| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.9 LAccepted-Finance | ₹32.9 L | L1 | Accepted-Finance OK |
| 2 | L2₹35.8 L+₹2.9 L (8.82%)Accepted-Finance | ₹35.8 L+₹2.9 L (8.82%) | L2 | Accepted-Finance OK |
| 3 | L3₹39.0 L+₹6.0 L (18.4%)Accepted-Finance 104 JASH APARTMENT NEAR LAXMI NARYAN MANDIR MAHIM ROAD PALGHAR TAL PALGHAR DIST THANE 401404 | PALGHAR | THANE | MAHARASHTRA | 401404 | ₹39.0 L+₹6.0 L (18.4%) | L3 | Accepted-Finance OK |
Tender Value
₹39.8 L
EMD Value
₹39,800
Closing Date
21 Aug 2026, 5:00 pmClosed
Superintending Engineer Mumbai HQ
Office of the Superintending Engineer, Mumbai, MIDC, Udyog Sarathi, Mahakali Caves Road, Andheri East, Mumbai- 93.
M and R to Roads in Tarapur Industrial Area... Filling potholes by asphaltic treatment in Tarapur Industrial Area.
2026_MIDC_1326734_1
MIDC_Filling potholes by asphaltic treatment in TIA...EC_39,75,023
Open Tender
Support/Maintenance Service
Percentage
180 days
Tarapur Industrial Area
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,030
₹39,800
4 Sept 2026
10 Aug 2026
25 Aug 2026
10 Aug 2026
21 Aug 2026
10 Aug 2026
10 Aug 2026 - 11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Picking the road surface including sectioning etc. complete (BT surface.) | 2,850 | Square Meter | 44 | ₹1,25,400 |
| 2 | Providing and constructing 75 mm. thick Modified Penetraction Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone layers metal 30% crusher broken metal + 70% Hand broken metal (By breaking Rubble obtained by blasting) , heating and spraying the bitumen of VG-30 grade @ 2 kg / sqm , spreading 12mm.size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc.complete, including applying tack coat of VG 10 grade bitumen at the rate of 0.30 Kg Sqm. on existing bitumen surface. ( For Repair works only) | 720 | Square Meter | 415 | ₹2,98,800 |
| 3 | BITUMINOUS MACADAM:--Providing and laying bituminous macadam using crushed aggregate of Grading 1, premixed with bituminous binder, transported at site with VTS, laid over a previously prepared surface , finished to the required grade ,level, alignment,and rolling to achieve the desired density for 80/100 mm compacted thickness with drum mix type hot mix plant with SCADA having complying essential features of Hot mix plant as per IRC-27 2009 specified conditions and attachments such as electronic load sensor based belt conveyers,automatic synchronization of bitumen and aggregate fedder,built in dust controller system and PLC for Drum Mix plant ,Sensor paver,and Vibratory roller excluding prime/Tack coat etc. complete --Bitumen 3.30% of specified grade (VG-30 bulk bitumen rates are considered to arrive at rates) | 214 | Cubic Meter | 8,247 | ₹17,64,858 |
| 4 | DENSE BITUMINOUS MACADAM: Proving and laying dense bituminous macadam using crushed aggregates of Grading 1, premixed with bituminous binder of specified grade of Bitumen @ 4.50 per cent by weight of total mix and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired density for 76-100 mm compacted thickness .USING Batch mix type hot mix plant with SCADA, Sensor Paver, Vibratory roller with Stone Dust filler.(VG-30 bulk bitumen rates are considered to arrive at rates) | 57 | Cubic Meter | 10,749 | ₹6,12,693 |
| 5 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 kg/10 sqm.(VG-30 bulk bitumen rates are considered to arrive at rates) | 6,128 | Square Meter | 18 | ₹1,10,304 |
| 6 | BITUMINOUS CONCRETE:--Providing and laying bituminous concrete using crushed aggregate of grading 1, premixed with bituminous binder @5.40% by weight of total mix and filler, transported at site with VTS, laid over a previously prepared surface, finished to the required grade ,level, alignment, and rolling to achieve the desired density for 50mm compacted thickness with drum mix plant with SCADA, Sensor paver and Vibratory roller excluding prime/Tack coat etc. complete --Bitumen of specified grade with stone dust filler. (VG-30 bulk bitumen rates are considered to arrive at rates) | 82 | Cubic Meter | 11,774 | ₹9,65,468 |
| 7 | Testing
BITUMEN: Job Mix Design with all Tests on aggregate (Excluding bitumen) for DBM/SDBC/AC/SMA (Stone Mastic Ashphalt) ( Testing of Bitumen shall be seperately Charged) | 3 | 1 Mix Design | 32,500 | ₹97,500 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.57 MB
TenderDocument.pdf
Tender Documents • 0.38 MB
ItemSpecification.pdf
Additional Documents • 0.02 MB
Drawing.pdf
Other Document • 0.76 MB
BOQ_2272087.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .