Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC | L1 | Accepted-AOC Accepted Vide Resolution No.2(1) dtd.13/01/2025 of Kanjikuzhy GP | |
| 2 | L2₹4.1 L+₹40,544.10 (11.1%)Rejected-AOC | L2 | Rejected-AOC Higher rate and hence not admitted |
Tender Value
₹3.4 L
EMD Value
₹8,447
Closing Date
6 Jan 2025, 3:00 pmClosed
Sini.S
office of the assistant engineer,kanjikuzhy gp
Annual Plan-Kanjikuzhy GP-2024-25-Construction of compound wall for panchayath office
2024_LSGD_720277_1
1/AE/LIDKKGP2024
Open Tender
Civil Works - Buildings
Item Rate
180 days
kankikuzhy GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹750
Yes
₹8,447
Yes
1 Mar 2025
28 Dec 2024
8 Jan 2025
28 Dec 2024
6 Jan 2025
28 Dec 2024
Amount
construction of compound wall
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
OD328242/2024-2025:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
50.6.1.5:Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
14.66.1:Finish walls with Acryllic Smooth exterior paint of required shade:Old work ( Two or more coats applied @ 1.67 ltr/10 sqm) on existing cement paint surface
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
SHAJILAL V (BID ID -2050172)
Bidder Name
SHAJILAL V
ABHILASH S
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1140310.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .