Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.1 L
Closing Date
17 May 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AGE (I) (AF) Bhowali
AGE (I) (AF) Bhowali
Job order for soil investigation in r/o provn of operations related work services at LKT at AF station Bhowali
2022_MES_523706_1
3000/05/E3
Limited
Job Works
Item Rate
30 days
Lariakanta, Bhowali
Ref tender documents
2 documents required · 2 mandatory
₹0
Exempted
19 May 2022
12 May 2022
19 May 2022
12 May 2022
17 May 2022
12 May 2022
12 May 2022 - 17 May 2022
60 days
Amount
Drilling of 75/150 mm diameter bore hole by mechanical boring all types of soils as per depth indicated below or refusal strata whichever is earlier as per instructions of the Engineer-in-Charge. Refusal defined as and when ‘N’ value is 100 or more for 30 cm or part penetration. 1.No of Site =1 No 2.No of bore Holes = 6 No 3. Depth of each bore hole = 6 M
Conducting standard penetration test (SPT) in the boreholes at 1.0m intervals in depth or every change of strata which ever is earlier as per IS 2131-1981.
a) For Depth up to 06 Mtr (For Bldg with shallow foundation) b) Collecting disturbed soil sample from the location of conducting the SPT/DCPT c) Collecting undisturbed samples at 1.50m intervals or change of strata which ever occurs earlier. d) Analysis for liquefaction potential for Earthquake as per Zone – IV of IS :1893-2016 (Part-1) e) Recording the Ground Water Table if observed upto exploration depth, as per IS : 6395:1973. f) Conducting all necessary laboratory tests on samples collected for their different engineering properties. Following tests will be carried out.
I). Dry density and moisture content (IS 2720 Part – 2 & 29) II). Atterberg’s limit – (IS 2720 Part – 5 1985) III). Particle size analysis – (IS 2720 Part-4 1985) & IS Classification of the soil. IV) Specific gravity – (IS 2720 Part – 3/sec 2 1980) V) Consolidation test – (IS 2720 Part – 15 1986) and compressed value index. VI) Free sweel and Swell pressure test – (IS 2720 Part – 40 1977, Part – 41 1977) VII) Bulk Density. VIII) Organic matter in soil if any. IX) Triaxial compression test and determination of (C&ø Value) shear parameters as per relevant IS. X) Harmful salt.
a) Submission of Four copies of ink signed test reports. The report should include the following: b) Detailed description of field investigation, soil classification and general nature of soil strata, water table, interpretation of test results, grains size distribution curves, compressive index curves, site plan etc, stress-strain modulus (by stress-strain curves from triaxial tests), Foundation analysis & recommendations with supporting calculations regarding foundation system, depth of foundation. c) The SBC of the soil is required to be given as per following table, calculation of bearing capacity will be governed generally as per IS 8009 (Part-i) 1976, IS 2720 (P-II) 1980, IS 6403-1980, IS 1904-1986 & 1080-1985 and other relevant IS codes and detailed calculations duly showing the various soil parameters / indices shall be given in the soil report :- Description of foundation Safe bearing capacity of soil in T/M2 for footing size Strip footing 1.2mx 1.2m 1.5mx 1.5m 2m x 2m 2.5m x 2.5m Remarks 1 m 1.5 m 2.0 m 2.5 m d) Plotting of a compiled sub-surface profile along the depth in both plan directions. e) Estimation of safe side slopes for excavation.
a) Suitability of excavated material as back fill. b) To check for liquefaction potential. c) Any other pertinent information relating of foundation design considered necessary. d) Soil investigation report shall include a detailed site plan showing the approx location of each bore duly numbered as per log of the bore holes should be enclosed. Location of foundation of adjacent structures, especially those that might be impact by the proposed construction should be indicated with details in site plan.
a) Photographic record of ge-explorations as well as testing shall also form part of the report. b) Every page of the soil investigation report should have the Name of the Job which soil investigation is being carried out. In case of multiple sites of a single job are being investigated name of each site shall be put on each page of report pertaining to the site. c) All pages of the Soil Investigation Report shall be serially numbered, stamped and signed by the Agency carrying out the Soil Investigation Report should be scrutinized by GE & CWE for correctness & endorsed. d) The AGE(I) shall intimate the approximate type of construction, utilization and dimensions of proposed building to the consultant, who based on geotechnical investigation, should recommend type of foundation (viz isolated/combined footing, raft, pile etc). e) In case of underground building basement construction, or if requirement of temporary / permanent deep excavation support measures during construction of building are envisaged necessary excavation support measures to be given by the consultant based on geotechnical investigations.
Carrying out topographical survey works using total station for area (55 x 20 m) Area = 1453.00 Sqm (a) Surface dressing n exc 15 cm deep incl cutting of bushes etc and removal of rubbish at a distance of 50 mtr from site. (b) Surveying and preparing level sheet at a grid of 2.0 mtrX 2 mtr interval and contour plan with 0.50 contour interval. (c) Superimposing of proposed Bldg on level sheet maintaining the specific distances from existing structures. (d) Level sheet book shall be submitted in booklet from 4 sets. (e) Submission of drawings bounded spirally including soft copy 4 sets NOTE 1 Soil investigation for ordinary rock or hard rock type soil shall be done as specified in IS – 12070 -1987 Table – I. NOTE 2 CBR test shall be done as per IS-2720 part 16 and guidelines issued by HQ CE Allahabad Zone as per requirement. NOTE 3 The sample BOQ is for general guidance only. The executive may amended the BOQ as per their requirement with proper justifications.
Research and Engineer Enterprises
Shree Hari Test House
stage.html
html • 0.02 MB
finance_585247.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .