| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6 LAccepted-AOC | L1 | Accepted-AOC Rates quoted were the lowest, hence tender was allotted | |
| 2 | L2₹6.2 L+₹20,000 (3.33%)Rejected-Finance | L2 | Rejected-Finance Rates quoted were higher, hence tender was not allotted | |
| 3 | L3₹6.3 L+₹35,000 (5.83%)Rejected-Finance | L3 | Rejected-Finance Rates quoted were higher, hence tender was not allotted | |
| 4 | L4₹6.6 L+₹60,000 (10.0%)Rejected-Finance | L4 | Rejected-Finance Rates quoted were higher, hence tender was not allotted |
Tender Value
Refer Docs
Closing Date
27 Jul 2020, 5:00 pmClosed
MD, Gohana Sugar Mills, Ahulana
Gohana Sugar Mills, Ahulana
Tender for Jobwork - Unloading and Shifting of Lime and Sulphur from Godowns to various stations during Season 2020-21
2020_HBC_136280_1
145/14-GohanaSM- UnloadingShiftingLimeSulphur
Open Tender
Miscellaneous
Works
90 days
Gohana Sugar Mills, Ahulana
Please refer Tender documents.
2 documents required · 2 mandatory
₹320
Ch. Devilal Cooperative Sugar Mills Ltd., Gohana
Exempted
2 Jan 2021
18 Jul 2020
28 Jul 2020
18 Jul 2020
27 Jul 2020
18 Jul 2020
Amount
Labour Rate Contract for Loading Unloading of Lime Sulphur & Other Chemicals
Unloading of Lime and Sulphur from the trucks and same to be stacked in the respective godowns.
Shifting of Lime and Sulphur from godown to working station at first floor of the boiling house.
Preparation of Lime Slurry (M.O.L.) and filling of Sulphur in furnace in all Shifts as and when required in the process.
Removal of Lime grit from chute of lime clarifier and shifting of grit to the designated place.
Shifting of Sulphur from Sulphur Godowns to Suphur Farnace in Boiling House and filling of the same in the melter as per requirement
Cleaning of Sulphur furnace as and when required in the process.
Cleaning of SO2 gas pipe lines as and when required in the process.
Cleaning of Juice Sulphitor and Syrup Sulphitor as and when required in the process during the season.
Addition of Lime in Spray Pond and removal of foam / garbage from channels.
Cleaning of Grit Pot of Lime Impurity Separator System in each shift and removal of the same to the desired place all the pits and drains to be cleaned.
Shifting of all chemicals like heavy chemicals and process chemicals from general store of the mills to the various stations of boiling house as and when required in the process throughout 24 hrs. during the crushing season 2020-21
At the time of tube cleaning of evaporator bodies and Pan’s, the required materials are to be shifted to various bodies and filling of the chemicals in the bodies of evaporators and Pan’s as and when required during the process.
SATISH CONTRACTOR
R K CHAUDHARY FABRICATOR AND ENGINEERING WORKS
KAMAL KUMAR CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .