Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L6₹44.8 L+₹9.7 L (27.5%)Accepted-AOC FLAT NO 101 UGF FRONT LHS RZ B 49A KAILASHPURI PALAM COLONY NEW DELHI 110045 | SOUTH WEST | DELHI | 110045 | L6 | Accepted-AOC being lowest | |
| 2 | L1₹35.1 LRejected-Finance | L1 | Rejected-Finance Non bonafide as per Sch A note No 21 on Ser Page No 16 of tender documents | |
| 3 | L2₹40.8 L+₹5.6 L (16.0%)Rejected-Finance G 86 DATA RAM SECTOR 18 ROHINI NEW DELHI DELHI 110085 | NORTH WEST DELHI | DELHI | 110085 | L2 | Rejected-Finance Non bonafide as per Sch A note No 21 on Ser Page No 16 of tender documents | |
| 4 | L3₹44.6 L+₹9.5 L (27.0%)Rejected-Finance 131 SHINGANAPUR ROAD KOLKI KOLKI SATARA MAHARASHTRA 415523 | SATARA | MAHARASHTRA | 415523 | L3 | Rejected-Finance Non bonafide as per Sch A note No 21 on Ser Page No 16 of tender documents | |
| 5 | L4₹44.8 L+₹9.7 L (27.5%)Rejected-Finance 1 128 A SECOND FLOOR MOHAMMADPUR NEAR BHIKAJCAMA PLACE NEW DELHI 110066 | NEW DELHI | NEW DELHI | DELHI | 110066 | L4 | Rejected-Finance Non bonafide as per Sch A note No 21 on Ser Page No 16 of tender documents |
Tender Value
₹48.9 L
EMD Value
₹97,780
Closing Date
1 Feb 2020, 6:00 pmClosed
Garrison Engineer North Delhi Cantt-10
Garrison Engineer North Delhi Cantt-10
MANNING AND OPERATION OF WATER SUPPLY INSTALLATIONS POWER HOUSES AT 21 SIG ANAND PARBAT AND KINSGWAY CAMP TIMARPUR UNDER GE N DELHI CANTT 10
2020_MES_314221_1
GE/NORTH-01/2019-20
Open Tender
Manpower Supply
Item Rate
333 days
Delhi Cantt-10
as per NIT
9 documents required · 9 mandatory
₹500
Garrison Engineer North Delhi Cantt-10
₹97,780
Yes
14 Feb 2020
13 Jan 2020
3 Feb 2020
13 Jan 2020
1 Feb 2020
25 Jan 2020
Amount
M&O of elect installation of transformer, LT distribution panel boards and HT circuit breaker and at MES main receiving stn power house Anand Parbat by employing ONE Electricians (SK) in each shift 8 hours for three shifts (‘A’ shift 0600 Hrs to 1400 Hrs, ‘B’ shift 1400 Hrs to 2200 Hrs, ‘C’ shift 2200 Hrs 0600 Hrs) incl Sunday and Holiday complete all as specified and directed by the installation mainly comparing the following (Total 03 Electrician ) (a) Transformer 300 KVA -01 (b) Transformer 150 KAV-01 No (c) Transformer 100 KVA-01 (d) HT VCB incoming-01 No, and outgoing-07 Nos (e) LT Panel Board -06 Nos (f) Connected LT/HT cables and other accessories inside Main power Hosue
M&O of transformer , LT distribution panel boards and HT Circuit breakers and at MES Power House at MAP DUs (349 JCOs/Ors) Md accn at Anand Parbat by employing ONE Electrician (Sk) in each shift of 8 Hours for three shifts (‘‘A’ shift 0600 Hrs to 1400 Hrs, ‘B’ shift 1400 Hrs to 2200 Hrs, ‘C’ shift 2200 Hrs 0600 Hrs) inclding Sunday and Holiday complete all as specified and directed by the installation mainly comprising the following (Total 03 Electrician ) (a) Transformer 500 KVA -02 (b) Transformer 400 KVA-01 No (c) DG sets 100 KVA-04 Nos (d) HT VCB incoming-01 No, and outgoing-05 Nos (e) LT Panel Board -16 Nos (f) Connected LT/HT cables and other accessories inside Main power Hosue
Manning and Operation of 11KV Bulk receiving stn regularly along with LT distribution panel boards and HT circuit breakers operation of incoming and outgoing feeders, Transformers and at 11 KV HT Bulk Recieving Electric Sub-Station and MES power house at Kingsway Camp, Timarpur by deploying tradesmen having adequate experience to handle E/M machinery of any type with one electrician in Each shift of 8 hrs duration of three shift 06 .00 AM to 02.00 PM , 02.00 PM to 10 .00 PM and 10.00 PM to 6.00 am daily (Including Sunday & Holiday) as specified and directed by Engr-in-charge. Total Electrician-03 Nos) The installation required to be manned for eight hours per shift are as under:- (a) HT VCB 11 KV 800 Amps incoming -01 Nos (b) Transformer 400 KVA -01 No (c) Transformer 160 KVA -01 No (d) LT distribution cubical panel board -01 No (e) LT panel board -01 No. (f) GOD- 01 No
Note of item No 01 to 03 (i) In case of any break down, shut down or tripping of VCBs, Operator will immediately inform to JE/ Engineer-in-Charge w/o delay and sufficient staff should also be arranged by contractor for un-interrupted supply and nothing extra shall be paid on this account, same ame shall be included in quoted rates (ii) Daily maintenance of Power House / Cleaning of all transformer room, VCB room and connected area shall be got cleaned by the contractor included in the above item rate. (iii) Normal maintenance of DG Sets like cleaning and checking of all accessories Battery and routine test as required. (iv) The contractor shall be responsible to reinstate and make good at his own expense, the damage if any caused by his workmen etc., to existing buildings,E&M equipments, Machineries,Cables and connected accessories complete. (v) The contractor shall be provide the neccessary T&P and Safety equipemnts at installations as required at site. (vi) The operator shall be deployed qualified ITI technician of proper experience . (vii) For payment of minimum wages to the workers provisions shall be strictly followed by the contractor (viii) Log book records for each installation shall be supplied by the contractor after approval of format by GE / Engr-in-Charge / JE and record to be updated by the operator
M&O of Water supply installation at Anand Parbat area by employing ONE Pump operator in each shift of 8 hours for two shifts ('A' shift 0600 Hrs to 1400 Hrs, 'B' shift 1400 Hrs to 2200 Hrs) incl Sunday and holiday complete all as Specified and directed by the installation mainly comprising the following :- (Total 02 Pump Operator/ FGM) (a) Centrifugal Pump Sets 75 HP - 03 Nos. (b) UG Sump 50000 Glns - 01 No (c) Voltage Stabilizer 200 KVA - 01 Nos (d) Connected Pipe lines & Control valves and accessories (e) LT Panel board- 0 4Nos (f) DG Set 63 KVA - 01 No
M&O for operation of Water supply installation at MAP DUs for Officers Md Accn at Anand Parbat area by employing ONE Pump operator in each shift of 8 hours for two shifts ('A' shift 0600 Hrs to 1400 Hrs, 'B' shift 1400 Hrs to 2200 Hrs) incl Sunday and holiday complete all as Specified and directed by the installation mainly comprising the following :- (Total 02 Pump Operators/ FGM) (a) Centrifugal Pump Sets 05 HP - 02 Nos. (b) UG Sump 25000 Glns - 01 No (c) Subemerrsible pump sets(10HP) - 01 Nos (d) Connected Pipe lines&Control valves and accessories (e) LT Panel board- 04Nos (f) DG Set 100 KVA - 01 Nos (g) Dosing equipement-01 No (h) Raw sewage Non clog submersible Pump sets 02 HP-02 Nos.
M&O for operation of Water supply installation at MAP DUs (349 JCOs/ORs) Md accn at Anand Parbat area by employing ONE Pump operator in each shift of 8 hours for two shifts ('A' shift 0600 Hrs to 1400 Hrs, 'B' shift 1400 Hrs to 2200 Hrs) incl Sunday and holiday complete all as Specified and directed by the installation mainly comprising the following :- (Total 02 Pump Operators/ FGM) (a) Centrifugal Pump Sets 10 HP - 02 Nos. (b) UG Sump 275000Ltrs - 01 No (c) Subemerrsible pump sets(10HP) - 02 Nos (d) Connected Pipe lines&Control valves and accessories (e) LT Panel board- 04Nos (f) Dosing equipemnt-01 No
Note for Srl item No 5 to 7 (i) Operation of pump installation of any capacity and run the pump time to time as on required basis. (ii) Operating chlorination system as per requirment in order to get 1.00 PPM at pump house and 0.2 PPM at users end (iii) Operation of sluice valves at overhead reservoir to supply water to the users time to time twice in a day. (iv) Normal maint of Pumping sets and tightening nut bolt washer etc and cleaning all pump house room and connected area included in the rate of items. ( v) The contractor shall be responsible to reinstate and make good at his own expense, the damage if any caused by his workmen etc to existing buildings, E&M equipments & connected accessories complete. (vi) The contractor shall be provide the neccessary T&P and Safety equipemnts at installations as required at site. (vii)The operator shall be deployed Skilled ITI technician and qualified tradesman with proper experience . (viii) For payment of minimum wages to the workers shall be strictly adhered to (ix) Log book for records shall be supplied by the contractor after approval of format by GE / Engr-in-Charge / JE and record to be updated by the operator
Note for bidder:- 1. Security Deposit @ 10% of total quoted amount in addition to Performance Security @5% shall be deposited by the contractor within 30 days from acceptance of Contract. Ref Sch 'A' Note No 24 on page No 16. 2. Attention of bidder is invited to periodical variation in minimum wages as notified by Govt of India/State Govt (Whichever is more) from time to time, the rates quoted by bidder shall deemed to be inclusive of any such variation and the contractor shall pay the wages as notified by Govt during the execution of contract. No reimbursement would be admissible except for taxes directly related to contract value as covered under Special Condition 27.
NEETU TRADERS (INDIA)
Vishal Traders
Shiv Enterprises
M/s Dhapola Elevator and Engineering
MAA SANTOSHI ENTERPRISES
HIND CONSTRUCTIONS
V r traders
Choice india
Powerlite Engineers
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .