Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹41.8 Laccepted-aoc | ₹41.8 L | accepted-aoc |
Tender Value
₹41.8 L
EMD Value
₹83,650
Closing Date
25 May 2026, 10:30 pmClosed
Rural Drinking Water and Sanitation Department
Vinod AE
Drilling of Borewell & Providing pipeline at Yernalli, Malegaon, Kannalli, Gadgi, Solpur, Janwada, Aliamber, Kangti, Benaknalli and Hamilapur villages in Bidar taluka
RWSSD/2026-27/WS/WORK_INDENT10075
RWSSD/2026-27/WS/WORK_INDENT10075
Open
Water supply/sewage lines
Two Tender Document System(Two Cover)
RWSSD Division Office Bidar
7 documents required · 7 mandatory
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
Proposals for subcontracting components of works amounting to more than 20% of the contract price (for each, the qualifications and experience of the identified sub-contractor in the relevant fields should be attached)
To qualify for award of this contract, Each tenderer in his name should have in the last five year i.e, 2020-21 to 2024-25 b) Satisfactorily completed, as prime contractor, at least 8 Bore well drilled attach certificate by not below rank of Executive Engineer
Valid Registration Details
List of works for which tenders already submitted
Banker Details
List of existing commitments and ongoing work
Total value of civil engineering works executed and payments received in the last five years (year wise)
To qualify for award of this contract, Each tenderer in its name should have in the last five year i.e, 2020- 21 to 2024-25) a) Achieved in at least two financial years an average annual financial turnover not less than twice of the amount put to tender attach certificated from C.A. on letter head
Unconditional Line of credit Rs 30% of the Amount put to tender should be enclosed from Nationalized/scheduled bank
The Tenderer shall have Own BW drilling rig with valid license for drilling the BW and 7A certificate issued by the Karnataka ground water authority (Insurance and RC book of the Rig)
₹1,050
₹83,650
25 May 2026
16 May 2026
26 May 2026
22 May 2026
PÀ£ÁðlPÀ ¸ÀPÁðgÀ
UÁæ«ÄÃt PÀÄrAiÀÄĪÀ ¤ÃgÀÄ ªÀÄvÀÄÛ £ÉʪÀÄð®å E¯ÁSÉ
PÁAiÀÄð¤ªÁðºÀPÀ C©üAiÀÄAvÀgÀgÀ PÀbÉÃj, UÁæ«ÄÃt PÀÄrAiÀÄĪÀ ¤ÃgÀÄ ªÀÄvÀÄÛ £ÉʪÀÄð®å «¨sÁUÀ, ©ÃzÀgÀ
¸ÀASÉå: PÁ¤C/UÁæPÀĤãÉÊ«/©ÃzÀgÀ/vÁ±Á-6/mÉAqÀgÀ/2025-26/ ¢£ÁAPÀ: 15.05.2026
C¯ÁàªÀ¢ü mÉAqÀgï ¥ÀæPÀluÉ ¢é®PÉÆÃmÉ ¥ÀzÀÝw (E-¥ÉÆæPÀÆåªÉÄðAmï ªÀÄÆ®PÀ)
PÀ£ÁðlPÀ gÁdåzÀ ªÀiÁ£Àå gÁdå¥Á®gÀ ¥ÀgÀªÁV PÁAiÀÄð¤ªÁðºÀPÀ C©üAiÀÄAvÀgÀgÀÄ, UÁæ«ÄÃt PÀÄrAiÀÄĪÀ ¤ÃgÀÄ ªÀÄvÀÄÛ £ÉʪÀÄð®å «¨sÁUÀ, ©ÃzÀgÀ gÀªÀgÀÄ ¯ÉPÀÌ ²Ã¶ðPÉ KKRDB AiÉÆÃd£ÉAiÀÄr ªÀÄAdÆgÁzÀ F PɼÀPÀAqÀ PÁªÀÄUÁjUÉ PÉÃAzÀæ ¯ÉÆÃPÉÆÃ¥ÀAiÉÆÃV E¯ÁSÉ/PÀ£ÁðlPÀ gÁdå ¯ÉÆÃPÉÆÃ¥ÀAiÉÆÃV E¯ÁSÉAiÀÄ°è £ÉÆAzÁ¬ÄvÀ CºÀð ºÁUÀÆ E-¥ÉÆæPÀÆåªÉÄðAmï ¸ÀA¸ÉÜAiÀÄ°è £ÉÆAzÁ¬Ä¸À®àlÖ ¸ÁªÀiÁ£Àå UÀÄwÛUÉzÁgÀjAzÀ E¯ÁSÁ ¤AiÀĪÀĪÀ½AiÀÄ ªÉÄÃgÉUÉ E-¥ÉÆæPÀÆåªÉÄðAmï ªÀÄÄSÁAvÀgÀ LlAªÁgÀÄ mÉAqÀgïUÀ¼À£ÀÄß Standard Bid Document KW £ÀªÀÄÆ£ÉAiÀİè mÉAqÀgÀ£ÀÄß DºÁ餸À¯ÁVzÉ. ºÉaÑ£À «ªÀgÀ, µÀgÀvÀÄÛ ºÁUÀÆ ¤§AzsÀ£ÉUÀ½UÁV F PÀbÉÃjUÉ PÀbÉÃj ªÉüÉAiÀÄ°è ¸ÀA¥ÀQð¹ ºÁUÀÆ ªÉ¨ÉìöÊmï https://kppp.karnataka.gov.in ¸ÀA¥ÀQð¸À§ºÀÄzÁVzÉ.
mÉAqÀgÀ ¥ÀæQæAiÉÄ ¢£ÁAPÀUÀ¼ÀÄ:
1. mÉAqÀgÀ zÀ¸ÁÛªÉÃdÄUÀ¼À£ÀÄß ªÉ¨ï ¸ÉÊn¤AzÀ qË£À¯ÉÆÃqÀ ªÀiÁrPÉÆ¼ÀÄîªÀ ¢£ÁAPÀ : 16.05.2026 jAzÀ 25.05.20260ªÀgÉUÉ : 26.11.2024 jAzÀ 07.12.2024 ªÀgÉUÉ : 26.11.2024 jAzÀ 07.12.2024 ªÀgÉUÉ
2. ¨sÀwð ªÀiÁrzÀ mÉAqÀgÀ ¸À°è¸À®Ä PÉÆ£ÉAiÀÄ ¢£ÁAPÀ : 25.05.2026 gÀAzÀÄ 17:00 UÀAmÉAiÀĪÀgÉUÉ : 07.12.2024 gÀAzÀÄ 17:00 UÀAmÉAiÀĪÀgÉUÉ : 07.12.2024 gÀAzÀÄ 17:00 UÀAmÉAiÀĪÀgÉUÉ
3. vÁAwæPÀ ©qï vÉgÉAiÀÄĪÀ ¢£ÁAPÀ : 26.05.2026 gÀAzÀÄ 17.30 UÀAmÉAiÀÄ £ÀAvÀgÀ : 09.12.2024 gÀAzÀÄ 11.00 UÀAmÉAiÀÄ £ÀAvÀgÀ : 09.12.2024 gÀAzÀÄ 11.00 UÀAmÉAiÀÄ £ÀAvÀgÀ
4. DyðPÀ ©qï vÉgÉAiÀÄĪÀ ¢£ÁAPÀ : vÁAwæPÀ ©qï C£ÀÄªÉÆÃzÀ£ÉAiÀiÁzÀ £ÀAvÀgÀ
PÀæ. ¸ÀA. vÁ®ÆèPÀ PÁªÀÄUÁjUÀ¼À ºÉ¸ÀgÀÄ ªÀÄvÀÄÛ EAqÉAmï ¸ÀASÉå mÉAqÀgïUÉ EqÀ¯ÁzÀ ªÉÆvÀÛ (gÀÆ.UÀ¼À°è) E.JA.r. (gÀÆ.UÀ¼À°è) «ÄøÀ¯Áw PÁªÀÄUÁj ªÀÄÄV¸ÀĪÀ CªÀ¢ü UÀÄwÛUÉzÁgÀgÀ zÀeÉð
1 AURAD (B) Providing of Water Supply pipe line & OHT Work at Rampur Tanda Habitation of Chikli (J) Village in Aurad (B) Taluka Bidar District. RWSSD/2025-26/WT/WORK_INDENT9913 1677833.65 41950 ¸ÁªÀiÁ£Àå 90 ¢ªÀ¸ÀUÀ¼ÀÄ (ªÀļÉUÁ® ¸ÉÃj) 3£Éà zÀeÉð ºÁUÀÆ ªÉÄîàlÄÖ
2 AURAD (B) Providing of water supply pipe line and OHT work at Eknath Thanda Habitation of Chikli J Village In Aurad(B) in Bidar District RWSSD/2025-26/WT/WORK_INDENT9915 2516482.00 50500 ¸ÁªÀiÁ£Àå 90 ¢ªÀ¸ÀUÀ¼ÀÄ (ªÀļÉUÁ® ¸ÉÃj) 3£Éà zÀeÉð ºÁUÀÆ ªÉÄîàlÄÖ
3 AURAD (B) Providing of water supply pipe line and OHT work at Pooma Thanda Habitation of Jambgi Village In Aurad(B) in Bidar District RWSSD/2025-26/WS/WORK_INDENT9916 1677895.55 41200 ¸ÁªÀiÁ£Àå 90 ¢ªÀ¸ÀUÀ¼ÀÄ (ªÀļÉUÁ® ¸ÉÃj) 3£Éà zÀeÉð ºÁUÀÆ ªÉÄîàlÄÖ
4 BIDAR Drilling of Borewell & Providing pipeline at Yernalli, Malegaon, Kannalli, Gadgi, Solpur, Janwada, Aliamber, Kangti, Benaknalli and Hamilapur villages in Bidar taluka RWSSD/2026-27/WS/WORK_INDENT10075 4182042.27 83650 ¸ÁªÀiÁ£Àå 90 ¢ªÀ¸ÀUÀ¼ÀÄ (ªÀļÉUÁ® ¸ÉÃj) 3£Éà zÀeÉð ºÁUÀÆ ªÉÄîàlÄÖ
¸ÁªÀiÁ£Àå µÀgÀvÀÄÛUÀ¼ÀÄ:
1 Corrigendum ºÁUÀÆ addendum/ corrections EvÁå¢UÀ¼À£ÀÄß Website £À°è C¼ÀªÀr¸À¯ÁUÀĪÀÅzÀÄ.
2 UÀÄwÛUÉzÁgÀgÀÄ ¥ÀƪÀð CºÀðvÉUÁV PÉýgÀĪÀ zÀ¸ÁÛªÉÃdÄUÀ¼À ªÀÄÆ® ¥Àæw (Original copy) ¸ÁÌöå£ï ªÀiÁr Online £À°è ¸À°è¸À¨ÉÃPÀÄ. MAzÀÄ ªÉÃ¼É ¸À°è¹gÀĪÀ zÁ¸ÁÛªÉÃdÄUÀ¼À£ÀÄß vÀ¥ÀÄà ªÀiÁ»w ¸À°è¹zÀ°è, UÀÄwÛUÉzÁgÀgÀ ªÉÄÃ¯É ²¹Û£À PÀæªÀÄ dgÀÄV¸À¯ÁUÀĪÀÅzÀÄ.
3 AiÀıÀ¹é UÀÄwÛUÉzÁgÀgÀÄ M¥ÀàAzÀ ¥ÀvÀæzÀ (¨ÁAqï ¥ÉÃ¥Àgï) eÉÆvÉUÉ ¸ÀPÁðgÀ CzÉñÀzÀ£ÀéAiÀÄ Performance Security ªÉÆvÀÛªÀ£ÀÄß DD/ FDR/ NSC gÀÆ¥ÀzÀ°è PÁAiÀÄð¤ªÁðºÀPÀ C©üAiÀÄAvÀgÀgÀÄ, UÁæ«ÄÃt PÀÄrAiÀÄĪÀ ¤ÃgÀÄ ªÀÄvÀÄÛ £ÉʪÀÄð®å «¨sÁUÀ, ©ÃzÀgÀ gÀªÀgÀ ºÉ¸Àj£À°è CqÀªÀÅ (Pledge) ªÀiÁr PÀgÁgÀÄ M¥ÀàAzÀ ªÀiÁrPÉÆ¼ÀÄîªÀ ªÀÄÄAZÉ ¸À°è¹ PÁAiÀiÁðzÉñÀ ¥ÀqÉAiÀÄvÀPÀÌzÀÄÝ, vÀ¦àzÀݰè E.JA.r.AiÀÄ£ÀÄß ªÀÄÄlÄÖUÉÆÃ®Ä ºÁQPÉÆAqÀÄ mÉAqÀgÀ£ÀÄß gÀzÀÄÝ¥Àr¸À¯ÁUÀĪÀÅzÀÄ.
4 Cfð ±ÀĮ̪À£ÀÄß AiÀiÁªÀÅzÉà PÁgÀtPÀÆÌ »AwgÀÄV¸À¯ÁUÀĪÀÅ¢®è.
5 GST & PANCARD Certificate ¸À°è¸ÀvÀÌzÀÄÝ
6 Similar nature of work done certifcate minimum 50percent of amount put to tender and workdone certifcate issued by Not below the Executive Engineer
7 Annual Turnover Certifcate Should be UDIAN no
8 Valid PWD CONTRACTOR Registration Certifcate ¸À°è¸ÀvÀÌzÀÄÝ
9 Other relevant Documents As per KW standard document and tender notifcation and as per KPPP General Conditions
10 ¢é®PÉÆÃmÉAiÀÄ mÉAqÀgÀUÀ½UÉ mÉAqÀgÀ ªÉÆvÀÛQÌAvÀ PÀrªÉÄ ªÉÆvÀÛzÀ LlAªÁgÀÄ zÀgÀªÀ£ÀÄß £ÀªÀÄÆ¢¹zÀ°è MlÄÖ ªÀåvÁå¸À ªÉÆvÀÛzÀ r.r./J¥sï.r.Dgï AiÀÄ£ÀÄß PÀgÁgÀÄ M¥ÀàAzÀ ªÀiÁrPÉÆ¼ÀÄîªÀ ªÉÆzÀ®Ä F PɼÀUÉ ¸À» ªÀiÁrzÀªÀgÀ ºÉ¸ÀgÀ£À°è ¥ÀqÉzÀÄ, PÀqÁØAiÀĪÁV F PÀbÉÃjUÉ ¸À°è¸ÀvÀPÀÌzÀÄÝ «¥sÀ®gÁzÀ mÉAqÀgÀUÀ¼À£ÀÄß wgÀ¸ÀÌj¸À¯ÁUÀĪÀÅzÀÄ, ªÁåvÁå¸ÀzÀ r.r. ºÉZÀÄѪÀj CªÀ±ÀåPÀvÉ EzÀ°è PÀgÁgÀÄ M¥ÀàAzÀ ¸ÀªÀÄAiÀÄzÀ°è ¸À°è¸ÀvÀÌzÀÄÝ ºÁUÀÆ ªÀåvÁÛ¸ÀzÀ r.r. ¸À°è¸À®Ä «¥sÀ®gÁzÀ UÀÄwÛUÉzÁgÀgÀ mÉAqÀgÀUÀ¼À£ÀÄß wgÀ¸ÀÌj¸À¯ÁUÀĪÀÅzÀÄ.
11 ¸ÁªÀðd¤PÀ ¸ÀAUÀæºÀuÉAiÀÄ «±ÉõÀ PÁAiÉÄÝ 2000 zÀAvÉ UÉÆvÀÄÛ¥Àr¹gÀĪÀ ¥ÁgÀzÀ²ðPÉAiÀÄ ¤AiÀĪÀÄ ¤§AzsÀ£ÉUÀ¼ÀÄ C£ÀéAiÀĪÁUÀÄvÀÛzÉ.
12 UÀÄwÛUÉzÁgÀgÀÄ ¤ªÀð»¹zÀ PÁªÀÄUÁjUÀ¼À UÀÄtªÀÄlÖ CvÀÄåvÀÛªÀÄ DVgÀ¨ÉÃPÀÄ ºÁUÀÆ ¥Àæw ©°è£À eÉÆvÉUÉ ªÀÄÆgÀ£Éà vÀAqÀzÀ vÀ¥Á¸ÀuÉ ªÀgÀ¢ ºÁUÀÆ PÁªÀÄUÁjAiÀÄ f.¦.J¸ï bÁAiÀiÁ avÀæUÀ¼À£ÀÄß PÀqÁØAiÀĪÁV ¸À°è¸À¨ÉÃPÁVgÀÄvÀÛzÉ.
13 PÁªÀÄUÁjAiÀÄ£ÀÄß ¥ÁægÀA©ü¸ÀĪÀ ªÀÄÄ£Àß, ¥ÀæUÀwAiÀİègÀĪÀ ºÁUÀÆ ¥ÀÆtðUÉÆAqÀ £ÀAvÀgÀ 3 ºÀAvÀzÀ bÁAiÀÄ avÀæUÀ¼À£ÀÄß zÁR¯ÉUÉ ¸À°è¸À¨ÉÃPÀÄ.
14 E¯ÁSɬÄAzÀ AiÀiÁªÀÅzÉà ¸ÁªÀiÁVæUÀ¼À£ÀÄß ¸ÀgÀ§gÁdÄ ªÀiÁqÀĪÀÅ¢®è, PÁªÀÄUÁjUÉ CªÀ±ÀåPÀ«gÀĪÀ ¸ÁªÀÄVæUÀ¼À£ÀÄß ¨sÁgÀwÃAiÀÄ ªÀiÁ£ÀPÀ ¸ÀA¸ÉÜAiÀÄ UÀÄtªÀÄlÖzÀAvÉ UÀÄwÛUÉzÁgÀgÉà ¸ÀéAvÀ Rað£À°èAiÉÄà Rjâ ªÀiÁqÀ¨ÉÃPÀÄ
15 UÀÄwÛUÉzÁgÀgÀÄ mÉAqÀgÀ ¥ÀæPÀluÉAiÀİègÀĪÀ µÀgÀvÀÄÛUÀ¼ÉÆA¢UÉ Standard Bid Document £À°è £ÀªÀÄÆ¢¹gÀĪÀ µÀgÀvÀÄÛUÀ¼À£ÀÄß ¸ÀºÀ PÀqÁØAiÀĪÁV M¦àPÉÆ¼Àî¨ÉÃPÁVgÀÄvÀÛzÉ.
16 ¤¨sÀðAzÀ£ÉAiÀÄÄPÀÛ mÉAqÀgÀ£ÀÄß ¥ÀjUÀt¸À¯ÁUÀĪÀÅ¢®è ºÁUÀÆ Joint VenturesUÀ¼À£ÀÄß ¥ÀjUÀt¸À¯ÁUÀĪÀÅ¢®è.
17 ¸ÀPÁðgÀzÀ DzÉñÀ ¸ÀASÉå: LD 300 LET 2006 ¢£ÁAPÀ: 18.01.2007gÀAvÉ PÁ«ÄðPÀgÀ PÀ¯Áåt ¤¢üUÉ ±ÉÃ: 1.00gÀµÀÄÖ ¥ÁªÀwAiÀÄ §UÉÎ UÀÄwÛUÉ PÀgÁj£À°è ¸ÉÃ¥Àðr¸ÀĪÀÅzÀÄ.
18 ªÁ¸ÀÛ«PÀ PÉ®¸À ªÀÄÄPÁÛAiÀÄ CªÀ¢üAiÀÄ£ÀÄß PÀgÁgÀÄ M¥ÀàAzÀzÀ ¸ÀªÀÄAiÀÄzÀ°è ¤ÃqÀ¯ÁUÀĪÀÅzÀÄ.
19 AiÀiÁªÀÅzÉà PÁgÀtPÀÆÌ ¤UÀ¢¥Àr¹zÀ PÉÆ£ÉAiÀÄ ¢£ÁAPÀzÀAzÀÄ ¸ÀA¥ÀPÀðeÁ® ¹UÀ¢zÀÝgÉ ºÁUÀÆ AiÀiÁªÀÅzÉà vÁAwæPÀ zÉÆÃµÀ GAmÁzÀ°è (Technical Problems & Omitions & Corrections) F PÀZÉÃj dªÁ¨ÁÝgÀ DUÀĪÀÅ¢®è.
20 PÁªÀÄUÁjUÀ¼À£ÀÄß vÀÈ¥ÀÛPÀgÀªÁV ¥ÀÆtðUÉÆ½¹zÀ ¢£ÁAPÀ¢AzÀ MAzÀÄ ªÀµÀðzÀªÀjUÉ PÁªÀÄUÁjAiÀÄ ¤ªÀðºÀuÁ ¯ÉÆÃ¥ÀUÀ½UÉ UÀÄwÛUÉzÁgÀgÉà dªÁ¨ÁÝgÀgÁVgÀÄvÁÛgÉ.
21 PÁªÀÄUÁjUÀ¼ÀÄ ºÁUÀÆ EvÀgÉ ºÉaÑ£À «ªÀgÀUÀ½UÁV Website: https://kppp.karnataka.gov.inºÁUÀÆ PɼÀUÉ ¸À» ªÀiÁrgÀĪÀ C¢üPÁjUÀ¼À PÀZÉÃj¬ÄAzÀ PÉ®¸ÀzÀ ¸ÀªÀÄAiÀÄzÀ°è ¸ÀA¥ÀQð¸À§ºÀÄzÀÄ.
22 mÉAqÀgÀUÀ¼À£ÀÄß AiÀiÁªÀÅzÉà ºÀAvÀzÀ°è PÁgÀt ¤ÃqÀzÉ ¹éÃPÀj¸ÀĪÀ CxÀªÁ wgÀ¸ÀÌj¸ÀĪÀ ºÀPÀÄÌ PɼÀUÉ ¸À» ªÀiÁrgÀĪÀ C¢üPÁjUÀ¼ÀÄ/ mÉAqÀgÀ ¸À«ÄwAiÀÄÄ PÁ¬ÄÝj¹PÉÆArgÀÄvÀÛzÉ.
23 PÀ¥ÀÄà ¥ÀnÖAiÀÄ°è ¸ÉÃj¸À®Ä ¥Àæ¸ÁÛ¦¹gÀĪÀ UÀÄwÛUÉzÁgÀgÀÄ ºÁUÀÆ PÀ¥ÀÄà ¥ÀnÖ ¥ÀæPÀn¸À¯ÁzÀ UÀÄwÛUÉzÁgÀgÀÄ ¸ÀzÀj mÉAqÀgÀUÀ½UÉ CºÀðgÁVgÀĪÀÅ¢®è.
24 ¤§AzsÀ£ÉUÉÆ¼À¥ÀqÀzÀ mÉAqÀgÀUÀ¼À£ÀÄß wgÀ¸ÀÌj¸À¯ÁUÀĪÀÅzÀÄ.
25 F ªÉÄð£À µÀgÀvÀÄÛUÀ¼ÉÆA¢UÉ E-¥ÉÆæPÀÆåªÉÄðAmï£À°è£À µÀgÀvÀÄÛUÀ¼À£ÀÄß PÀqÁØAiÀĪÁV ¥Á°¸ÀvÀPÀÌzÀÄÝ.
26 UÀÄwÛUÉzÁgÀgÀÄ J¯Áè PÁªÀÄUÁjUÀ®£ÀÄß ¥ÀÆwðUÉÆ½¹zÀ ¢£ÁAPÀ¢AzÀ MAzÀÄ ªÀµÀðzÀªÀgÉUÉ ¸ÀéAvÀ Rað£À°è ¤ªÀðºÀuÉ ªÀiÁqÀ¨ÉÃPÁVgÀÄvÀÛzÉ ºÁUÀÆ MAzÀÄ ªÀµÀðzÀªÀgÉUÉ Performance Security ©qÀÄUÀqÉ ªÀiÁqÀĪÀÅ¢®è ºÁUÀÆ ªÁåvÁå¸ÀzÀ r.r.AiÀÄ£ÀÄß PÁªÀÄUÁj ¥ÀÆtðUÉÆ½¹zÀ £ÀAvÀgÀ »AwgÀÄV¸À¯ÁUÀĪÀÅzÀÄ.
27 PÁªÀÄUÁj ¤ªÀð»¸ÀĪÀ ¸ÀªÀÄAiÀÄzÀ°è AiÀiÁªÀÅzÉà ºÁ¤/¥Áæt¥ÁAiÀÄ ¸ÀA¨sÀ«¹zÀ°è ªÉZÀÑ£ÀªÀ£ÀÄ UÀÄwÛUÉzÁgÀgÉà ¨sÀj¸À¨ÉÃPÁUÀÄvÀÛzÉ. ¤UÀ¢üvÀ ªÉüÉAiÀÄ°è ¥ÀæUÀwAiÀÄ£ÀÄß ¸Á¢¸À¢zÀݰè C£ÀÄzÁ£ÀzÀ ®¨sÀåvÉAiÀÄ£ÀÄß DzÀj¹ ©®ÄèUÀ¼À£ÀÄß ¥ÁªÀw¸À¯ÁUÀĪÀÅzÀÄ.
28 AiÀiÁªÀ PÁgÀtªÀ£ÀÄß w½¸ÀzÉ, AiÀiÁªÀÅzÉà CxÀªÁ J¯Áè mÉAqÀgÀUÀ¼À£ÀÄß ¹éÃPÀj¸ÀĪÀ CxÀªÁ ¤gÁPÀj¸ÀĪÀ ºÀPÀÄÌ F PɼÀUÉ ¸À» ªÀiÁrgÀĪÀ C¢üPÁjAiÀÄÄ PÁ¬ÄÝj¹PÉÆArgÀÄvÁÛgÉ.
29 EvÀgÉ mÉAqÀgÀ µÀgÀvÀÄÛUÀ¼ÀÄ PÉ.qÀ§Æèöå. qÁPÀĪÉÄÃAmï https://kppp.karnataka.gov.in & as per KW ¥ÀæPÁgÀ CAwªÀÄ EgÀÄvÀÛzÉ.
PÁAiÀÄð¥Á®PÀ C©üAiÀÄAvÀgÀgÀÄ UÁææ.PÀÄ.¤Ã. ªÀÄvÀÄÛ £ÉʪÀÄð®å «¨sÁUÀ, ©ÃzÀgÀ
¥ÀæwAiÀÄ£ÀÄß zÀAiÀiÁ¥ÀgÀ ªÀiÁ»wUÁV ¸À°è¸À¯ÁVzÉ:
ªÀÄÄRå EAf¤ÃAiÀÄgÀgÀÄ, UÁææ.PÀÄ.¤Ã. ªÀÄvÀÄÛ £ÉʪÀÄð®å E¯ÁSÉ, ¨ÉAUÀ¼ÀÆgÀÄ.
C¢üÃPÀëPÀ C©üAiÀÄAvÀgÀgÀÄ, UÁææ.PÀÄ.¤Ã. ªÀÄvÀÄÛ £ÉʪÀÄð®å ªÀÈvÀÛ, UÀÄ®§UÁð.
f¯Áè¢üPÁjUÀ¼ÀÄ, ©ÃzÀgÀ ºÁUÀÆ f¯Áè mÉAqÀgÀ §Ä¯Én£ï C¢üPÁjUÀ¼ÀÄ, ©ÃzÀgÀ.
ªÀÄÄRå PÁAiÀÄð¤ªÁðºÀPÀ C¢üPÁjUÀ¼ÀÄ, f¯Áè ¥ÀAZÁAiÀÄvÀ, ©ÃzÀgÀ.
¥ÀæwAiÀÄ£ÀÄß ªÀiÁ»wUÁV ºÁUÀÆ ¸ÀÆPÀÛ PÀæªÀÄPÁÌV gÀªÁ¤¸À¯ÁVzÉ:
F «¨sÁUÀzÀ ¯ÉPÀÌ ¥ÀvÀæ ±ÁSÉUÉ.
¸ÀºÁAiÀÄPÀ PÁAiÀÄð¤ªÁðºÀPÀ C©üAiÀÄAvÀgÀgÀÄ, UÁææ.PÀÄ.¤Ã. ªÀÄvÀÄÛ £ÉʪÀÄð®å G¥À-«¨sÁUÀ ¨sÁ°Ì.
PÁAiÀÄð¥Á®PÀ C©üAiÀÄAvÀgÀgÀÄ
UÁææ.PÀÄ.¤Ã. ªÀÄvÀÄÛ £ÉʪÀÄð®å «¨sÁUÀ, ©ÃzÀgÀ
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
TENDER Notification KKRDB.xls
Instructions to Tenderers • 0.04 MB
kw-2.docx
Tender Document • 0.23 MB
World Bank guidelines.PDF
Instructions to Tenderers • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .