Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.3 LAccepted-AOC PALAMU | ₹32.3 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹35.4 LRejected-AOC AT NIJMA PUSO SISAI GUMLA JHARKHAND 835302 | LOHARDAGA | JHARKHAND | 835302 | ₹35.4 L | L2 | Rejected-AOC L2 Bidder |
Tender Value
₹42.2 L
EMD Value
₹84,500
Closing Date
24 Apr 2026, 4:00 pmClosed
Executive Engineer, D.W. and S. Division Gumla
Executive Engineer, D.W. and S. Division Gumla
Relocation of Tube Well by Drilling 125/115 mm dia and 70 Mtr deep drilled Tube Well in all kinds of soil rock for installation of hand pump under DW and S Division Gumla for the year 2026-27 No of DT 47 Nos
2026_DWSD_113060_1
02/2026-27
Open Tender
Civil Works - Water Works
90 days
Gumla
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹84,500
10 Jun 2026
17 Apr 2026
25 Apr 2026
17 Apr 2026
24 Apr 2026
18 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DEEP DRILLED TUBE WELL OF 125/115 MM DIA, 70 MTRS WITH INSTALLATION OF INDIA MARK II (IS:15500 Part-2/2004) HAND PUMP. | - | - | - | - |
| 2 | A. Drilling Portion
Construction for 115/125 mm dia drilled Tube-Well for drilling in all kinds of soil rock for installation of hand pump with D.T.H Rig machine all complete including supplying all materials, labours, tools, drilling, rigs, air compressor and equipments as well as fuel lubricant for making 125/115 mm dia boring etcand cost of transporting rig machine and other vehicle up to site work as per specification and direction of Engineer-in-charge. | - | - | - | - |
| 3 | (a) Up to 30mtr. Depth bellow G.L. in Rural Areas | - | P/M | - | - |
| 4 | (b) Beyond 30mtr. In Rural Areas | - | P/M | - | - |
| 5 | Providing all equipments and labour for lowering 125mm dia blue UPVC Casing pipe as casing for protecting the side from falling during the process of drilling all complete job including carriage of material to work site. | - | P/M | - | - |
| 6 | Supplying labour cement and calcium chloride or bentonite solution and equipments for Grouting to Casing Pipe all complete job including carriage of material to work site as per specification & direction of E/I | - | Each | - | - |
| 7 | Supplying all tools, equipments and labour and doing washing, flushing, and developing of drilled tube well to give clean and clear water all complete job as per direction of E/I. | - | Per Hr. | - | - |
| 8 | Supplying all materials labours and equipment including 125 mm dia GI/CI cap 125 mm dia T/W properly all complete and taking it out as per specification & direction of E/I. (the cap will be property of department) | - | Each | - | - |
| 9 | B. Civil Portion
Supplying all tools, equipment, labours and lowering 32 mm dia G.I. (Medium) pipe in DT in 3 mtr. Length all complete job as per direction of E/I. Including carriage of materials. | - | Per Mtrs | - | - |
| 10 | Supplying all tools, Labour for fitting and fixing deep well cylinder with necessary connecting rod all complete job as per specification & direction of E/I. | - | Each | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
GML_SR_DT_70M_Technical.pdf
Tender Documents • 1.88 MB
BOQ_152650.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid