Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.2 LAccepted-AOC VILLAGE AGRAJULII P O BHAIRANKUNDA P S UDALGURI DISTRICT UDALGURI ASSAM | UDALGURI | UDALGURI | ASSAM | ₹30.2 L Quoted ₹1.7 Cr | L1 | Accepted-AOC Awarded |
| 2 | L1₹1.4 CrAccepted-AOC C O LT JOGENDRA BASUMATARY NAHARBARI MAZBAT P O P S MAZBAT DIST KAMRUP METRO ASSAM PIN 784507 | MAZBAT | KAMRUP METRO | ASSAM | 784507 | ₹1.4 Cr Quoted ₹1.7 Cr | L1 | Accepted-AOC Awarded |
| 3 | L1₹1.7 CrRejected-AOC MAZBAT P O P S MAZBAT DISTRICT UDALGURI PIN 784125 | MAZBAT | UDALGURI | ASSAM | 784125 | ₹1.7 Cr | L1 | Rejected-AOC Notawarded |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not admitted |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not admitted |
| Sl No | Description | Qty | Unit | Pankaj Boro L1 | BICHITRA BASUMATARY L1 | DHARMESWAR GOYARI L1 |
|---|---|---|---|---|---|---|
| 1.00Construction of D/S Sheet piling | ||||||
| 1.01 | Providing and driving 'Z' type steel sheet pile of 0.69 M effective width, 8 mm thick and average weight 68.30 kg/M to specified level and lines including cutting to proper size, making holes including painting sheet piles with two coats of anticorrosive bitumen paint and dewatering including necessary tools and plants and all other accessories, complete as directed. (Portion of sheet pile are to be embedded in concrete shall not be painted). | 48 | sqm | 22,424.26 ₹10.8 L | 22,424.48 ₹10.8 L | 22,424.48 ₹10.8 L |
| 1.02 | C.C work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc.with hard broken stone agg. of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc.where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately). | 203.2 | cum | 8,236.96 ₹16.7 L | 8,236.78 ₹16.7 L | 8,236.78 ₹16.7 L |
| 1.03 | Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying complete as directed. | 14.73 | Qntl | 11,813.76 ₹1.7 L | 11,815.24 ₹1.7 L | 11,815.24 ₹1.7 L |
| 1.04 | Earthwork in excavation and removal of swelled up earth mixed with silt and slurry due to sand, bailing out water in foundation trenches upto required level including shuttering, shoring, dewatering by means of pump set etc. removing the spoils to a safer distance etc, complete as directed. (ii) With dewatering | 30 | cum | 2,959.64 ₹88,789.20 | 2,959.65 ₹88,789.50 | 2,959.65 ₹88,789.50 |
| 1.05 | Earthwork in excavation in diversion / feeder channel to the design section and grade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain water
necessary complete as directed with a lead upto 30 M and lift upto 1.50 M. | 150 | cum | 281.91 ₹42,286.50 | 281.88 ₹42,282 | 281.88 ₹42,282 |
| 2.00Construction of Toe wall | ||||||
| 2.01 | Earthwork in excavation and removal of swelled up earth mixed with silt and slurry due to sand, bailing out water in foundation trenches upto required level including shuttering, shoring, dewatering by means of pump set etc. removing the spoils to a safer distance etc, complete as directed. | 1,012.4 | cum | 2,959.65 ₹30.0 L | 2,959.61 ₹30.0 L | 2,959.61 ₹30.0 L |
| 2.02 | CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing, bailing out water with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately). | 99.9 | cum | 8,669 ₹8.7 L | 8,668.81 ₹8.7 L | 8,668.81 ₹8.7 L |
| 2.03 | Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). | 1,318.92 | sqm | 342.82 ₹4.5 L | 342.82 ₹4.5 L | 342.82 ₹4.5 L |
Tender Value
₹1.9 Cr
EMD Value
₹3.7 L
Closing Date
26 Feb 2026, 2:00 pmClosed
Chief Engineer Irrigation Assam
o-o the Chief Engineer Irrigation Assam Chandmari , Guwahati-03
Protection work at Restrengthening of D/S Floor along with Erosion Protection works at Guide Bund of Kundarbil FIS under SDMF for the year 2025-26 under Udalguri Mazbat Division (Irrigation), Udalguri Package_7
2026_ID_50784_7
NIT NO.8 (SDMF) 2025-26 Date_03.02.2026
Open Tender
Civil Works
365 days
Udalguri
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,700
₹3.7 L
Yes
o-o the Chief Engineer Irrigation Assam Chandmari
8 May 2026
4 Feb 2026
26 Feb 2026
4 Feb 2026
26 Feb 2026
10 Feb 2026
6 Feb 2026
Construction of D/S Sheet piling
Providing and driving 'Z' type steel sheet pile of 0.69 M effective width, 8 mm thick and average weight 68.30 kg/M to specified level and lines including cutting to proper size, making holes including painting sheet piles with two coats of anticorrosive bitumen paint and dewatering including necessary tools and plants and all other accessories, complete as directed. (Portion of sheet pile are to be embedded in concrete shall not be painted).
C.C work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc.with hard broken stone agg. of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc.where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying complete as directed.
Earthwork in excavation and removal of swelled up earth mixed with silt and slurry due to sand, bailing out water in foundation trenches upto required level including shuttering, shoring, dewatering by means of pump set etc. removing the spoils to a safer distance etc, complete as directed. (ii) With dewatering
Earthwork in excavation in diversion / feeder channel to the design section and grade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain water necessary complete as directed with a lead upto 30 M and lift upto 1.50 M.
Construction of Toe wall
Earthwork in excavation and removal of swelled up earth mixed with silt and slurry due to sand, bailing out water in foundation trenches upto required level including shuttering, shoring, dewatering by means of pump set etc. removing the spoils to a safer distance etc, complete as directed.
CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing, bailing out water with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered).
RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Supplying fitting fixing and laying reinforcement (TATA)in position in RCC work including cutting, bending,cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
Collection of hard river gravel, chips of size 6 mm to 20 mm free from dust and dirt from quarry including loading and unloading etc, complete as directed
Labour charges for spreading hard river shingles / sand gravels to required thickness over approach subway etc. including ramming, dressing the seat before laying the materials lead upto 30 M and lift 1.50 M, complete as directed.
Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site completed as directed. Quarry = Distance = 20.00 Km For First KM
Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site completed as directed. Quarry = Distance = 20.00 Km For Subsequent Kms
Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Earthwork in filling in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 km including paying compensation of earth obtained from private land if any loading, unloading, spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment, profiling etc. with all lift complete as directed (Payment will be made after deduction of 12.50% shrinkage allowance from the gross quantity).
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
Kundarbil.pdf
Tender Documents • 1.49 MB
BOQ_80820.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid