| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 LAdmitted-Finance | ₹10.7 L | L1 | Admitted-Finance |
| 2 | L2₹13.0 L+₹2.3 L (21.1%)Admitted-Finance | ₹13.0 L+₹2.3 L (21.1%) | L2 | Admitted-Finance |
| 3 | L3₹18 L+₹7.3 L (68.1%)Admitted-Finance 611 B E BLOCK GREATER KAILASH 2 NEW DELHI 110048 | SOUTH EAST | DELHI | 110048 | ₹18 L+₹7.3 L (68.1%) | L3 | Admitted-Finance |
| 4 | L3₹18 L+₹7.3 L (68.1%)Admitted-Finance | ₹18 L+₹7.3 L (68.1%) | L3 | Admitted-Finance |
| 5 | L4₹19.0 L+₹8.3 L (77.4%)Admitted-Finance | ₹19.0 L+₹8.3 L (77.4%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | aakaar consultants L1 | Renaissance Arch Consultant Pvt Ltd L3 | Earth Foundation L4 | sarjan architects and project consultantss L3 | Arck Design Group L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | 1. Surveys, Investigations & Conceptual Planning: Conduct all necessary site surveys, including geological investigation of soil and rock, and collect requisite data from concerned departments. Prepare conceptual plans with multiple options, incorporating green building concepts as per Medical Health Society, Guidelines, and obtain the approval from the PWD Chief Architect and the client department. 2. Detailed Cost Estimation: Prepare BOQs, detailed cost estimates for Financial sanction, and all related documents. Submit in two (2) hard copies and soft copies (CD/pen drive) as required. 3. 3D Views: Prepare 3D views of the approved conceptual planning, including sufficient perspectives to clearly present the scheme. Finalize elevations and sections based on approved concepts. 4. Architectural & Structural Drawings: Finalize plans, elevations, and sections, 3D Views and prepare complete detailed working drawings. Provide earthquake-resistant structural designs as per SBC Report, with proof checking from IIT/NIT/Government Engineering Colleges at the consultant’s cost. 5. Services Drawings:Prepare allbuilding services drawings (electrical, sanitary, water supply, sewerage, computer networking, electrical substation, EPBX with telephone wiring, CCTV, solar system, fire fighting, and fire detection systems). 6. Site Supervision – To be carried out during Design/construction phase (estimated duration: 18 months) by visiting the site (limited up tomax of six visit’s) as directed by PWD officials. 7. As Built Drawings – Prepare as Built Drawings for the project | 1 | JOB | 10,71,000 ₹10,71,000 Lowest | 18,00,000 ₹18,00,000 | 18,99,999 ₹18,99,999 | 18,00,000 ₹18,00,000 | 12,96,820 ₹12,96,820 |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
18 Sept 2025, 6:00 pmClosed
EE PWD Dn. Amet
Amet
Architectural consultancy services for the Semi District Hospital (SDH) at Amet,in Distt.Rajsamand under PWD Division Amet
2025_CEPWD_494849_1
NIT No. 15/2025-26 EE PWD Dn. Amet
Open Tender
Consultancy
Item Rate
540 days
Amet
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Through Chalan
₹30,000
Yes
29 Sept 2025
18 Aug 2025
19 Sept 2025
18 Aug 2025
18 Sept 2025
18 Aug 2025
Amount
1. Surveys, Investigations & Conceptual Planning: Conduct all necessary site surveys, including geological investigation of soil and rock, and collect requisite data from concerned departments. Prepare conceptual plans with multiple options, incorporating green building concepts as per Medical Health Society, Guidelines, and obtain the approval from the PWD Chief Architect and the client department. 2. Detailed Cost Estimation: Prepare BOQs, detailed cost estimates for Financial sanction, and all related documents. Submit in two (2) hard copies and soft copies (CD/pen drive) as required. 3. 3D Views: Prepare 3D views of the approved conceptual planning, including sufficient perspectives to clearly present the scheme. Finalize elevations and sections based on approved concepts. 4. Architectural & Structural Drawings: Finalize plans, elevations, and sections, 3D Views and prepare complete detailed working drawings. Provide earthquake-resistant structural designs as per SBC Report, with proof checking from IIT/NIT/Government Engineering Colleges at the consultant’s cost. 5. Services Drawings:Prepare allbuilding services drawings (electrical, sanitary, water supply, sewerage, computer networking, electrical substation, EPBX with telephone wiring, CCTV, solar system, fire fighting, and fire detection systems). 6. Site Supervision – To be carried out during Design/construction phase (estimated duration: 18 months) by visiting the site (limited up tomax of six visit’s) as directed by PWD officials. 7. As Built Drawings – Prepare as Built Drawings for the project
Arck Design Group (BID ID -3276803)
sarjan architects and project consultantss (BID ID -3279125)
Renaissance Arch Consultant Pvt Ltd (BID ID -3281939)
Earth Foundation (BID ID -3282088)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .