Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L5₹41.8 L+₹11.1 L (36.0%)Accepted-AOC FLAT NO 101 UGF FRONT LHS RZ B 49A KAILASHPURI PALAM COLONY NEW DELHI 110045 | SOUTH WEST | DELHI | 110045 | L5 | Accepted-AOC being lowest | |
| 2 | L1₹30.7 LRejected-Finance | L1 | Rejected-Finance Non bonafide as per Sch A note No 21 on Ser Page No 16 of tender documents | |
| 3 | L2₹40.1 L+₹9.4 L (30.4%)Rejected-Finance G 86 DATA RAM SECTOR 18 ROHINI NEW DELHI DELHI 110085 | NORTH WEST DELHI | DELHI | 110085 | L2 | Rejected-Finance Non bonafide as per Sch A note No 21 on Ser Page No 16 of tender documents | |
| 4 | L3₹41.7 L+₹10.9 L (35.5%)Rejected-Finance 131 SHINGANAPUR ROAD KOLKI KOLKI SATARA MAHARASHTRA 415523 | SATARA | MAHARASHTRA | 415523 | L3 | Rejected-Finance Non bonafide as per Sch A note No 21 on Ser Page No 16 of tender documents | |
| 5 | L4₹41.8 L+₹11.1 L (36.0%)Rejected-Finance WZ 576 577 NANGAL RAYA NEW DELHI 110046 | NEW DELHI | NEW DELHI | DELHI | 110046 | L4 | Rejected-Finance Non bonafide as per Sch A note No 21 on Ser Page No 16 of tender documents |
Tender Value
₹45.6 L
EMD Value
₹91,240
Closing Date
1 Feb 2020, 6:00 pmClosed
GE (N) Delhi Cantt-10
GE (N) Delhi Cantt-10
MANNING AND OPERATION OF WATER SUPPLY INSTALLATIONS POWER HOUSES AT SHAKURBASTI AND HIRANKUDNA UNDER GE N DELHI CANTT 10
2020_MES_314225_1
GE/NORTH-08/2019-20
Open Tender
Manpower Supply
Item Rate
333 days
GE (N) Delhi Cantt-10
as per NIT
9 documents required · 9 mandatory
₹500
GE (N) Delhi Cantt-10
₹91,240
Yes
14 Feb 2020
13 Jan 2020
3 Feb 2020
13 Jan 2020
1 Feb 2020
25 Jan 2020
Amount
Manning & Operation of 11 KV Bulk receiving stn regularly along with HT circuit breakers operation of incoming and outgoing feeders, Transformers and LT distribution panel boards at 11 KV HT bulk Recieving Electric Service Sub-station / MES power house at Ord depot Shakurbasti by deploying tradesmen having adequate experience to handle E/M machinery of any type with one electrician in Each shift of 8 hrs, duration of three shift 06 .00 AM to 02.00 PM , 02.00PM to 10 .00 PM and 10.00pm to 6.00 am daily (including sunday & holiday) as specified and directed. (Total Electrician-03 Nos) The operator will maintain log book for installation and shall be responsible for keeping the area around the installation clean by cutting grass, green vegetation and keep neat and clean at installation campus attending emergency break down during add hours as required basis as per direction of Engr-in-charge. The installation required to be manned for eight hours per shift for the following elect eqpts :- (a) HT Switch gear with VCBs - 07 Nos (b) Transformer 200 KVA - 01 Nos. (c) Transformer 300 KVA - 02 No. (d) Transformer 630 KVA - 01 No. (e) LT Panels- 05 Nos.
Manning & Operation of 11 KV sub-station along with HT circuit breakers operation of incoming and outgoing feeders, Transformers and LT distribution panel boards at 11 KV Electric Sub-tation across railway crossing complex & RSSD Sub-stn at Ord depot Shakurbasti by deploying tradesmen having adequate experience to handle E/M machinery of any type with one electrician in Each shift of 8 hrs, duration of three shift 06 .00 AM to 02.00 PM , 02.00PM to 10 .00 PM and 10.00pm to 6.00 am daily (including sunday & holiday) as specified and directed. (Total Electrician-03 Nos) The operator will maintain log sheet for installation and shall be responsible for keeping the area around the installation clean by cutting grass, green vegetation and keep neat and clean at installation campus attending emergency break down during add hours as required basis as per direction. The installation required to be manned for eight hours per shift for the following elect eqpts :- (a) HT Switch gear with VCBs - 03 Nos (b) Transformer 200 KVA - 01 No. (c) Transformer 630 KVA - 01 No. (d) DG Set 160 KVA with LT Panel - 01 No. (e) LT Panels- 03 Nos.
Manning and Operation of 11 KV Bulk receiving stn regularly along with HT circuit breakers operation of incoming and outgoing feeders, Transformers and LT distribution panel boards at 11 KV HT Bulk Receiving Electric Sub-Station and new MAP Electric Sub-station at Hiran Kudna by deploying tradesmen having adequate experience to handle E&M machinery of any type with one electrician in each shift of 8 hrs duration of three shifts 06 .00 AM to 02.00 PM and 02.00PM to 10 .00 PM and 10.00pm to 6.00 AM daily (Including Sunday & Hoiday) as specified and directed by Engr-in-charge. (Total Electrician-03 Nos) The installations comprising the following:- (a) Transformer 400 KVA - 02 Nos. (b) HT Switch gear with VCBs - 04 Nos. (c) DG Set 400 KVA - 01 No. (d) LT Panels- 05 Nos. (e) Transformer 160 KVA -01 No for map accn (f) VCB -01 No for map accn In case of any break down, shut down or tripping of VCBs, immediately inform to JE/ Engineer-in-Charge w/o delay. (g) APFC panel 01 No for MAP Accn (h) LT electric panel 02 no for MAP Accn
Manning and Operation of 11KV Bulk receiving stn regularly along with HT circuit breakers operation of incoming and outgoing feeders, Transformers and LT distribution panel boards at 11 KV Electric Sub-Station at TRINETRA complex at Entity 'B' 61 WEU, Hirankudna by deploying tradesmen having adequate experience to handle E&M machinery of any type with one electrician in each shift of 8 hrs duration of three shifts 06 .00 AM to 02.00 PM and 02.00 PM to 10 .00 PM and 10.00pm to 6.00 AM daily (Including Sunday & Hoiday) as specified and directed by Engr-in-charge. (Total Electrician-03 Nos) The installations comprising the following:- (a) Transformer 315 KVA - 02 Nos. (b) HT Switch gear with VCBs - 03 Nos. (c) DG Set 320 KVA - 02 Nos. (d) LT Panels- 08 Nos. (e) Servo-controlled Voltage Stabiliser 320 KVA - 02 Nos. (g) APFC panel - 01 No
Note For Ser item No 01 to 04 The operator will maintain log sheet as directed. (i) In case of any break down, shut down or tripping of VCBs, Operator will immediately inform to JE/ Engineer-in-Charge w/o delay and sufficient staff should also be arranged by contractor for un-interrupted supply and nothing extra shall be paid on this account. (ii) Daily maintenance of Power House / Cleaning of all transformer room, VCB room and connected area shall be got cleaned by the contractor included in the above item rate. (iii) Normal maintenance of DG Sets like cleaning and checking of all accessories Battery and routine test as required. DG Set shall be operated time to time as on required basis and when electric supply goes off. (iv) The contractor shall be responsible to reinstate and make good at his own expense, the damage if any caused by his workmen etc, to existing buildings, E&M equipments, Machineries,Cables and connected accessories complete. (V) The contractor shall be provide the neccessary T&P and Safety equipemnts at installations as required at site. (vi) The operator shall be deployed qualified ITI technician of proper experience . (vii) For payment of minimum wages to the workers provisions shall be strictly followed by the contractor (viii) Log book records for each installation shall be supplied by the contractor after approval of format by GE / Engr-in-Charge / JE and record to be updated by the operator
Manning, maintenance of water supply pumping installation at Ord Depot Shakubasti all days including Sunday and holiday by deploying tradesmen having adequate experience to handle E/M machinery of any type by deploying one operator in each shift of 08 hours duration for two shift 06 : 00 AM to 02 : 00 PM and 02 : 00 PM to 10 : 00 PM daily to provide un-interupted water supply to the users as specified and directed by Engr-in-charge.consisting of the following :- (Total FGM-02 No) (f) The installation to be manned for the followings. (i) Pump set 40 HP - 02 Nos. (ii) Pump set 30 Hp - 01 No. (iii) LT Panel for Pump house- 01 No.
Note for Item No 6 (i) Operation of pump installation of any capacity and run the pump time to time as on required basis. (ii) Operating chlorination system as per requirment in order to get 1.00 PPM at pump house and 0.2 PPM at users end (iii) Operation of sluice valves at overhead reservoir to supply water to the users time to time twice in a day. (iv) Normal maint of Pumping sets and tightening nut bolt washer etc and cleaning all pump house room and connected area included in the rate of items. (v) The contractor shall be responsible to make good at his own expense, of the damage if any caused by his workmen etc., to existing buildings,E&M equipments, Machineries,Cables and connected accessories complete. (vi) The contractor shall be provide the neccessary T&P and Safety equipemnts at installations as required at site. (vii) The operator shall be deployed Skilled ITI technician and qualified tradesman of proper experience . (viii) For payment of minimum wages to the workers of each installtion shall be strictly adhered accordance labour law. (ix) Log book for records shall be supplied by the contractor after approval of format by GE / Engr-in-Charge / JE and record to be updated by the contracor.
Note for bidder:- 1. Security Deposit @ 10% of total quoted amount in addition to Performance Security @5% shall be deposited by the contractor within 30 days from acceptance of Contract. Ref Sch 'A' Note No 24 on page No 16. 2. Attention of bidder is invited to periodical variation in minimum wages as notified by Govt of India/State Govt (Whichever is more) from time to time, the rates quoted by bidder shall deemed to be inclusive of any such variation and the contractor shall pay the wages as notified by Govt during the execution of contract. No reimbursement would be admissible except for taxes directly related to contract value as covered under Special Condition 27.
NEETU TRADERS (INDIA)
Vishal Traders
Shiv Enterprises
HIND CONSTRUCTIONS
V r traders
Choice india
Powerlite Engineers
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .