| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹44.2 LAccepted-AOC | 1 | Accepted-AOC Accepted as per single tender |
Tender Value
₹44.2 L
EMD Value
₹50,000
Closing Date
29 Jan 2020, 4:00 pmClosed
Construction Engineer K L D C Ltd Thrissur
Construction Engineer K L D C Ltd Thrissur
Renovation of ponds Deepening and Side Protection work, Construction of leading channels,Beautification of pond.
2020_KLDC_337643_1
KLDC/ TSR/2019-20/4(5)
Open Tender
Civil Works - Others
Item Rate
545 days
Annammanada Grama Panchayath
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,800
Yes
Construction Engineer K L D C Ltd Thrissur
₹50,000
Yes
17 Dec 2020
21 Jan 2020
1 Feb 2020
21 Jan 2020
29 Jan 2020
21 Jan 2020
Amount
APPENDIX A- Deepening and Side protection works: Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge
DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
Bailing out water using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo - Mechanically Treated bars of grade Fe-500D or more
Pointing on stone work with cement mortar 1:3 (1 cemennt : 3 fine sand) Flush/Ruled pointing
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
APPENDIX B- Construction of Leading Channel: Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. All kinds of soil .
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo - Mechanically Treated bars of grade Fe-500D or more
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
APPENDIX C- Beautification Of Pond:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
Chequerred precast cement concrete tiles 22mm thick in footpath & courtyard,jointed with neat cement slurry mixed with pigment to match the shade of tiles,including rubbing and cleaning etc. complete on 20mm thick bed of cement mortar 1:4 (1 cement : 4 coarse sand).light shade pigment using white cementd
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_471345.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .