Loading…
Loading…
Tender Value
₹1.1 Cr
EMD Value
₹1.9 L
Closing Date
15 Oct 2026, 6:00 pm
CWE (AF) Secunderabad
CWE (AF) Secunderabad
SPECIAL REPAIR TO CERTAIN MD ACCN IN HAWK ENCLAVE AT AFS BIDAR
2026_MES_789898_1
85691/E8
Open Tender
Civil Works
Item Rate
270 days
GE (AF) Bidar
As per NIT
9 documents required · 9 mandatory
₹1,000
GE (AF) Bidar
₹1.9 L
Yes
17 Sept 2026
17 Sept 2026
17 Oct 2026
17 Sept 2026
15 Oct 2026
8 Oct 2026
17 Sept 2026 - 5 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Building Works B/R:-
Taking down chowkats or frames exc 1.5 sqm and n.exc 4.0 sqm each but with shutters (without taking off shutters from the frame), complete all as specified and as directed. | 56 | Each | 2.25 | ₹126 |
| 2 | Taking down chowkats or frames not exc 1.5 sqm each but with shutters (without taking off shutters from the frame), complete all as specified and as directed. | 48 | Each | 4.25 | ₹204 |
| 3 | Dismantling of Wall and ceiling boards (fibre, pulp, insulation, etc.) or insulation boards/slabs/ blankets, any thickness, including cover fillets complete all as specified and as directed. | 30.24 | Sqm | 5.25 | ₹158.76 |
| 4 | Demolition of cement concrete (un-reinforced) of any description and in any position not otherwise specifically provided for sub base for floor tiles, roof /chajja padding including removal of debris outside MD land, complete all as specified and as directed. | 75.5 | Cum | 6.25 | ₹471.88 |
| 5 | Dismantling floor, hearth or wall tiling including cement mortar bedding and removal of debris out of premises complete all as specified and as directed. | 1,076 | Sqm | 7.25 | ₹7,801 |
| 6 | Demolition of brickwork or stone/ PCC block masonary, built in cement mortar or cement lime mortar ccomplete all as specified and as directed. | 12 | Cum | 8.25 | ₹99 |
| 7 | Demolition of Reinforced Cement Concrete in Roofs, floors (other than ground floors), beams, staircases, landing, chajjas and similar suspended work at any height, complete all as specified and as directed. | 3.9 | Cum | 9.25 | ₹36.07 |
| 8 | Dismantling of structural steel work including iron railing, window grill, doors, gates but excluding framed truss etc., complete all as specified and as directed. | 2.5 | Qtl | 10.25 | ₹25.63 |
| 9 | Material and labour 25 mm thick plain cement concrete Type B-0, 1:2:4 (12.5 mm graded aggregate) as in sub base for floor tiles, complete all as specified and as directed. | 868 | Sqm | 13.25 | ₹11,501 |
| 10 | Material and labour for 35 mm thick factory made flush shutters, solid core construction, with particle board core and plywood face panels, commercial type on both sides and one face is covered with decorative face veneer with lipping/frame to match complete all as specified and as directed. | 108 | Sqm | 14.25 | ₹1,539 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
85691TENDERPDF.pdf
Tender Documents • 1.22 MB
BOQ_885469.xls
BOQ • 0.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .