| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAccepted-AOC FASHIA NO 1 P O HARISINGA P S PANERI DIST UDALGURI BTC ASSAM | UDALGURI | ASSAM | 784113 | ₹2.8 Cr | L1 | Accepted-AOC Work order allotted |
| 2 | L1₹2.8 CrRejected-Finance TANGLA UDALGURI ASSAM | UDALGURI | ASSAM | 784113 | ₹2.8 Cr | L1 | Rejected-Finance Work order not allotted |
| 3 | L1₹2.8 CrRejected-Finance | ₹2.8 Cr | L1 | Rejected-Finance Work order not allotted |
| 4 | L2₹3.1 Cr+₹31.4 L (11.1%)Rejected-Finance VILL CHAPAGURI ROAD P O NORTH BONGAIGAON DIST BOGAIGAON ASSAM | ₹3.1 Cr+₹31.4 L (11.1%) | L2 | Rejected-Finance Work order not allotted |
| 5 | Rejected-Technical | - | - | Rejected-Technical documents not found in order |
Tender Value
₹3.1 Cr
EMD Value
₹6.3 L
Closing Date
4 May 2023, 2:00 pmClosed
CHD, Irrigation, BTC
o/o CHD, Irrigation, BTC, Kokrajhar
Paneri Borbund FIS under PMKSY-HKKP for the year 2021-2022
2023_BoTC_30429_21
CHDI/ ET-24/2022-23/11
Open Tender
Civil Works
Works
365 days
Udalguri Mazbat
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,300
₹6.3 L
Yes
10 Aug 2023
10 Apr 2023
4 May 2023
10 Apr 2023
4 May 2023
17 Apr 2023
Amount
Construction of Spill Weir. Preparing/making level of the ground surface for layout of headworks/ structures for fixing the required axis line by cutting the high land filling and levelling the low land where necessary
Earthwork in excavation in foundation of structures by means of Hydraulic Excavator in all soils including mud, silt, sady clay from the river bed, etc, including clearing the side, dressing,etc.,and removing the earth by loading to dumpers for farther carrige to asafe distance, complete as directed .(0.30 CuM Bucket)
Earthwork in excavation and removal of swelled up earth mixed with silt and slurry due to sand, bailing out water in foundation trenches upto required level In soil mixed with gravel and boulder upto 30 cm size including shuttering, shoring, dewatering by means of pump set etc. removing the spoils to a safer distance etc, complete as directed.
Cement Concrete work in proportion 1: 4: 8 with aggregate of size 13 mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.) A) River Singles i) with shuttering and without dewatering
CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately). A) With river shingles i) With shuttering without dewatering
Cement Concrete work in proportion 1: 2: 4 with aggregate of size 13 mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Temporary arrangement for obtaining clear water should be made at site.) A) River Singles i) with shuttering and without dewatering
Cement Concrete work in proportion 1: 1 ½: 3 with aggregate of size 6 mm to 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Temporary arrangement for obtaining clear water should be made at site.) a) River Singles (ii)With shuttering & without Dewatering
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying complete as directed.
12mm thick cement plastering including clearing surfaces and curing etc. complete as directed.. In proportion 1:4
Providing scaffolding work with rows of bhaluka bamboo and jati bamboo horizontal one row jati bamboo cross and placing second class planks of 0.025 M thick in between the rows tying with coir strings lacing two nos. vertical jati bamboo at both end including dismantling the scaffolding etc, complete as directed.
Collection and supply of one man size 23 to 30 cm hard river boulder including loading, unloading, stacking in measurable stacks at work site paying forest royalty etc. complete as directed. [Average distance considered 25 Km]
Collection and supply of gravel free from dust, dirt and other foreign materials, paying forest royalty, sales tax etc. at work site including stacking in measurable stacks complete as directed. (Considering average distance of 25 Km to 50 Km)
Collection and supply of sand mixed gravel contains 40% of sand and 60% of river gravel of size 13 mm to 38 mm free from all foreign materials including carriage from quarry to the work site loading, unloading and stacking in measurable stacks as directed by the department (Including paying of forest royalty and sales tax etc.)
Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope with voids filling and local carriage of boulders from a distance of 50 m with lift up to 3.00 m Complete as directed
Labour charge for spreading of hard river gravel/broken stone/sandgravel mixture of size of gravel 13 mm to 38 mm to the required thickness including ramming and dressing the seat before laying the materials as irected complete including all carriage etc.
Dewatering Cost (5 HP Pump)
Dewatering Cost (10 HP Pump)
Supplying and mixing rapidite in concrete works below ground water level where necessary etc. complete as directed.
Providing 75 mm dia. Weep Holes including supplying and fixing 75 mm dia PVC pipe in weep holes, complete as directed.
Supplying, fitting, fixing of steel gate of cross & Head Regulator as per desing & drawing & specification including supplying of steel beams, channel section, rubber seal etc. including all materials embedded partly where necessary & manually operated chorister equip mints including carriage of all materials to work site complete.
Earthwork in back filling of structure with earth obtained from outside borrow pits filling with 15 cm layer ramming, dressing and compaction and watering including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Construction of Afflux bund,Guide bund Earthwork in filling in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 km including paying compensation of earth obtained from private land if any loading, unloading, spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment, profiling etc. with all lift complete as directed (Payment will be made after deduction of 12.50% shrinkage allowance from the gross quantity).
Plum concrete work in 40% plum hard boulder 15cm to 23cm size and filling the interstices with 60% of C.C. in prop. 1:3:6 of 13 mm to 38 mm aggregate including shuttering, curing etc. complete as directed. (Temporary arrangement for obtaining clear water should be made at site.) (Av. Quarry distance = 25 KM)
Construction of 1.00 M square boulder sausage including supplying of materials with 25 cm to 30 cm size boulders collecting from a lead of 25 KM encased in 15 cm mesh of 8G hexagonal wire netting and filling the voids between the boulders with stone not exceeding 18 cm in size tied with 8G galvanized tying wire at 30 cm apart, laid in position as directed including necessary local carriage of materials, paying necessary forest royalty including providing 1 (one) no. of jati bamboo horizontal runner along the top of the sausage with vertical bhaluka bamboo post 1.20 M apart driven at least 0.60 M below ground and tying with sausage etc, all complete as directed (With river boulder)
Collection and supply of one man size 23 to 30 cm hard river boulder including laoding, unloading, stacking in measurable stacks at work site paying forest royalty etc. complete as directed. (Average distance considered 25 Km)
Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope with voids filling and local carriage of boulders from a distance of 50m with lift up to 3.00m complete as directed.
Construction of diversion channel and closing bund Earth work in excavation in diversion/ Feeder channel to the designed section and grade by depositing the spoils in the form of embankment on either side in layers not exceeding 15 cm thick including clearing light jungles, Removing trees up to 15 cm dia and uprooting roots and stumps etc. from the seat of embankment and canal and free from all vegetation including breaking clods to not more than 10 mm cube, ramming, dressing, bailing out stagnant rain water where necessary complete as directed. B) In Hard soil (i) Soil mixed with gravel or moram upto 50 mm size (Diversion Channel)
Earthwork in filling in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 km including paying compensation of earth obtained from private land if any loading, unloading, spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment, profiling etc. with all lift complete as directed (Payment will be made after deduction of 12.50% shrinkage allowance from the gross quantity). (Closing bund)
Construction of whole bamboo single pallasiding with matured Jati bamboo post 60 mm to 75 mm dia 15 cm clear apart 1.20 m to 1.50 m above ground and 1.00 m to 1.20 m below ground with jati bamboo structs placed 1.20 m to 1.50 m apart tied with galvd. wire of 16 G to 18 G and complete with three rows half jati bamboo kamies.Complete as directed.
Supplying and laying of empty cement bags filled with sand/earth (As locally available) including stiching the mouth,laying,fixing in position with supply of bags,sutlies etc. Complete as directed.
Sri Bhaba Dev Mahanta
SRI DIPUMONI DAS
NABA BASUMATARY
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .