Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | -26.01% | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.9 Cr+₹44.9 L (31.1%)Admitted-Finance | -3.00% | ₹1.9 Cr+₹44.9 L (31.1%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 Cr+₹52.7 L (36.5%)Admitted-Finance | +1.00% | ₹2.0 Cr+₹52.7 L (36.5%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical MASTAN DHARA BAFLAIZ TEHSIL SURANKOTE DISTRICT POONCH JAMMU AND KASHMIR | SURANKOTE | POONCH | JAMMU AND KASHMIR | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.9 Cr
EMD Value
₹3.9 L
Closing Date
10 Jul 2026, 4:00 pmClosed
SUPERINTENDING ENGINEER PWD (RnB) CIRCLE RAJOURI
O/O SUPERINTENDING ENGINEER PWD (RnB) CIRCLE RAJOURI
Upgradation of PWD Dak Bunglow Manjakote (Under NFB)
2026_PWDJK_313617_1
e-NIT No. 08 of 2026-27 Dated 25.06.2026
Open Tender
Civil Works
Percentage
180 days
Rajouri
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
SUPERINTENDING ENGINEER PWD (RnB) CIRCLE RAJOURI
₹3.9 L
1 Sept 2026
26 Jun 2026
11 Jul 2026
26 Jun 2026
10 Jul 2026
26 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | 12.23 | Cum | 1,458.45 | ₹17,836.84 |
| 2 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | - | Cum | 7,571.55 | - |
| 3 | Extra for brick work in super structure above plinth level upto floor V-level. | - | Cum | 1,455.65 | - |
| 4 | Providing and laying Reinforced Cement Concrete 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) in suspended floors, balconies, landings and staircase having upto 15° slope. excluding cost of centering and shuttering , all work upto floor V level | - | Cum | 9,821.85 | - |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Cold twisted bars | - | Kg | 123.2 | - |
| 0.0 | Centering and Shuttering including strutting, propping etc and removal of form work for mass concrete | - | - | - | - |
| 0.9 | Foundations, footings, bases for columns | 66.18 | Sqm | 286.35 | ₹18,950.64 |
| 0.0 | Suspended floors, roofs, landings, balconies and access platforms | - | Sqm | 718.2 | - |
| 0.9 | Lintel, beams, plinth beams, girders, bressumers and cantilevers | 50.27 | Sqm | 577.55 | ₹29,033.44 |
| 0.0 | Edges of slabs and breaks in floors and walls Under 20 cm wide | - | Metre | 262.2 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
BOQ_1015242.xls
BOQ • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .