| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAdmitted-Technical | L1 | Admitted-Technical Lowest Bidder | |
| 2 | L2₹3.9 L+₹36,417.34 (10.3%)Admitted-Technical | L2 | Admitted-Technical 2nd Lowest Bidder | |
| 3 | L3₹4.0 L+₹50,612.55 (14.3%)Admitted-Technical KUDLU PO KASARAGOD | KASARAGOD | KASARAGOD | KERALA | 671124 | L3 | Admitted-Technical 3rd Lowest Bidder | |
| 4 | L4₹4.7 L+₹1.1 L (32.1%)Admitted-Technical | L4 | Admitted-Technical 4th Lowest Bidder | |
| 5 | L5₹5.1 L+₹1.5 L (43.6%)Admitted-Technical PUTHUKKUDY HOUSE ELATHUR POST KOZHIKODE | KOZHIKODE | KOZHIKODE | KERALA | 673303 | L5 | Admitted-Technical 5th Lowest Bidder |
| Sl No | Description | Qty | Unit | SANOOP L1 | SARATH D S L2 | ASHIL P L4 | ABDUL RAHIMAN MASHOOD B I L3 | AJITH KUMAR P L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Ceiling Repair | ||||||||
| 1.00 | OD32333/2025-2026:Chipping and removing old spalling/defective concrete and exposing the defective /corroded reinforcement of the ceiling, joint the additional barwherever 1/3 diameter of the bar iscorroded.Removel of the defective concrete across yhe bar should be at least 2 mm beyond the defective bar so that the reinforcing bar can be cleaned with emery ribbon,wire brush etc.After cleaning the bar wash the bar with clean water and collect all the spalled/fallen concrete.measurement is calculated for whole exposed area Including cost of meterials,labour charges,conveyance of meterials to site hire charges of tools etc complete. | 119.68 | sqm | 420 ₹50,265.6 | 350 ₹41,888 Lowest | 800 ₹95,744 | 450.48 ₹53,913.45 | 900 ₹1,07,712 |
| 1.00 | OD32337/2025-2026:The cleaned reinforcing bar,on the dried bar,applying corrotion inhibitant one coat ofnitrozinc primer care should be taken to see that the zinc rich primer coated should make an unbrocken continous film on the bars. After cleaning the bar applying one coat of bonding agent Nitobond A R/SBR.measurement is calculated as in the previous case.Including cost of meterials,labourcharges,conveyance of meterials to site hire charges of tools etc complete" | 119.68 | sqm | 720 ₹86,169.6 | 700 ₹83,776 Lowest | 800 ₹95,744 | 812.72 ₹97,266.33 | 900 ₹1,07,712 |
| 1.00 | OD32335/2025-2026:The applying two component high build polymer modified cementitions reinstatement mortor Rendroc HB2 preferable with hand using wet on wet methed to make sure that high strength polymer mix covers the reinforcing bar on all sides and cover the acidic concrete.measurement is calculated as in theprevious case.Including cost of meterials,labour charges,conveyance of meterials to site hire charges of tools etc complete. | 119.68 | sqm | 887 ₹1,06,156.16 | 1,000 ₹1,19,680 | 800 ₹95,744 Lowest | 1,018.52 ₹1,21,896.47 | 800 ₹95,744 Lowest |
| 1.00 | OD32336/2025-2026:The Ceiling surface is to be smoothened with modified mortor to an average thickness of 15 mm. measurement is calculated as in the previous case.Including cost of meterials, labour charges,conveyance of meterials to site hire charges of tools etc complete | 119.68 | sqm | 370 ₹44,281.6 Lowest | 600 ₹71,808 | 800 ₹95,744 | 468.98 ₹56,127.53 | 800 ₹95,744 |
| 1.00 | 14.1.1:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand) | 73.56 | sqm | 385 ₹28,321.76 Lowest | 400 ₹29,425.2 | 500 ₹36,781.5 | 422.33 ₹31,067.86 | 600 ₹44,137.8 |
| 1.01 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer | 193.24 | sqm | 50 ₹9,662.15 Lowest | 50 ₹9,662.15 Lowest | 80 ₹15,459.44 | 58.9 ₹11,382.01 | 90 ₹17,391.87 |
| 1.01 | 13.60.1:Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 193.24 | sqm | 110 ₹21,256.73 Lowest | 130 ₹25,121.59 | 120 ₹23,189.16 | 125.94 ₹24,337.02 | 150 ₹28,986.45 |
| 1.01 | OD146412/2025-2026:Engaging man coolies for cleaning the roof of building from dead leaf and dirty materials | 9 | each | 870 ₹7,830 Lowest | 1,000 ₹9,000 | 1,000 ₹9,000 | 951.72 ₹8,565.48 | 1,200 ₹10,800 |
Tender Value
₹4.9 L
EMD Value
₹12,280
Closing Date
15 Sept 2026, 4:00 pmClosed
AEE
Assistant Executive Engineer, PWD Buildings Sub Division, Koyilandy
ceiling of main building seen highly dilapidated condition and spalling occuring several area in the roof slab
2026_PWD_868202_1
PWD/2026-27/D2/BSDKYL/15
Open Tender
Civil Works - Buildings
Item Rate
180 days
Perambra
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,085
Yes
₹12,280
Yes
18 Sept 2026
8 Sept 2026
17 Sept 2026
8 Sept 2026
15 Sept 2026
8 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Ceiling Repair | |||||
| 1.001 | OD32333/2025-2026:Chipping and removing old spalling/defective concrete and exposing the defective /corroded reinforcement of the ceiling, joint the additional barwherever 1/3 diameter of the bar iscorroded.Removel of the defective concrete across yhe bar should be at least 2 mm beyond the defective bar so that the reinforcing bar can be cleaned with emery ribbon,wire brush etc.After cleaning the bar wash the bar with clean water and collect all the spalled/fallen concrete.measurement is calculated for whole exposed area Including cost of meterials,labour charges,conveyance of meterials to site hire charges of tools etc complete. | 119.68 | sqm | - | - |
| 1.002 | OD32337/2025-2026:The cleaned reinforcing bar,on the dried bar,applying corrotion inhibitant one coat ofnitrozinc primer care should be taken to see that the zinc rich primer coated should make an unbrocken continous film on the bars. After cleaning the bar applying one coat of bonding agent Nitobond A R/SBR.measurement is calculated as in the previous case.Including cost of meterials,labourcharges,conveyance of meterials to site hire charges of tools etc complete" | 119.68 | sqm | - | - |
| 1.003 | OD32335/2025-2026:The applying two component high build polymer modified cementitions reinstatement mortor Rendroc HB2 preferable with hand using wet on wet methed to make sure that high strength polymer mix covers the reinforcing bar on all sides and cover the acidic concrete.measurement is calculated as in theprevious case.Including cost of meterials,labour charges,conveyance of meterials to site hire charges of tools etc complete. | 119.68 | sqm | - | - |
| 1.004 | OD32336/2025-2026:The Ceiling surface is to be smoothened with modified mortor to an average thickness of 15 mm. measurement is calculated as in the previous case.Including cost of meterials, labour charges,conveyance of meterials to site hire charges of tools etc complete | 119.68 | sqm | - | - |
| 1.005 | 14.1.1:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand) | 73.56 | sqm | - | - |
| 1.006 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer | 193.24 | sqm | - | - |
| 1.007 | 13.60.1:Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 193.24 | sqm | - | - |
| 1.008 | OD146412/2025-2026:Engaging man coolies for cleaning the roof of building from dead leaf and dirty materials | 9 | each | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
finance_1470429.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.63 MB
BOQ_1470429.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .