| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹50.9 LAccepted-AOC | ₹50.9 L | 1 | Accepted-AOC lowest bidder |
| 2 | 2₹58.4 L+₹7.5 L (14.7%)Rejected-Finance | ₹58.4 L+₹7.5 L (14.7%) | 2 | Rejected-Finance higher bid |
| 3 | 3₹58.7 L+₹7.8 L (15.4%)Rejected-Finance | ₹58.7 L+₹7.8 L (15.4%) | 3 | Rejected-Finance higher bid |
| 4 | 4₹59.9 L+₹9.0 L (17.6%)Rejected-Finance | ₹59.9 L+₹9.0 L (17.6%) | 4 | Rejected-Finance higher bid |
| 5 | 5₹63.7 L+₹12.8 L (25.2%)Rejected-Finance | ₹63.7 L+₹12.8 L (25.2%) | 5 | Rejected-Finance higher bid |
| Sl No | Description | Qty | Unit | Balwant Singh Bora L7 | TIKA SINGH L4 | LALIT JOSHI L9 | M/s Kanyal Construction and Building Material L5 | NIKKU SIROLA L6 | KULDEEP SINGH DHANIK L3 | Ashok Mehta L2 | M/S NANDAN SINGH L1 | BORA CONSTRUCTION L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation for retaining & brest walls in all types of soils and rocks including lead, lift & disposal of surplus material as directedof E- in - C | 263 | Cum | 400.89 ₹1,05,434.07 | 277 ₹72,851 | 200 ₹52,600 Lowest | 333 ₹87,579 | 350 ₹92,050 | 367.81 ₹96,734.03 | 268 ₹70,484 | 318.5 ₹83,765.5 | 350 ₹92,050 |
| 2.00 | Stonemasonry in cement mortar for substructure complete as per drawing&technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In cement mortar (1:5) | 535 | Cum | 4,286.33 ₹22,93,186.55 | 4,162 ₹22,26,670 | 4,500 ₹24,07,500 | 4,200 ₹22,47,000 | 4,400 ₹23,54,000 | 3,933.3 ₹21,04,315.5 | 3,800 ₹20,33,000 | 3,405.98 ₹18,22,199.3 Lowest | 4,400 ₹23,54,000 |
| 3.00 | Providing and laying of wire crates 3.00x1.50x1.50 in size with a 10 gauge BWGGI wire conforming to IS: 280 & IS:4826 in 150mm x 150mm mesh laid with stone boulders weighing not less than 25 kg each. | 54 | Cum | 1,763.84 ₹95,247.36 | 1,671 ₹90,234 | 2,000 ₹1,08,000 | 1,800 ₹97,200 | 1,900 ₹1,02,600 | 1,618.14 ₹87,379.56 | 2,062 ₹1,11,348 | 1,401.2 ₹75,664.8 Lowest | 2,000 ₹1,08,000 |
| 4.00 | Cement plum masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P . required for proper completion of the work. | 108 | Cum | 3,957.25 ₹4,27,383 | 3,935 ₹4,24,980 | 4,000 ₹4,32,000 | 4,200 ₹4,53,600 | 4,200 ₹4,53,600 | 3,631.38 ₹3,92,189.04 | 3,400 ₹3,67,200 | 3,144.54 ₹3,39,610.32 Lowest | 4,200 ₹4,53,600 |
| 5.00 | Random Rubble Masonary laid dry in breast wall,retaining wall, parapets ,scupper etc engineer - in - charge Including supply of all materials,labour,t & p& royality etc,required for proper complition of work.(As per PWD Uttarakhand specifications ) | 282 | Cum | 2,139.84 ₹6,03,434.88 | 1,878 ₹5,29,596 | 2,000 ₹5,64,000 | 2,100 ₹5,92,200 | 1,900 ₹5,35,800 | 1,964.06 ₹5,53,864.92 | 2,100 ₹5,92,200 | 1,700.75 ₹4,79,611.5 Lowest | 2,000 ₹5,64,000 |
| 6.00 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls ,retaining walls, parapets, scuppers, etc.including supply of all material, labour, T&P and royaltiies etc. | 510 | Cum | 3,809.36 ₹19,42,773.6 | 3,742 ₹19,08,420 | 3,500 ₹17,85,000 | 3,950 ₹20,14,500 | 3,900 ₹19,89,000 | 3,494.35 ₹17,82,118.5 | 3,386 ₹17,26,860 | 3,025.88 ₹15,43,198.8 Lowest | 4,000 ₹20,40,000 |
| 7.00 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 pcc 1;3:6 hand mix | 32 | Cum | 5,868.77 ₹1,87,800.64 | 5,761 ₹1,84,352 | 6,000 ₹1,92,000 | 5,830 ₹1,86,560 | 5,500 ₹1,76,000 | 5,379.57 ₹1,72,146.24 | 6,000 ₹1,92,000 | 4,658.36 ₹1,49,067.52 Lowest | 6,000 ₹1,92,000 |
| 8.00 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 RCC Grade M 20 | 13 | Cum | 6,561.28 ₹85,296.64 | 6,447 ₹83,811 | 7,000 ₹91,000 | 6,525 ₹84,825 | 6,500 ₹84,500 | 6,020.58 ₹78,267.54 | 7,000 ₹91,000 | 5,213.44 ₹67,774.72 Lowest | 7,500 ₹97,500 |
| 9.00 | Supplying, fitting and placing TMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 1 | Tonne | 57,692.37 ₹57,692.37 | 57,324 ₹57,324 | 57,440.2 ₹57,440.2 | 65,000 ₹65,000 | 67,000 ₹67,000 | 52,900.09 ₹52,900.09 | 67,440.2 ₹67,440.2 | 45,808.08 ₹45,808.08 Lowest | 67,000 ₹67,000 |
| 10.00 | Backfilling behind abutment, wing wall and return wall complete as per drawings &technical specification Clause 1204.3.8 Granular material | 147 | Cum | 1,502.81 ₹2,20,913.07 | 351 ₹51,597 Lowest | 1,000 ₹1,47,000 | 750 ₹1,10,250 | 1,000 ₹1,47,000 | 1,377.8 ₹2,02,536.6 | 1,000 ₹1,47,000 | 1,193.1 ₹1,75,385.7 | 1,000 ₹1,47,000 |
Tender Value
Refer Docs
EMD Value
₹2.0 L
Closing Date
14 Mar 2026, 11:00 amClosed
Executive Engineer Irrigation Division Pithoragarh
Office of Executive Engineer Irrigation Division Pithoragarh
Renovation of Pantsera and Jamtari Minor damaged due to disaster in Block Kanalichina District Pithoragarh Under Nabard
2026_IRDCE_92097_1
10/EE/25-26 Dated 19-02-26
Open Tender
Civil Works - Canal
Item Rate
365 days
Kanalichina
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
Executive Engineer ID Pithoragarh
₹2.0 L
Yes
Pithoragarh
23 Jul 2026
21 Feb 2026
14 Mar 2026
21 Feb 2026
14 Mar 2026
22 Feb 2026
28 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation for retaining & brest walls in all types of soils and rocks including lead, lift & disposal of surplus material as directedof E- in - C | - | Cum | - | - |
| 2 | Stonemasonry in cement mortar for substructure complete as per drawing&technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In cement mortar (1:5) | - | Cum | - | - |
| 3 | Providing and laying of wire crates 3.00x1.50x1.50 in size with a 10 gauge BWGGI wire conforming to IS: 280 & IS:4826 in 150mm x 150mm mesh laid with stone boulders weighing not less than 25 kg each. | - | Cum | - | - |
| 4 | Cement plum masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P . required for proper completion of the work. | - | Cum | - | - |
| 5 | Random Rubble Masonary laid dry in breast wall,retaining wall, parapets ,scupper etc engineer - in - charge Including supply of all materials,labour,t & p& royality etc,required for proper complition of work.(As per PWD Uttarakhand specifications ) | - | Cum | - | - |
| 6 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls ,retaining walls, parapets, scuppers, etc.including supply of all material, labour, T&P and royaltiies etc. | - | Cum | - | - |
| 7 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 pcc 1;3:6 hand mix | - | Cum | - | - |
| 8 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 RCC Grade M 20 | - | Cum | - | - |
| 9 | Supplying, fitting and placing TMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | - | Tonne | - | - |
| 10 | Backfilling behind abutment, wing wall and return wall complete as per drawings &technical specification Clause 1204.3.8 Granular material | - | Cum | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
bidpantsera.pdf
Tender Documents • 3.33 MB
BOQ_109054.xls
BOQ • 0.39 MB
corrigendum.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .