Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹55.7 LAccepted-AOC | ₹55.7 L Quoted ₹56.3 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | Kortas Industries Private Limited L1 |
|---|---|---|---|---|
| 1.00 | Cost of SPLF RH pin Pull test | 15 | Set | 48,000 ₹7.2 L |
| 2.00 | Cost of SPLF band proof loading | 15 | Set | 50,000 ₹7.5 L |
| 3.00 | Cost of SPLF band tensioning fixture fabrication | 2 | Set | 2,50,000 ₹5 L |
| 4.00 | Cost of SPLF Band thickness mapping, buffing ,Visual inspection & NDT | 15 | Set | 44,000 ₹6.6 L |
| 5.00 | Cost of SPLF RH pin proof loading fixture Assy realisation | 2 | Set | 90,000 ₹1.8 L |
| 6.00 | Cost of SPLF Fixture proof loading components fabrication
(indicative) | 2 | Set | 70,000 ₹1.4 L |
| 7.00 | Raw material cost for SPLF band tensioning fixture (indicative) | 2 | Set | 1,00,000 ₹2 L |
| 8.00 | Raw material cost SPLF RH pin proof loading fixture Assy (indicative) | 2 | Set | 40,000 ₹80,000 |
| 9.00 | Raw material cost SPLF Fixture proof loading components (indicative) | 2 | Set | 40,000 ₹80,000 |
| 10.00 | Cost of SPLF band tensioning tool fabrication | 4 | Set | - |
Updated dates
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
29 Oct 2025, 2:00 pmClosed
Purchase
NSIL, Bengaluru
Assembly and Testing of SPLF Separation System Components
2025_NSIL_246155_1
NSIL/25-26/RFP-1B/SPLF Separation System/01
Limited
Miscellaneous Works
VSSC, Trivandrum
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹1 L
Yes
23 Mar 2026
22 Aug 2025
30 Oct 2025
22 Aug 2025
29 Oct 2025
27 Aug 2025
Amount
Cost of SPLF RH pin Pull test
Cost of SPLF band proof loading
Cost of SPLF band tensioning fixture fabrication
Cost of SPLF Band thickness mapping, buffing ,Visual inspection & NDT
Cost of SPLF RH pin proof loading fixture Assy realisation
Cost of SPLF Fixture proof loading components fabrication (indicative)
Raw material cost for SPLF band tensioning fixture (indicative)
Raw material cost SPLF RH pin proof loading fixture Assy (indicative)
Raw material cost SPLF Fixture proof loading components (indicative)
Cost of SPLF band tensioning tool fabrication
Cost of SPLF wedge block assembly
Container cost (As per RFP Document table 14)
Consumable cost (indicative)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
Download all tender documents and submit your bid