Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.8 LAccepted-Finance | ₹48.8 L | L1 | Accepted-Finance Bid ok. |
| 2 | L2₹49.0 LAccepted-Finance | ₹49.0 L | L2 | Accepted-Finance Bid ok. |
| 3 | L3₹49.1 LAccepted-Finance | ₹49.1 L | L3 | Accepted-Finance Bid ok. |
| 4 | L4₹49.1 LAccepted-Finance 29 108 A STREET NO 10 VISHWAS NAGAR DELHI 110032 | DELHI | SHAHDARA | DELHI | 110032 | ₹49.1 L | L4 | Accepted-Finance Bid ok. |
| 5 | L5₹49.4 LAccepted-Finance 27 19 F F D BLOCK CHATTARPUR EXTN SOUTH WEST DELHI DELHI 110075 | SOUTH WEST DELHI | DELHI | 110075 | ₹49.4 L | L5 | Accepted-Finance Bid ok. |
| Sl No | Description | Qty | Unit | A N BUILDERS L3 | Hi Tech Builder L1 | R.D Builders L2 | KULWANT SINGH L5 | Swastik Builders L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in trenches n.exc. 1.5 M wide and 1.5M deep and getting out, returning filling in, including spreading & leveling in layers all as specified in MES SSR 2020. | 20 | Per Cum | 207.65 ₹4,153 | 223 ₹4,460 | 178.77 ₹3,575.40 | 188 ₹3,760 | 197 ₹3,940 |
| 2.01 | M/L PCC bed 1:5:10 in fillings & Mass concrete all as specified in MES SSR 2020. | 25 | Per Cum | 3,325 ₹83,125 | 3,318 ₹82,950 | 3,266 ₹81,650 | 3,430 ₹85,750 | 3,472 ₹86,800 |
| 2.02 | M/L RCC work 1:1½:3 for slabs supported on walls, columns , roofs, landing, balconies, canopies deck slabs and in shelves and the like all as specified in MES SSR 2020. Note: Only OPC cement will be used for all RCC Works. | 70 | Per Cum | 7,590 ₹5.3 L | 7,383 ₹5.2 L | 7,471 ₹5.2 L | 7,320 ₹5.1 L | 7,405 ₹5.2 L |
| 2.03 | M/L RCC work 1:1½ :3 for foundation including raft footing foundation beams plinths beams bases for columns basement slabs under reamed piles and mass concrete and the like all as specified in MES SSR 2020. Note : Only OPC cement will be used for all RCC Works. | 20 | Per Cum | 6,420 ₹1.3 L | 6,353 ₹1.3 L | 6,478 ₹1.3 L | 6,229 ₹1.2 L | 6,280 ₹1.3 L |
| 3.01 | Providing and laying autoclaved aerated cement blocks masonry with 150 mm/230mm/300mm thick AAC blocks in superstructure above plinth level up to floor V level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar all complete as per direction of Engineer-in-charge. (The payment of RCC band and reinforcement shall be made for separately. | 20 | Per Cum | 6,691 ₹1.3 L | 6,840 ₹1.4 L | 6,645 ₹1.3 L | 6,981 ₹1.4 L | 6,790 ₹1.4 L |
| 3.02 | M/l brickwork with fly ash brick straight or curved on plan exe. 6m mean radius with designation 75 bricks all as specified in MES SSR 2020. | 60 | Per Cum | 5,993 ₹3.6 L | 6,228 ₹3.7 L | 6,341 ₹3.8 L | 6,073 ₹3.6 L | 6,185 ₹3.7 L |
| 4.00 | M/L screed 15-20 mm thick in C. mortar 1:4 for laying of marble/tiles all specified in MES SSR 2020. | 200 | Per Sm | 235.25 ₹47,050 | 198 ₹39,600 | 238 ₹47,600 | 224 ₹44,800 | 242 ₹48,400 |
| 5.00 | S/F Ist class hardwood, Plain, solid, straight chowkats and frames, wrought, framed rebated on the solid rounded or chamfered, put together with glue pinned at joints, supplied and fixed all as specified in MES SSR 2020. | 0.25 | Per Cum | 2,08,695 ₹52,173.75 | 1,98,478 ₹49,619.50 | 1,89,630 ₹47,407.50 | 2,01,430 ₹50,357.50 | 2,03,859 ₹50,964.75 |
| 6.00 | S/F of 8 mm thick toughened glass door complete with handle, L-connector, D-seal, rubber etc complete all as specified. | 300 | Per Sft. | 372 ₹1.1 L | 423 ₹1.3 L | 391 ₹1.2 L | 415 ₹1.2 L | 365 ₹1.1 L |
| 7.00 | Use & waste of formwork to soffits of suspended slabs such as roof slabs, floor slabs, Columns, beams, landings and similar work, not exceeding 200mm thick (Horizontal or sloping)fair finished surface all as specified in MES SSR 2020. | 600 | Per Sm | 473 ₹2.8 L | 458 ₹2.7 L | 440 ₹2.6 L | 528 ₹3.2 L | 508 ₹3.0 L |
Tender Value
₹48.6 L
EMD Value
₹98,000
Closing Date
15 Apr 2026, 5:00 pmClosed
Chief Executive officer.
229, Race Course Road, Cantonment Board office, Ambala Cantt.
As per the tender document.
2026_DGDE_759115_1
ACB/AE/TDR/2026/01/02
Open Tender
Civil Works - Others
270 days
Ambala Cantt
As per the tender document.
3 documents required · 3 mandatory
₹1,500
Chief Executive officer
₹98,000
18 Apr 2026
6 Apr 2026
16 Apr 2026
6 Apr 2026
15 Apr 2026
9 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Earth work in excavation in trenches n.exc. 1.5 M wide and 1.5M deep and getting out, returning filling in, including spreading & leveling in layers all as specified in MES SSR 2020. | ||||||
| 2.01 | M/L PCC bed 1:5:10 in fillings & Mass concrete all as specified in MES SSR 2020. | - | Per Cum | - | - | BI01010001010000000000000515BI0100001115 |
| 2.02 | M/L RCC work 1:1½:3 for slabs supported on walls, columns , roofs, landing, balconies, canopies deck slabs and in shelves and the like all as specified in MES SSR 2020. Note: Only OPC cement will be used for all RCC Works. | - | Per Cum | - | - | BI01010001010000000000000515BI0100001116 |
| 2.03 | M/L RCC work 1:1½ :3 for foundation including raft footing foundation beams plinths beams bases for columns basement slabs under reamed piles and mass concrete and the like all as specified in MES SSR 2020. Note : Only OPC cement will be used for all RCC Works. | - | Per Cum | - | - | BI01010001010000000000000515BI0100001117 |
| 3.01 | Providing and laying autoclaved aerated cement blocks masonry with 150 mm/230mm/300mm thick AAC blocks in superstructure above plinth level up to floor V level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar all complete as per direction of Engineer-in-charge. (The payment of RCC band and reinforcement shall be made for separately. | - | Per Cum | - | - | BI01010001010000000000000515BI0100001118 |
| 3.02 | M/l brickwork with fly ash brick straight or curved on plan exe. 6m mean radius with designation 75 bricks all as specified in MES SSR 2020. | - | Per Cum | - | - | BI01010001010000000000000515BI0100001119 |
| 4M/L screed 15-20 mm thick in C. mortar 1:4 for laying of marble/tiles all specified in MES SSR 2020. | ||||||
| 5S/F Ist class hardwood, Plain, solid, straight chowkats and frames, wrought, framed rebated on the solid rounded or chamfered, put together with glue pinned at joints, supplied and fixed all as specified in MES SSR 2020. | ||||||
| 6S/F of 8 mm thick toughened glass door complete with handle, L-connector, D-seal, rubber etc complete all as specified. | ||||||
| 7Use & waste of formwork to soffits of suspended slabs such as roof slabs, floor slabs, Columns, beams, landings and similar work, not exceeding 200mm thick (Horizontal or sloping)fair finished surface all as specified in MES SSR 2020. | ||||||
stage.html
html • 0.05 MB
technical_850276.pdf
techsummary_850276.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
BOQ_850276.xls
BOQ • 0.32 MB
docmenttender.pdf
Tender Documents • 1.36 MB
Download all tender documents and submit your bid