Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹64.4 L
EMD Value
₹1.3 L
Closing Date
21 Oct 2026, 1:30 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
DFO Kishtwar
Forest Complex Sarkoot Kishtwar
BOQ
2026_FD_328373_1
56 of 2026
Open Tender
Agricultural or Forestry
Percentage
60 days
Nagseni Range
SBD
2 documents required · 2 mandatory
₹1,600
DFO Kishtwar
₹1.3 L
16 Oct 2026
16 Oct 2026
23 Oct 2026
16 Oct 2026
21 Oct 2026
16 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (A). New/ Repair of Irrigation Canals (Khuls) at Tekra Nallah to Hotar village: Dry random rubble masonry with hard stone in foundation and plinth: 7.3.1 With bond stone. Nallah | 71.33 | Cum | 3,262.1 | ₹2,32,685.59 |
| 2 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) | 83.64 | Sqm | 283.8 | ₹23,737.03 |
| 3 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete.50 mm thick with 20mm nominal size stone aggregate | 111.52 | Sqm | 562.15 | ₹62,690.97 |
| 4 | Carriage of materials from source to site of work by M.T. Stone av. | 71.33 | Cum | 698.68 | ₹49,836.84 |
| 5 | Carriage of materials from source to site of work by M.T. Sand av. | 14.05 | Cum | 1,023.95 | ₹14,386.5 |
| 6 | Carriage of materials from source to site of work by M.T. Bajri av. | 16.06 | Cum | 1,023.95 | ₹16,444.64 |
| 7 | (B). New/ Repair of Irrigation Canals (Khuls) at Argad to Tekra: Dry random rubble masonry with hard stone in foundation and plinth: 7.3.1 With bond stone. Nallah | 148.68 | Cum | 3,262.1 | ₹4,85,009.03 |
| 8 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete.50 mm thick with 20mm nominal size stone aggregate | 269.75 | Sqm | 562.15 | ₹1,51,639.96 |
| 9 | Carriage of materials from source to site of work by M.T. Stone av. | 148.68 | Cum | 698.68 | ₹1,03,879.74 |
| 10 | Carriage of materials from source to site of work by M.T. Sand av. | 19.42 | Cum | 1,023.95 | ₹19,885.11 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
BOQ_1111634.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .