| 1 | L1₹60.3 LAccepted-AOC FLOOR NO GROUND FLOOR BUILDING NO FLAT NO EP X130A CHEMBANKOLL Y UPPADA PO MALAPPURAM KERALA | MALAPPURAM | MALAPPURAM | KERALA | ₹60.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹62.9 LRejected-AOC | ₹62.9 L | L2 | Rejected-AOC L2 |
Updated dates
Tender Value
₹64.2 L
EMD Value
₹50,000
Closing Date
20 Feb 2026, 4:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER ESD NILAMBUR
O/o Assistant Executive Engineer Electrical Sub Division Nilambur, Mini Vydyuthi bhvanam,Near Kodathipadi, Nilambur
Shifting of 33 KV /HT/LT poles, lines , structures from Myladi to Moolepadam at Electrical Section Akampadam.
2026_KSEB_830520_1
TENDER/2025-26/6217/27 dt.24.01.2026
Open Tender
Electrical Works
120 days
Akampadam
Please refer tender doccuments
7 documents required · 7 mandatory
₹5,900
₹50,000
2 Mar 2026
2 Feb 2026
24 Feb 2026
2 Feb 2026
20 Feb 2026
2 Feb 2026
Dismantling existing A type strut pole in 33Kv line with out damage (50% of erection charge)
Dismantling existing A type pole in 33 kv line with out damage
Dismantling (without damage) one km 33kV line (3 conductors ACSR DOG), cross arm, insulators, disc, rolling the conductor and stacking.(Taking the 50% value of stringing).
Fitting and erecting 'A' type fabricated line pole line and level including cross arm fixing, jointing of posts by using angles, bolts & nuts, earthing etc. but excluding cost of materials.
Demolishing stone rubble masonry in cement mortar manually/by mechanical means including stacking or serviceable material and disposal of un serviceable material within 50M lead as per direction of Deptl officers at site
Cutting of steel angles
Mounting the cable ends of all sizes upto and incl. 3x300 sq mm with special type cable clamps incl. cost of extra materials if needed and giving necessary connections.
ERECTION OF TOWER SUPER STRUCTURE ABOVE GROUND LEVEL INCLUDING ERECTION OF NORMAL AND SPECIAL HILL SIDE EXTENSION MEMBERS WHERE EVER NECESSARY PROVIDING TOWER ACCESSORIES LIKE PHASE DANGER AND NUMBER PLATES BIRD GUARDS AND CLIMBING DEVICES ETC.COMPLETE
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to50 m and lift up to 1.5m
Digging one number of 33Kv stay/earth pits as per directions including breaking clods, watering, ramming and sectioning of soil bank etc., complete.
Fitting and providing 1 No. of 33Kv stay as per the drawings & direction, using tools and tackles including back filling but excluding excavation.
Plastering the concrete muffing with 12 mm plaster of mix in cement mortar 1:4 (1 cement : 4 fine sand)
Filing of holes
Paving out, stringing and tensioning as per standard of three line ACSR 'Dog' conductor including attaching insulator string or pin insulator on pole cross arms, clamping conductor on the pin insulator as well as on insulator string, jumpering the conductor at tension points, jointing of conductor wherever necessary, hire charges for all tools and tackles, providing suitable back stays at the time of stringing, if necessary etc complete
itting and erecting 1 No. DP using 14/12 A type poles in line and level including fixing of angles to connect the two poles by using clamps, bolts & nuts and earthing etc. but excluding cost of materials.
Dismantling of tower superstructure above ground level including dismantling of tower accessories like phase, danger and number plates,bird guards, anticlimbing devices etc.complete.(50% of erection charge)
Dismantling existing 33Kv DP with A type pole with out damage(50% of erection charge)
Earth work excavation work by mechanical means in (Hydraulic excavator) / manual means in foundation trenches or drains (exceeding 30 cm depth 1.5 m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead upto 50M and lift upto 1.5m as directed by Engineer in charge ordinary rock
Earth work excavation work by mechanical means in (Hydraulic excavator) / manual means in foundation trenches or drains (exceeding 30 cm depth 1.5 m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead upto 50 M and lift 1.5 M to 3 M as directed by Engineer in charge Ordinary rock
Digging pole pit for A type fabricated pole as per directions including breaking clods, watering, ramming and sectioning of spoil bank etc., complete.
Providing and laying in position cement concrete of 1:4:8(1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) including the cost of all materials to be supplied by the contractor at site, conveyance charges of all materials to site of work,labour charges, watering, finishing,curing but excluding the cost of centering shuttering and reinforcement. All works up to the plinth level.
Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns
Fixing and levelling of stub in lines and levels as per the directions of deptl.officers
Providing and laying in position cement concrete of 1:2:4(1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including the cost of all materials to be supplied by the contractor at site, conveyance charges of all materials to site of work,labour charges, watering, finishing,curing but excluding the cost of centering shuttering and reinforcement. All works up to the plinth level
Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary.
Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling.
Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite
Fitting and providing one Strut using A type pole incl. digging & back filling pit
Fitting one Additional V cross arm in existing single pole incl. conveyance of materials.
Fitting one Additional 2.4m Channel cross arm in existing single pole incl. conveyance of materials.
Drilling hole of various sizes on existing Channel/Cross Arm.
Fitting and providing one HT Fly stay for 11kV pole using A type pole incl. digging & back filling pits.
Providing stay (temporary nature) by piling Cut Ends in kole land incl. fabrication of cut ends and conveyance.
Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle).
Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading.
Dismantling one damaged 11kV A type pole after disconnecting stays, strut etc. and stacking the same.
Erecting one LT PSC Pole in position incl. digging & back filling pit.
Providing Stay for LT poles incl. digging & back filling pit.
Providing Strut using LT PSC pole incl. digging & back filling pit.
Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite.
Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite
Stringing one km LT Sph 2 wire line (Rabbit) incl. fitting cross arm etc. removing touchings and conveyance of materials
Stringing one km LT 3ph 4 wire line (Rabbit for Ph, Weasel for N) incl. fitting cross arm etc. removing touchings and conveyance of materials.
Stringing one km LT Addl conductor (Rabbit) after fitting crossarm, but without realigning existing conductor, incl. fitting cross arm, insulator etc. removing touchings and conveyance of materials
Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc.
Providing WP support with PSC pole incl. digging & back filling pit.
Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting.
Dismantling one Transformer (upto and incl. 160kVA) from existing structure to ground.
Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).
Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification).
Fitting one additional HT pin with insulator
Fitting one additional F top bracket
Dismantling one HT pin insulator with pin and bring back to section store.
Additional rate for excavation of Pit for A type pole in Hard Laterite.
Fitting 6 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses.
Fitting and erecting one HT PSC DP, fitting all accessories (2 stays, 8 cross arms, AB, DO, LA etc.), mounting of 100kVA Transformer, fixing DB, DTR box and giving all HT & LT connections.
Erecting one 25kVA Transformer to existing DP and giving connections, incl. loading & unloading, excluding transportation.
Installing one DTR Meter with box on existing poles and giving the complete connections incl. conveyance of materials.
Fitting one additional Fuse unit and giving connection from Transformer to fuse and DB to LT OH line.
Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite.
Pole numbering using printed Aluminium sheets / Painting the surface of pole with anti algal yellow paint and painting Letters with black paint as specified incl. cost of paint.
Fitting one LT 4 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line
Fitting one LT 2 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line.
Fitting one set AB switch and giving connection
Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials.
Fitting one Additional 2.4m/3m Channel cross arm (75x40x6mm), in existing 11kV DP incl. conveyance of materials.
Dismantling (without damage) one km LT additional conductor line, cross arms, insulators and stacking the conductors in rolls.
Dismantling one section fuse
Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion.
Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion.
Dismantling one Anchor clamp /dead end clamp from 11 KV ABC
Dismantling one set(3No) 11kV LA
Dismantling of 11 kV Aerial bunched cable XLPE insulated of size 3 x 150+ 1 x 120 sqmm with bare insulated Messenger
Fitting one No. LT lightning arrestor in LT OH line and giving connections excluding earthing.
Providing Transformer fencing , using 50x50x6mm Angle iron, 40 x 6 mm MS flat and 8 mm MS rod as specified, incl cost of transportation & foundation
Providing yard metalling with 6mm & 40mm thick blue metal as specified after constructing a curb wall.
Erection of Anchor clamp / dead end clamp for 11kV ABC of any size
Providing Fly stay for LT pole using LT PSC pole incl. digging & back filling pit.
Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
Dismantling (without damage) one LT PSC/RCC Strut pole incl. removal of clamps and stacking.
Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls.
Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls
Erection of of stainless steel strap and buckles
Stringing of 11 kV Aerial bunched cable of size 3 x 150 + 1 x 120 sqmm with bare/insulated Messenger through existing poles
Transporting poles by hired vehicle to a distance beyond 5km and carrying upto 4 poles. (Running km).
Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same
Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.
Dismantling (without damage) one 11kV A type pole after disconnecting stays, strut etc. and stacking the same.
Dismantling (without damage) one HT PSC/RCC Strut pole incl. removal of clamps and stacking.
Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking.
Dismantling one V cross arm/Channel cross arm from existing Pole, and bringing back to section store.
Dismantling one Channel cross arm from existing DP structure, and bringing back to section store.
Dismantling (without damage) one AB switch from existing structure and bringing back to section store.
Dismantling transformer station in DP structure excluding the rate of dismantling earthing
Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.
Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.
Additional rate for providing one disc set on any type of HT pole for making cut point.
Fitting and erecting one HT DP using A type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.
Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.
Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit.
Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits.
Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite.
Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite.
Additional rate for excavation of Pit for A type pole in Laterite.
Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit.
Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
TENDERDOC.pdf
Tender Documents • 0.33 MB
BOQ_1398512.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid