| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.8 LAccepted-AOC | ₹8.8 L Quoted ₹8.9 L | 1 | Accepted-AOC Agreement executed |
| 2 | 2₹8.9 L+₹572.11 (0.06%)Accepted-AOC THEKAKANASSERY HOUSE PERUMPADAPPU PIN 682006 | KOCHI | ERNAKULAM | KERALA | 682006 | ₹8.9 L+₹572.11 (0.06%) | 2 | Accepted-AOC Agreement executed |
| 3 | 3₹9.1 L+₹572.11 (0.06%)Accepted-AOC HIMAHIRANS POCHAKONAM EZHUKONE PO KOLLAM | ₹9.1 L+₹572.11 (0.06%) Quoted ₹8.9 L | 3 | Accepted-AOC Agreement executed |
Tender Value
₹8.1 L
EMD Value
₹20,269
Closing Date
26 Oct 2023, 5:00 pmClosed
Assistant.Executive Engineer
Office of the Assistant Executive Engineer, Harbour Engineering Sub Division Chellanam
GENERAL-Chellanam Fishing Harbour-Works for prevention of Encroachment in acquired land-General Civil Work
2023_HED_603563_2
HED/CEHED/TR/811/2023_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
90 days
Chellanam
Please refer Tender documents
8 documents required · 8 mandatory
₹1,790
Yes
₹20,269
Yes
9 Feb 2024
13 Oct 2023
28 Oct 2023
13 Oct 2023
26 Oct 2023
13 Oct 2023
13 Oct 2023 - 26 Oct 2023
Amount
Construction of Compound wall
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.48.1:Finishing with Deluxe Multi surface paint system for interiors and exteriors using primer as per manufacturers specifications:Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm
16.68:Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M - 30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge.
ROBIN BEVEIRA
Hiran mohan
Bidder Name
ROBIN BEVEIRA
Hiran mohan
profulan
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_916445.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .