Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹2,020
Closing Date
22 Apr 2022, 6:55 pmClosed
Executive Engineer Mech. Irrig. Div. Baramulla
Mech. Irrig. Div. Baramulla
Electrical work to be carried out at various lift irrigation schemes (Khaidnayar, Darpora and Delina Ghat).
2022_IFC_166832_3
eNIT 02 of 2022-23
Open Tender
Repair and Maintenance Works
Item Rate
7 days
Baramulla
Please refer Tender documents.
6 documents required · 6 mandatory
₹100
Yes
Executive Engineer Mech. Irrig. Div. Baramulla
₹2,020
Yes
Mech. Irrig. Div. Baramulla
25 Apr 2022
16 Apr 2022
23 Apr 2022
16 Apr 2022
22 Apr 2022
16 Apr 2022
20 Apr 2022
Amount
• Dismantling of 40Hp motors of lift irrigation scheme Khadniyar & Darpora unit no .02 of both stations from its respective base frame by opening foundation bolts, using chain pulley block and allied tools and tackles for carrying motor to the loading site, loading in private load carrier and shifting it to workshop for necessary repairs. Shifting back motor to site after taking necessary repairs at workshop by loading in private load carrier and testing on full load after connecting 03 power supply connections. (01 job) • Complete rewinding of stator coils as per sample of copper wire of standard size and quality. (24kgs) • Providing & fitting of high quality insulating material in the slots of the stator including bamboo straps, latheride paper fiber glass tape etc. • Varnishing of windings using good quality varnish. The job includes heat treatment process using conventional method. • Providing and fitting of copper connection leads as per requirement (06 no) • Deduct the cost of old scrap as 80% of the weight of copper winding at item b. (19.2kg @ 450/kg).
• Dismantling of 50Hp motor of lift irrigation scheme Delina Ghat from its respective base frame by opening foundation bolts, using chain pulley block and allied tools and tackles for carrying motor to the loading site, loading in private load carrier and shifting it to workshop for necessary repairs. Shifting back motor to site after taking necessary repairs at workshop by loading in private load carrier and testing on full load after connecting 03 power supply connections. (01 job) • Complete rewinding of stator coils as per sample of copper wire of standard size and quality. (35kg) • Providing & fitting of high quality insulating material in the slots of the stator including bamboo straps, latheride paper fiber glass tape etc. • Varnishing of windings using good quality varnish. The job includes heat treatment process using conventional method. • Providing and fitting of copper connection leads as per requirement (06 no) • Deduct the cost of old scrap as 80% of the weight of copper winding at item b. (28kg).
M/S STAR ELECTRICAL ENGINEERING WORKS
SYED MOHAMMAD SHAH
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .