| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.8 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹6.8 L+₹153.31 (0.02%)Rejected-AOC | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | T.T.THOMASKUTTY L1 | Tittin Thevarumuriyil L2 |
|---|---|---|---|---|---|
| 1.00Side protection | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 30 | sqm | 17.3 ₹519 Lowest | 17.35 ₹520.5 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 89.7 | cum | 244.75 ₹21,954.08 Lowest | 245 ₹21,976.5 |
| 1.00 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 135.45 | cum | 3,793.8 ₹5,13,870.21 Lowest | 3,794 ₹5,13,897.3 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 7 | cum | 9,964.35 ₹69,750.45 Lowest | 9,965 ₹69,755 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 376.25 | kilogram | 106.8 ₹40,183.5 Lowest | 107 ₹40,258.75 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 17.9 | sqm | 367 ₹6,569.3 Lowest | 367 ₹6,569.3 Lowest |
| 1.01 | 60.2.1:EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 45 | cum | 693.5 ₹31,207.5 Lowest | 694 ₹31,230 |
Tender Value
₹7.2 L
EMD Value
₹18,001
Closing Date
21 Mar 2026, 5:00 pmClosed
Assistant Executive Engineer
Minor Irrigation Sub Division, Mini Civil Station, IInd Floor, Aranmula
GENERAL-MI PTA-Harithakeralam - Plan 2025-26 -Padathupalam padashekharamproviding irrigation facilities to Padathupalam padashekharam in Eraviperoor Panchayath of Aranmula constituency-General Civil Work
2026_Irrig_847402_1
IRR/IA/TR/1216/2025_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
240 days
Eraviperoor
Please see the tender documents
7 documents required · 7 mandatory
₹1,590
Yes
₹18,001
Yes
20 May 2026
13 Mar 2026
24 Mar 2026
13 Mar 2026
21 Mar 2026
13 Mar 2026
Side protection
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
60.2.1:EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1432071.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 2.40 MB
BOQ_1432071.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .