| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 CrAccepted-Finance | L1 | Accepted-Finance Financially qualify | |
| 2 | L2₹6.4 Cr+₹1.7 L (0.26%)Rejected-Finance 14 NAVYUG ENCLAVE INDIRAPURAM PHASE 3 DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | L2 | Rejected-Finance Financially disqualify | |
| 3 | L3₹6.4 Cr+₹2.1 L (0.32%)Rejected-Finance UTTAR KASHI | UTTARAKHAND | 249128 | L3 | Rejected-Finance Financially disqualify |
| Sl No | Description | Qty | Unit | M/S Kumar Construction L2 | M/s Shree Ram Construction L1 | HIND CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead For thickness of tiles 10 mm to 25 mm | 5,506.93 | Sqm | 85 ₹4,68,089.05 Lowest | 85 ₹4,68,089.05 Lowest | 85 ₹4,68,089.05 Lowest |
| 2.00 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:4:8 or leaner mix (including equivalent
design mix) | 214.38 | Cum | 1,742 ₹3,73,449.96 | 1,737 ₹3,72,378.06 Lowest | 1,744 ₹3,73,878.72 |
| 3.00 | Demolishing dry brick pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material within 50 metres lead : | 214.38 | Cum | 1,527 ₹3,27,358.26 | 1,523 ₹3,26,500.74 Lowest | 1,528 ₹3,27,572.64 |
| 4.00 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 8,494.52 | Sqm | 63 ₹5,35,154.76 Lowest | 63 ₹5,35,154.76 Lowest | 63 ₹5,35,154.76 Lowest |
| 5.00 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area 3 sq. metres and below | 360 | each | 426 ₹1,53,360 | 424 ₹1,52,640 Lowest | 426 ₹1,53,360 |
| 6.00 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In lime mortar | 563.92 | Cum | 987 ₹5,56,589.04 | 984 ₹5,54,897.28 Lowest | 987 ₹5,56,589.04 |
| 7.00 | Renewing bottom rail and/or top runner of collapsible gate including making good all damages and applying priming coat of zinc chromate yellow primer of approved brand and manufacturer. Collapsible gate | 159.2 | Kg | 346 ₹55,083.2 | 345 ₹54,924 Lowest | 347 ₹55,242.4 |
| 8.00 | Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge 50 mm average thickness | 1,058.99 | Sqm | 297 ₹3,14,520.03 | 296 ₹3,13,461.04 Lowest | 297 ₹3,14,520.03 |
| 9.00 | Cleaning of exposed concrete surface of sticking material including loose and foreign material by sand blasting with coarse sand followed by and including cleaning with oil free air blast as per direction of Engineer in charge. | 1,058.99 | Sqm | 443 ₹4,69,132.57 | 442 ₹4,68,073.58 Lowest | 443 ₹4,69,132.57 |
| 10.00 | Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer In-charge complete in all respect SBR Polymer (@10% of cement weight) modified cementitious bond coat @ 2.2 kg cement per sqm of surface area mixed with specified proportion of approved polymer | 1,227.35 | Sqm | 164 ₹2,01,285.4 | 163 ₹2,00,058.05 Lowest | 164 ₹2,01,285.4 |
Tender Value
₹6.9 Cr
EMD Value
₹13.9 L
Closing Date
19 Nov 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GM(T)
UKKUVB, Rudrapur
Renovation work of Main Building, B.Ed. and PG Block and Drainage work at Govt. PG College, Khatima (U.S. Nagar)
2026_UAPMB_100746_2
e-nivida-819/2026
Open Tender
Civil Works
Item Rate
450 days
Khatima (U.S. Nagar)
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
GM(T), UKKUVB, Rudrapur
₹13.9 L
23 Nov 2026
13 Nov 2026
19 Nov 2026
13 Nov 2026
19 Nov 2026
13 Nov 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead For thickness of tiles 10 mm to 25 mm | 5,506.93 | Sqm | - | - |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:4:8 or leaner mix (including equivalent
design mix) | 214.38 | Cum | - | - |
| 3 | Demolishing dry brick pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material within 50 metres lead : | 214.38 | Cum | - | - |
| 4 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 8,494.52 | Sqm | - | - |
| 5 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area 3 sq. metres and below | 360 | each | - | - |
| 6 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In lime mortar | 563.92 | Cum | - | - |
| 7 | Renewing bottom rail and/or top runner of collapsible gate including making good all damages and applying priming coat of zinc chromate yellow primer of approved brand and manufacturer. Collapsible gate | 159.2 | Kg | - | - |
| 8 | Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge 50 mm average thickness | 1,058.99 | Sqm | - | - |
| 9 | Cleaning of exposed concrete surface of sticking material including loose and foreign material by sand blasting with coarse sand followed by and including cleaning with oil free air blast as per direction of Engineer in charge. | 1,058.99 | Sqm | - | - |
| 10 | Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer In-charge complete in all respect SBR Polymer (@10% of cement weight) modified cementitious bond coat @ 2.2 kg cement per sqm of surface area mixed with specified proportion of approved polymer | 1,227.35 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
doc.pdf
Tender Documents • 1.51 MB
BOQ_120558.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .