Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.3 L+₹1,709.80 (0.52%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MOHAMMED ANAS ELLIKKAL L2 | ABDUL AZEEZ EK L1 |
|---|---|---|---|---|---|
| 1.00Road drainage | |||||
| 1.00 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 57.2 | cum | 410 ₹23,452 | 400 ₹22,880 Lowest |
| 1.00 | OD466359/2024-2025:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. PCC grade M10, (i) Nominal mix 1:3:6 ( excluding form work) (OD from MoRD 11.4.1.1) | 4.4 | cum | 8,000 ₹35,200 | 7,940 ₹34,936 Lowest |
| 1.00 | 11.4.2.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 II. P.C.C grade M 15 (i) Nominal mix (1:2.5:5) | 20 | cum | 8,100 ₹1,62,000 | 8,075 ₹1,61,500 Lowest |
| 1.00 | 75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification
(i) Nominal mix (1:2:4) | 1.2 | cum | 8,450 ₹10,140 | 8,430 ₹10,116 Lowest |
| 1.00 | 12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 | 0.4 | tonne | 92,750 ₹36,729 | 92,700 ₹36,709.2 Lowest |
| 1.01 | 12.5.3:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m III. R.C.C grade M 20 | 6.6 | cum | 9,610 ₹63,426 | 9,560 ₹63,096 Lowest |
Tender Value
₹3.3 L
EMD Value
₹8,250
Closing Date
25 Oct 2025, 6:00 pmClosed
Assistant Engineer
O/o The Assistant Engineer LSGD section Moonniyur GP
162 Construction of Kattuvachira Drain in Moonniyur GP
2025_LSGD_811718_13
AE/LSGD/Mnr/08/2025-26
Open Tender
Civil Works - Roads
Item Rate
300 days
Moonniyur
Please refer Tender documents.
7 documents required · 7 mandatory
₹730
₹8,250
24 Jun 2026
18 Oct 2025
27 Oct 2025
18 Oct 2025
25 Oct 2025
18 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1356976.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1356976.xls
BOQ • 0.30 MB
kattuPA.pdf
Tender Documents • 0.26 MB
kattusbd.pdf
Tender Documents • 0.98 MB
Kattufot.pdf
Other Document • 0.25 MB
Kattufee.pdf
Other Document • 0.25 MB
Kattuaffi.pdf
Other Document • 0.24 MB
IPact.pdf
Additional Documents • 0.24 MB
kattuabstr.pdf
Additional Documents • 0.02 MB
Epayment.pdf
Additional Documents • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .