| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.2 LAdmitted-Finance | ₹16.2 L | L1 | Admitted-Finance |
| 2 | L2₹16.6 LAdmitted-Finance | ₹16.6 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | JAI LAXMI CONTRACTOR L2 | M/S ARYA CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work of foundation in all type of soil with all lead & lift, compaction dressing including all cost of labour, material and T&P etc. requried for proper completion of the work as directed by Engineer-in-charge. | 61.91 | Cum | 70 ₹4,333.35 | 65 ₹4,023.83 |
| 2.00 | Providing & Laying of C.C M-15 A20(1:2:4) with A-20 including all cost of material, labour and T&P etc. required for proper complition of work.as directed by Engineer-in-charge. | 18.78 | Cum | 5,500 ₹1.0 L | 5,000 ₹93,900 |
| 3.00 | Providing & Laying of C.C M-20 A20 Design mix or (1:1.5:3) with A-20 and coarse sand including all cost of labour, material, and T&P etc. required for proper complition of work.as directed by Engineer-in-charge. | 75.12 | Cum | 6,500 ₹4.9 L | 6,200 ₹4.7 L |
| 4.00 | Centering & Shuttering for ordinary C.C work as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 21.36 | SQM | 417 ₹8,907.12 | 417 ₹8,907.12 |
| 5.00 | Centering & Shuttering of line plywood or steel shuttering for all R.C.C work as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 284.38 | SQM | 685 ₹1.9 L | 685 ₹1.9 L |
| 6.00 | Providing & Fixing PVC water stop for expantion/ construction joint including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 16.89 | Rmtr | 865 ₹14,609.85 | 865 ₹14,609.85 |
| 7.00 | Steel reinforcement work in RCC including cutting Bending binding & placing in position as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.(up to 10mm) | 1.74 | MT | 70,000 ₹1.2 L | 65,550 ₹1.1 L |
| 8.00 | Steel reinforcement work in RCC including cutting Bending binding & placing in position as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. (Above10mm) | 5.66 | MT | 65,000 ₹3.7 L | 65,000 ₹3.7 L |
| 9.00 | Providing & laying of local sand in back filling including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 101.34 | Cum | 553 ₹56,041.02 | 553 ₹56,041.02 |
| 10.00 | Providing & Fixing year plate in position including cost of all mterial, labour and T&P for proper complition of work. | 1 | Nos | 700 ₹700 | 700 ₹700 |
Tender Value
₹17.0 L
EMD Value
₹85,000
Closing Date
8 May 2026, 2:00 pmClosed
EE, MGCCD 14, GARHMUKTESHWAR
EE, MGCCD 14, GARHMUKTESHWAR
8 CONSTRUCTION OF CROSS DRAINAGE SYPHON AT KM 3.560 OF MUBARAKPUR MINOR
2026_UPIDC_1144240_8
01/EE/2026-27
Open Tender
Civil Works - Canal
90 days
HASANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹85,000
1 Jun 2026
2 May 2026
8 May 2026
2 May 2026
8 May 2026
2 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work of foundation in all type of soil with all lead & lift, compaction dressing including all cost of labour, material and T&P etc. requried for proper completion of the work as directed by Engineer-in-charge. | 61.91 | Cum | - | - | BI01010001010000000000000515BI0100001113 |
Providing & Laying of C.C M-15 A20(1:2:4) with A-20 including all cost of material, labour and T&P etc. required for proper complition of work.as directed by Engineer-in-charge. | 18.78 | Cum | - | - | BI01010001010000000000000515BI0100001114 | |
| 3 | Providing & Laying of C.C M-20 A20 Design mix or (1:1.5:3) with A-20 and coarse sand including all cost of labour, material, and T&P etc. required for proper complition of work.as directed by Engineer-in-charge. | 75.12 | Cum | - | - | - |
| 4 | Centering & Shuttering for ordinary C.C work as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 21.36 | SQM | - | - | - |
| 5 | Centering & Shuttering of line plywood or steel shuttering for all R.C.C work as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 284.38 | SQM | - | - | - |
| 6 | Providing & Fixing PVC water stop for expantion/ construction joint including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 16.89 | Rmtr | - | - | - |
| 7 | Steel reinforcement work in RCC including cutting Bending binding & placing in position as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge.(up to 10mm) | 1.74 | MT | - | - | - |
| 8 | Steel reinforcement work in RCC including cutting Bending binding & placing in position as required including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. (Above10mm) | 5.66 | MT | - | - | - |
| 9 | Providing & laying of local sand in back filling including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 101.34 | Cum | - | - | - |
| 10 | Providing & Fixing year plate in position including cost of all mterial, labour and T&P for proper complition of work. | 1 | Nos | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.72 MB
BOQ_2137843.xls
BOQ • 0.23 MB
8.pdf
Tender Documents • 2.37 MB
Download all tender documents and submit your bid