Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.0 LAccepted-AOC | 1 | Accepted-AOC 1 |
Tender Value
₹1.0 L
EMD Value
₹2,540
Closing Date
13 Mar 2026, 6:50 pmClosed
The Assistant Engineer
The Assistant Engineer
BUILDING
2026_LSGD_831599_3
47/AE/LIDEW/VPT/P47/25-26
Open Tender
Civil Works - Buildings
Percentage
Valakom GP
Please refer Tender documents.
8 documents required · 8 mandatory
₹555
Yes
₹2,540
Yes
6 Oct 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
13 Mar 2026
6 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BUILDING RENOVATION | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.05 | cum | 257.63 | ₹13.91 |
| 1.002 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 0.02 | cum | 8,364.57 | ₹150.56 |
| 1.003 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.04 | cum | 9,235.97 | ₹332.49 |
| 1.004 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 14 | kg | 178.42 | ₹2,497.88 |
| 1.005 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 16.1 | kg | 187.05 | ₹3,011.51 |
| 1.006 | OD252946/2025-2026:Supplying and fixing GI /Al Sheet | 36.9 | kg | 148.22 | ₹5,468.58 |
| 1.007 | OD252947/2025-2026:Supplying and fixing Acrylic 3D LETTERING ENGLISH OR MALAYALAM of size 10-15cm, 20-30mm projection etc complete as per the direction of engineer incharge at site | 216 | each | 408.18 | ₹88,166.88 |
| 1.008 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 11.8 | sqm | 164.86 | ₹1,945.35 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1426407.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.33 MB
BOQ_1426407.xls
BOQ • 0.31 MB
SBDNIT.pdf
Tender Documents • 0.70 MB
date.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .