| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.2 LAccepted-AOC | L1 | Accepted-AOC Accepted being L1 | |
| 2 | L2₹49.7 L+₹81,134.56 (1.66%)Rejected-Finance | L2 | Rejected-Finance Rejected being higher than L1 | |
| 3 | L3₹50.1 L+₹1.2 L (2.48%)Rejected-Finance 43 SABJI MAHAL ORDERLY BAZAR PO BARRACKPORE DIST 24 PARGANAS N KOLKATA 700120 | KOLKATA | 24 PARGANAS N | WEST BENGAL | 700120 | L3 | Rejected-Finance Rejected being higher than L1 | |
| 4 | L4₹50.8 L+₹1.8 L (3.78%)Rejected-Finance 10 MAKHAN LAL SADHUKHAN LANE PO PS BARRACKPORE KOLKATA 700120 W B | KOLKATA | NORTH 24 PARGANAS | WEST BENGAL | 700120 | L4 | Rejected-Finance Rejected being higher than L1 | |
| 5 | L5₹51.3 L+₹2.4 L (4.89%)Rejected-Finance 99 C PIPE ROAD CHINIAMORE PO BARRACKPORE PS TITAGARH DIST 24 PARGANAS N KOLKATA 700120 WB | KOLKATA | NORTH 24 PARGANAS | WEST BENGAL | 700120 | L5 | Rejected-Finance Rejected being higher than L1 |
| Sl No | Description | Qty | Unit | TAPAS ENGINEERING CO L2 | R K CONSTRUCTION L4 | S.C. TRADING COMPANY L3 | Das and Brothers L7 | Renuka Fero Products L5 | NC BOSE AND CO L8 | CHANDRA CONSTRUCTION & CO. L1 | PIONEER L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down cement plaster of any description built in cement mortar on brick or stone walls etc including racking out joints, hacking for key, scrubbing down with water etc. and removing debrish from site complete all as specified and directed. | 250 | Sqm | 85 ₹21,250 | 102 ₹25,500 | 95 ₹23,750 | 121 ₹30,250 | 104.5 ₹26,125 | 126 ₹31,500 | 84 ₹21,000 Lowest | 111 ₹27,750 |
| 2.00 | Demolition of brick work or stone boulder masonry, built in cement mortar including all quoins, arches, pillars etc. including removing of unserviciable material from site complete all as specified and directed. | 4.5 | Cum | 681 ₹3,064.5 | 687 ₹3,091.5 | 695 ₹3,127.5 | 691 ₹3,109.5 | 716 ₹3,222 | 703 ₹3,163.5 | 680 ₹3,060 Lowest | 694 ₹3,123 |
| 3.00 | Demolition of cement concrete (unreinforced) of any description and in any position not otherwise specifically provided including removing of rubish from site complete all as specified and directed. | 7 | Cum | 1,182 ₹8,274 | 1,217 ₹8,519 | 1,200 ₹8,400 | 1,241 ₹8,687 | 1,187 ₹8,309 | 1,254 ₹8,778 | 1,180 ₹8,260 Lowest | 1,227 ₹8,589 |
| 4.00 | Demolition of cement concrete (reinforced) of any description and in any position not otherwise specifically provided including reinforcement cut as required to facilitate demolition and removing debries from site of work completeall as specified and directed. | 1.5 | Cum | 1,651 ₹2,476.5 | 1,662 ₹2,493 | 1,652 ₹2,478 | 1,671 ₹2,506.5 | 1,658 ₹2,487 | 1,675 ₹2,512.5 | 1,650 ₹2,475 Lowest | 1,667 ₹2,500.5 |
| 5.00 | Dismantling of timber scantling 40 Sqcm and over in section, in any position in framed work and removing materials from site of work complete all as specified and directed. | 0.25 | Cum | 821 ₹205.25 | 854 ₹213.5 | 840 ₹210 | 881 ₹220.25 | 826 ₹206.5 | 889 ₹222.25 | 820 ₹205 Lowest | 867 ₹216.75 |
| 6.00 | Dismantling of wrought iron or mild steel work of any description not otherwise provided for and removing materials from site of work complete all as specified and directed. | 2.79 | Qtl | 652 ₹1,819.08 | 682 ₹1,902.78 | 960 ₹2,678.4 | 681 ₹1,899.99 | 659 ₹1,838.61 | 684 ₹1,908.36 | 650 ₹1,813.5 Lowest | 687 ₹1,916.73 |
| 7.00 | Dismantling of floor, hearth or wall tiling including cement mortar bedding (but not backing) and rubbish off the premises complete all as specified and directed. | 450 | Sqm | 78 ₹35,100 | 92 ₹41,400 | 85 ₹38,250 | 110 ₹49,500 | 85 ₹38,250 | 116 ₹52,200 | 75 ₹33,750 Lowest | 106 ₹47,700 |
| 8.00 | Dismantling of stone slabs and tiles laid dry of any description or thickness in floors, aprons etc. complete all as specified and directed. | 3.7 | 10 Sqm | 453 ₹1,676.1 | 472 ₹1,746.4 | 460 ₹1,702 | 491 ₹1,816.7 | 458 ₹1,694.6 | 504 ₹1,864.8 | 450 ₹1,665 Lowest | 479 ₹1,772.3 |
| 9.00 | Taking down chowkats or frames with shutters n.exc. 1.50 Sqm each (without taking off shutters from the frames) complete all as specified and directed. | 22 | Each | 255 ₹5,610 | 272 ₹5,984 | 268 ₹5,896 | 291 ₹6,402 | 260 ₹5,720 | 296 ₹6,512 | 250 ₹5,500 Lowest | 279 ₹6,138 |
| 10.00 | Taking down chowkats or frames with shutters exc. 1.50 sqm but n.exc 4.00 sqm each (without taking off shutters from the frames) complete all as specified and directed. | 22 | Each | 301 ₹6,622 | 316 ₹6,952 | 315 ₹6,930 | 341 ₹7,502 | 307 ₹6,754 | 348 ₹7,656 | 300 ₹6,600 Lowest | 329 ₹7,238 |
Tender Value
Refer Docs
EMD Value
₹87,200
Closing Date
30 Sept 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE AF Barrackpore
GE AF Barrackpore Post Barrackpore Dist 24 Parganas North Kolkata 700120
UPGRADATION OF BUILDING NO 100 (PHASE-I) AT AF STN BARRACKPORE UNDER GE (AF) BARRACKPORE
2026_MES_788475_1
8763/E8
Open Tender
Civil Works
Item Rate
210 days
GE AF Barrackpore
Class- D, Category- a(i)
2 documents required · 2 mandatory
₹500
GE AF Barrackpore
₹87,200
Yes
2 Nov 2026
9 Sept 2026
3 Oct 2026
9 Sept 2026
30 Sept 2026
23 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down cement plaster of any description built in cement mortar on brick or stone walls etc including racking out joints, hacking for key, scrubbing down with water etc. and removing debrish from site complete all as specified and directed. | 250 | Sqm | 100 | ₹25,000 |
| 2 | Demolition of brick work or stone boulder masonry, built in cement mortar including all quoins, arches, pillars etc. including removing of unserviciable material from site complete all as specified and directed. | 4.5 | Cum | 213 | ₹958.5 |
| 3 | Demolition of cement concrete (unreinforced) of any description and in any position not otherwise specifically provided including removing of rubish from site complete all as specified and directed. | 7 | Cum | 100 | ₹700 |
| 4 | Demolition of cement concrete (reinforced) of any description and in any position not otherwise specifically provided including reinforcement cut as required to facilitate demolition and removing debries from site of work completeall as specified and directed. | 1.5 | Cum | 213 | ₹319.5 |
| 5 | Dismantling of timber scantling 40 Sqcm and over in section, in any position in framed work and removing materials from site of work complete all as specified and directed. | 0.25 | Cum | 123 | ₹30.75 |
| 6 | Dismantling of wrought iron or mild steel work of any description not otherwise provided for and removing materials from site of work complete all as specified and directed. | 2.79 | Qtl | 123 | ₹343.17 |
| 7 | Dismantling of floor, hearth or wall tiling including cement mortar bedding (but not backing) and rubbish off the premises complete all as specified and directed. | 450 | Sqm | 114 | ₹51,300 |
| 8 | Dismantling of stone slabs and tiles laid dry of any description or thickness in floors, aprons etc. complete all as specified and directed. | 3.7 | 10 Sqm | 123 | ₹455.1 |
| 9 | Taking down chowkats or frames with shutters n.exc. 1.50 Sqm each (without taking off shutters from the frames) complete all as specified and directed. | 22 | Each | 123 | ₹2,706 |
| 10 | Taking down chowkats or frames with shutters exc. 1.50 sqm but n.exc 4.00 sqm each (without taking off shutters from the frames) complete all as specified and directed. | 22 | Each | 123 | ₹2,706 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Tenderdocuments8763.pdf
Tender Documents • 1.47 MB
BOQ_883799.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .