Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
23 Jan 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM (P AND P)
Projects and Planning PD Admin Building FACT Ltd Udyogamandal Complex Kochi - 683501.
Renewal of Converter 2nd bed outlet bellmouth, patch works/covering of Converter shell, super heater by pass duct, HE-I by pass duct,etc, in SO2 Acid Plant during ATA 2023.
2023_FACT_733134_1
3012/2022-2023/E26558
Limited
Miscellaneous Works
Item Rate
60 days
FACT UDYOGAMANDAL
This tender is issued on limited tender basis and offers shall be accepted from the vendors on whom the enquiry is issued. Vendors interested in getting our future enquiries may contact DGM Projects and Planning -UC FACT Udyogamandal
5 documents required · 5 mandatory
₹0
₹12,000
Yes
24 Jan 2023
5 Jan 2023
24 Jan 2023
5 Jan 2023
23 Jan 2023
5 Jan 2023
Converter 2nd bed outlet bellmouth works
Fabrication of Converter 2nd bed outlet bellmouth in SO2 Acid Plant. Material: SS304 H Plate Thickness: 6/8 mm Size of duct: 800 mm to 1000 mm
Dismantling of Converter 2nd bed outlet bellmouth in SO2 Acid Plant. Material: SS304 H Size of duct: 800 mm to 1000 mm
Erection of Converter 2nd bed outlet bellmouth in SO2 Acid Plant. Material: SS304 H Size of duct: 800 mm to 1000 mm
Patch works/Covering of following ducts and equipments in SO2 Acid Plant 1.) Converter shell at various areas. 2.) Any unforeseen patch works/covering of ducts/equipments in SO2 Acid Plant during ATA 2023. Material: MS/CS/BQ Plate thickness: 6/8 mm
Patch works/Covering of following ducts and equipments in SO2 Acid Plant. 1.) Super heater by pass duct. 2.) HE-I by pass duct. 3.) HE-I outlet duct connecting to superheater. 4.)Any unforeseen patch works/covering of ducts and equipments in SO2 Acid Plant during ATA 2023. Material: SS 304/SS 304 H Plate thickness: 6/8 mm
Fabrication,dismantling and erection of structural supports,frames,platform,etc, painting (primer and finish coat) in connection with renewal of converter 2nd bed outlet bellmouth in SO2 Acid Plant.
P T SEBASTIAN
TRINITY ENGINEERING SERVICES
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .