- 8 Hours 8 Hours
Length of Rising main:- 1400Rmt 1950 Rmt
Dia:- 80 mm dia. 65 mm dia.
Distribution system.:-
Length:- 1st & 2nd Phase=13992 Rmt.
balwant Singh Panwar
Suresh Kumar Sharma
anjali sharma
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .