Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.3 Cr Vertical Extension on Existing G Plus 4 floor Bharat Ratna Abdul Kalam Boys Hostel Building RCC framed Structure from 5th to 9th Floor completion of hostel rooms in all respects in 5th and 6th floors including water supply sanitary installations and drainage and construction of a fire escape lift with lobby from Ground floor to 9th floor and providing IEI and fans DBs UG cables earthing and lighting protection manual fire alarm system etc IIITDM Campus Kurnool AP | Vertical Extension on Existing G Plus 4 floor Bharat Ratna Abdul Kalam Boys Hostel Building RCC framed Structure from 5th to 9th Floor completion of hostel rooms in all respects in 5th and 6th floors including water supply sanitary installations and drainage and construction of a fire escape lift with lobby from Ground floor to 9th floor and providing IEI and fans DBs UG cables earthing and lighting protection manual fire alarm system etc IIITDM Campus Kurnool AP | ₹8.3 Cr | L1 | - |
| 2 | L2₹8.9 Cr+₹66.7 L (8.07%)Financial bid opened Vertical Extension on Existing G Plus 4 floor Bharat Ratna Abdul Kalam Boys Hostel Building RCC framed Structure from 5th to 9th Floor completion of hostel rooms in all respects in 5th and 6th floors including water supply sanitary installations and drainage and construction of a fire escape lift with lobby from Ground floor to 9th floor and providing IEI and fans DBs UG cables earthing and lighting protection manual fire alarm system etc IIITDM Campus Kurnool AP | Vertical Extension on Existing G Plus 4 floor Bharat Ratna Abdul Kalam Boys Hostel Building RCC framed Structure from 5th to 9th Floor completion of hostel rooms in all respects in 5th and 6th floors including water supply sanitary installations and drainage and construction of a fire escape lift with lobby from Ground floor to 9th floor and providing IEI and fans DBs UG cables earthing and lighting protection manual fire alarm system etc IIITDM Campus Kurnool AP | ₹8.9 Cr+₹66.7 L (8.07%) | L2 | Financial bid opened |
| 3 | L3₹9.0 Cr+₹77.2 L (9.34%) Vertical Extension on Existing G Plus 4 floor Bharat Ratna Abdul Kalam Boys Hostel Building RCC framed Structure from 5th to 9th Floor completion of hostel rooms in all respects in 5th and 6th floors including water supply sanitary installations and drainage and construction of a fire escape lift with lobby from Ground floor to 9th floor and providing IEI and fans DBs UG cables earthing and lighting protection manual fire alarm system etc IIITDM Campus Kurnool AP | Vertical Extension on Existing G Plus 4 floor Bharat Ratna Abdul Kalam Boys Hostel Building RCC framed Structure from 5th to 9th Floor completion of hostel rooms in all respects in 5th and 6th floors including water supply sanitary installations and drainage and construction of a fire escape lift with lobby from Ground floor to 9th floor and providing IEI and fans DBs UG cables earthing and lighting protection manual fire alarm system etc IIITDM Campus Kurnool AP | ₹9.0 Cr+₹77.2 L (9.34%) | L3 | - |
| 4 | L4₹10.1 Cr+₹1.8 Cr (22.1%) Vertical Extension on Existing G Plus 4 floor Bharat Ratna Abdul Kalam Boys Hostel Building RCC framed Structure from 5th to 9th Floor completion of hostel rooms in all respects in 5th and 6th floors including water supply sanitary installations and drainage and construction of a fire escape lift with lobby from Ground floor to 9th floor and providing IEI and fans DBs UG cables earthing and lighting protection manual fire alarm system etc IIITDM Campus Kurnool AP | Vertical Extension on Existing G Plus 4 floor Bharat Ratna Abdul Kalam Boys Hostel Building RCC framed Structure from 5th to 9th Floor completion of hostel rooms in all respects in 5th and 6th floors including water supply sanitary installations and drainage and construction of a fire escape lift with lobby from Ground floor to 9th floor and providing IEI and fans DBs UG cables earthing and lighting protection manual fire alarm system etc IIITDM Campus Kurnool AP | ₹10.1 Cr+₹1.8 Cr (22.1%) | L4 | - |
| 5 | - | - | - | - |
Tender Value
₹10.7 Cr
EMD Value
₹20.7 L
Closing Date
7 Jan 2026, 3:00 pmClosed
EE-Kurnool Central Division
Allada Sreenivasa Rao
O/o. Executive Engineer, Kurnool Central Division, CPWD, IIITDM Kurnool Campus, Jagannatha Gattu, G.
Vertical Extension on Existing G Plus 4 floor Bharat Ratna Abdul Kalam Boys Hostel Building RCC framed Structure from 5th to 9th Floor completion of hostel rooms in all respects in 5th and 6th floors including water supply sanitary installations and drainage and construction of a fire escape lift with lobby from Ground floor to 9th floor and providing IEI and fans DBs UG cables earthing and lighting protection manual fire alarm system etc IIITDM Campus Kurnool AP
137663
13/EE/KURNOOL/E-Tender/2025-2026(Recall)
OPEN
Civil Works - Buildings
ICB
300 days
Kurnool, Andhra Pradesh
9 documents required · 9 mandatory
₹20.7 L
O/o The Executive Engineer, CPWD office , IIIITDM Campus Kurnool AP 518008
7 Jan 2026
24 Dec 2025
7 Jan 2026
7 Jan 2026
30 Dec 2025
31 Dec 2025
stage.html
html • 0.07 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT+13+Tender+Notice+13+Recall+.pdf
document • 0.80 MB
NIT+13+Recall+Verticall+Extension.pdf
document • 12.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .