Tender Value
₹24.3 L
EMD Value
₹48,542
Closing Date
6 Aug 2026, 3:00 pm5d left
EE, CCD, Kunjaban Extension
o/o the EE, CCD, Kunjaban Extension
Routine maintenance of Type V and Type VI quarters of Kunjaban extension Agartala under Capital Complex Sub-Division No-I during the year 2026-27
2026_CEPWD_75022_1
35/DNIT/EE/CCD/PWD/2026-27
Open Tender
Civil Works
Percentage
180 days
Kunjaban Extension
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
₹48,542
28 Jul 2026
28 Jul 2026
6 Aug 2026
29 Jul 2026
6 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
-All kinds of soil | 21.6 | Cum | 231.6 | ₹5,002.56 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. -All kinds of soil | 14.4 | Cum | 161.3 | ₹2,322.72 |
| 3 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 3.4 | Cum | 1,177.3 | ₹4,002.82 |
| 4Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level: | |||||
| 4.01 | 1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate 20 mm nominal size) | 6.4 | Cum | 10,570.6 | ₹67,651.84 |
| 5 | First class brick work in foundation and plinth including cost of all materials as required complete:- i) In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 4.8 | Cum | 9,845.2 | ₹47,256.96 |
| 6 | First class brick work in superstructure above plinth level & upto floor-five level including cost of all materials as required complete:-
i) In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 6.3 | Cum | 11,410.19 | ₹71,884.2 |
| 7 | Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete:-
i) In cement mortar 1:4 ( 1 cement : 4 fine sand ). | 42 | Sqm | 1,533.5 | ₹64,407 |
| 8 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position :
(i) Local Teak wood | 0.39 | Cum | 1,06,388.3 | ₹41,491.44 |
| 9Providing and fixing 25 mm thick shutters for cup board etc. :Panelled or panelled & glazed shutters : | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.39 MB
fdnit.pdf
Tender Documents • 3.63 MB
BOQ_76378.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].